Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

MG-RAVENS: Working Group Update [Slides]

Problem Statement: Users in industry, who are planning the deployment and operation of microgrids, face a multi-domain problem that requires multiple engineering tools to solve; Existing tools lack interoperability, which requires tedious recreation and conversion of equipment models, and creates opportunities for errors in translation or through inconsistent assumptions; Microgrid modelers waste time reinventing the wheel because it is challenging to reuse existing distribution, load, generation, power flow, optimization models for new use cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

INECP Country Engagement Plans and Transformational Events [Slides]

The International Nonproliferation Export Control Program (INECP) harnesses the expertise of the U.S. Department of Energy (DOE) national laboratories to assist partners internationally in implementing and adopting strategic trade control measures that can effectively counter WMD procurement efforts. This presentation includes discussion of work with LANL INECP technical leads to update the engagement plan for Turkey, which involved researching Turkey’s WMD related legal framework, relevant export control agencies, and WMD-relevant industries (e.g. advanced manufacturing and aerospace).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Least-cost Optimal Distribution Grid Expansion (LODGE) v1

LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate new loads and behind-the-meter DERs in combination with advanced non-wire alternative (NWA) planning solutions, such as utility-owned storage and distributed PV. Working with a set of least-cost solutions per feeder/substation allows us to benchmark and compare techno-economic performance of different traditional and NWA planning solutions. An important aspect of the LODGE model is that it includes power flow operation constraints. This means that the least-cost planning solutions delivered by LODGE are technically feasible. Available projects in LODGE portfolio include: 1) feeder reconductoring; 2) transformers upgrades; 3) non-wire alternatives, such as strategic siting and sizing of storage and distributed PV; 4) voltage regulators.

Heleno, Miguel↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations for a Fundamental Nuclear Material Control (FNMC) Plan for TRISO Fuel Fabrication Facilities Under NRC Regulations

A fundamental nuclear material control (FNMC) plan, which is required for all fuel fabrication facilities that are authorized to possess more than 1 effective kg of special nuclear material, describes how material control and accounting (MC&A) requirements will be met to comply with US Nuclear Regulatory Commission (NRC) regulations. Tristructural isotropic (TRISO) fuel fabrication facilities are likely to have issues in meeting MC&A requirements because of the new processes and fuel types their work involves. This report provides recommendations for an FNMC plan specifically for a TRISO fuel fabrication facility under NRC regulations and includes a draft outline of an FNMC plan. This report was produced for the Materials Protection, Accounting, and Control Technologies (MPACT) program under the Nuclear Fuel Cycle Technologies programs within the US Department of Energy’s Office of Nuclear Energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ESGF project plan for ramping down development activities and transition the project and data to a new team

This document summarizes the current software development activities carried by the ESGF team with planned delivery dates before the transition of the project to a new team. The work we started on the publishing, search and retrieval, and the backend for indexing and data management that can be deployed using Kubernetes are planned to be delivered within the next three months; however, this assumes that the current team members will continue to work on the project. The activities are listed in Table 1 by priority and in case we lose team members, development of lower priority tasks can be paused and passed to the new team with its current status. Team members can be re-assigned based on their availability and transition work needed. Table 2 below describe activities necessary to help project transition to the new team. Deadlines for these activities are before October 1 st of 2022 or the completion of a successful transition. Support during the transition period assumes that we will have 3 key ESGF members and the ESGF PI supported at the 50% level or less for the duration of the transition. The level of support is an estimate, and it depends on several factors that cannot be decided at this time. The total cost of the proposed work and support activities for fiscal year 2021 is $1,270K with $230K carry over to fiscal year 2022. The cost for the support work listed in Table 2 is the sum of the two rows “HW support” and “project support, maintenance, and transition efforts”, colored blue, in Table1 which adds up to $720K. This cost is included in the $1,270K cost in table 1.

97 MATHEMATICS AND COMPUTING↗

McGrath, Alaska Community Energy Plan [Slides]

The US Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP) works alongside remote and island communities seeking to transform their energy systems and increase energy resilience. The City of McGrath took part in the ETIPP program in 2023-2024. As part of the project, community members formed the McGrath Energy Committee, made up of residents and local stakeholder organizations. The McGrath Energy Committee then worked with technical advisors from regional associations, university programs, and national labs to conduct a baseline energy assessment of the community, organize a community energy education series, identify key focus areas relevant to McGrath, explore funding opportunities, and create the McGrath Community Energy Plan. This plan serves as a foundational guide for future energy projects in the community, aligned with McGrath's long-term energy goal: "to be a catalyst to encourage energy resiliency in our community and the Upper Kuskokwim Region." - November 2024.

14 SOLAR ENERGY↗

Low Noise Frequency-Domain Multiplexing of TES Bolometers Using SQUIDs at Sub-Kelvin Temperature

Digital Frequency-Domain Multiplexing (DfMux) is a technique that uses MHz superconducting resonators and Superconducting Quantum Interference Device (SQUID) arrays to read out sets of transition edge sensors. DfMux has been used by several Cosmic Microwave Background experiments, including most recently POLARBEAR-2 and SPT-3 G with multiplexing factors as high as 68, and is the baseline readout technology for the planned satellite mission LiteBIRD. Here, we present recent work focused on improving DfMux readout noise, reducing parasitic impedance, and improving sensor operation. We have achieved a substantial reduction in stray impedance by integrating the sensors, resonators, and SQUID array onto a single-carrier board operated at 250 mK. This also drastically simplifies the packaging of the cryogenic components and leads to better-controlled crosstalk. We demonstrate a low readout noise level of 8.6 pA/Hz1 1/2 , which was made possible by operating the SQUID array at a reduced temperature and with a low dynamic impedance. This is a factor of two improvement compared to the achieved readout noise level in currently operating Cosmic Microwave Background experiments using DfMux and represents a critical step toward maturation of the technology for the next generation of instruments.

47 OTHER INSTRUMENTATION↗

Filaments in and between galaxy clusters at low and mid-frequency with the SKA

Context. Understanding the magnetised Universe is a major challenge in modern astrophysics, and cosmic magnetism has been acknowledged as one of the key scientific drivers of the most ambitious radio instrument ever planned, the Square Kilometre Array. Aims. With this work, we aim to investigate the potential of the Square Kilometre Array and its precursors and pathfinders in the study of magnetic fields in galaxy clusters and filaments through diffuse synchrotron radio emission. Galaxy clusters and filaments of the cosmic web are indeed unique laboratories in which to investigate turbulent fluid motions and large-scale magnetic fields in action, and much of what is known about magnetic fields in galaxy clusters comes from sensitive radio observations. Methods. Based on cosmological magneto-hydrodynamic simulations, we predict radio properties (total intensity and polarisation) of a pair of galaxy clusters connected by a cosmic-web filament. Results. We use our theoretical expectations to explore the potential of polarimetric observations to study large-scale structure magnetic fields in the frequency ranges 50–350 MHz and 950–1760 MHz. We also present predictions for galaxy cluster polarimetric observations with the Square Kilometre Array precursors and pathfinders, such as the LOw frequency ARray 2.0 and the MeerKAT+ telescope. Conclusions. Our findings point out that polarisation observations are particularly powerful for the study of large-scale magnetic fields, since they are not significantly affected by confusion noise. The unprecedented sensitivity and spatial resolution of the intermediatefrequency radio telescopes make them the favourite instruments for the study of these sources through polarimetric data, potentially allowing us to understand if the energy density of relativistic electrons is in equipartition with the magnetic field or rather coupled with the thermal gas density. Our results show that low-frequency instruments also represent a precious tool to study diffuse synchrotron emission in total intensity and polarisation.

79 ASTRONOMY AND ASTROPHYSICS↗

Development of Hydrogen Mitigation for the Nevada Solar One Power Plant

Acciona Solar Power and NREL agreed to a collaborative effort (CRADA) to develop and implement a method to reduce hydrogen levels in the circulating HTF at the NSO power plant. The project was planned as a three-year effort, and work started in June 2015. The CRADA's goal was to solve the long-standing lost efficiency problem caused by the buildup of hydrogen in the HTF, which significantly impacts the efficiency, electricity generation, and revenue from parabolic trough power plants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Report on the recovery of legacy 1997-1998 Depth-of-Burial / Tunnel-and-Hole-Closure explosion data from the Kazakhstan former Soviet nuclear test site, Semipalatinsk.

In 1996, negotiations between the National Nuclear Center of the Republic of Kazakhstan (NNC), the U.S. Defense Special Weapons Administration (DSWA) and the U.S. Department of Energy led to an agreement for a joint series of experiments at the former Soviet nuclear test site Semipalatinsk (STS). These experiments had a dual purpose: to close holes and tunnels originally created for the purpose of testing nuclear weapons, and to characterize explosive sources at a former nuclear test site. This report covers the recovery of legacy data from the experiments conduct in 1997 and 1998. Two teams collected data. Los Alamos National Laboratory (LANL), in collaboration with the NNC, collected the near-source (local) data out to approximately 20 km. Lamont-Doherty Earth Observatory (LDEO), with funding from Lawrence Livermore Laboratory (LLNL), also in collaboration with NNC, collected regional data, 200 – 1000 km distant, leveraging the KZ regional seismic network that LDEO had recently installed in collaboration with NNC. The two teams also worked together to some extent, regarding instrumentation and planning. This report primarily addresses the near-source data collected by the LANL/NNC team.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Acciona Power Plant Hydrogen Mitigation Project

In 2014, Acciona Solar Power and the National Renewable Energy Laboratory initiated discussions to identify a method to solve a long-standing efficiency loss problem at parabolic trough power plants. Parabolic trough power plants begin to show lost thermal efficiency after six years of operation, due to the presence of trace concentrations of hydrogen in the heat transfer fluid that circulates in the power plant. Trace levels of hydrogen infiltrate the collector field receivers, increasing their heat loss, and decreasing the power plants’ thermal efficiency. At the time, Acciona’s Nevada Solar One power plant in Boulder City, Nevada was starting to show this efficiency loss. After several discussions, APS and NREL agreed to a collaborative effort (CRADA) to develop and implement a method to reduce hydrogen levels in the circulating HTF at the NSO power plant. The project was planned as a three-year effort, and work started in June 2015. The CRADA’s goal was to solve the long-standing lost efficiency problem caused by the buildup of hydrogen in the HTF, which significantly impacts the efficiency, electricity generation, and revenue from parabolic trough power plants.

08 HYDROGEN↗

Lab Scale Mercury Dissolution Testing

Researchers at the Savannah River National Laboratory were requested by Savannah River Mission Completion to perform laboratory testing and modeling designed to understand why the Defense Waste Processing Facility (DWPF) is not collecting elemental mercury (Hg 0 ) despite long boiling times designed to recover Hg 0 . In response to a Technical Task Request, a Task Technical and Quality Assurance Plan was written and approved to authorize this work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reliability Barriers to Enhanced Solar PV Deployment: Selected Research Findings - State Outreach Technical Sessions

This presentation provides summaries of three reports selected from a body of work that examines potential reliability challenges related to planning future power systems with higher solar photovoltaic (PV) penetrations in the western United States. The three topics covered are 1) Power system flexibility requirements and supply; 2) Resource adequacy and the capacity credit of solar; 3) Simulating distributed energy resource responses to transmission system-level faults considering IEEE 1547 performance categories on three major WECC transmission paths. The full reports and related resources are available at the project website, https://www.westernenergyboard.org/western-interstate-energy-board/barrier-mitigation-to-enhanced-distributed-solar-photovoltaic/. This presentation is targeted toward a technical audience. A companion policy presentation provides higher-level summaries of the same material.

distributed energy resource↗

Reliability Barriers to Enhanced Solar PV Deployment: Selected Research Findings - State Outreach Policy Sessions

This presentation provides high-level summaries of three reports selected from a body of work that examines potential reliability challenges related to planning future power systems with higher solar photovoltaic (PV) penetrations in the western United States. The three topics covered are 1) Power system flexibility requirements and supply; 2) Resource adequacy and the capacity credit of solar; 3) Simulating distributed energy resource responses to transmission system-level faults considering IEEE 1547 performance categories on three major WECC transmission paths. The full reports and related resources are available at the project website, https://www.westernenergyboard.org/western-interstate-energy-board/barrier-mitigation-to-enhanced-distributed-solar-photovoltaic/. This presentation is targeted toward policy decision makers. A companion technical presentation provides more in-depth summaries of the same material.

distributed energy resource↗

Optimization Of In-field Alpha Spectrometry For Uranium Enrichment Determination In Uranium Hexafluoride

In response to needs identified by the International Atomic Energy Agency (IAEA) research is underway to develop In-Field Alpha Spectrometry (IFAS) as a method to allow IAEA safeguards inspectors to collect samples of uranium hexafluoride (UF6) at processing facilities to assess and verify uranium enrichment. For sample collection, the IFAS method uses Single-Use Destructive Assay (SUDA) samplers, which contain thin zeolite coatings that trap UF6 gas and convert it to the safer, more stable form uranyl fluoride (as a dihydrate, UO2F2·2H2O). For alpha spectrometry, the IFAS instrument employs a large area silicon semiconductor transducer to detect and record alpha particle energy-deposition events. Over the past year optimization work has significantly increased the diameter of useful SUDA samples (from 12.7 mm to 48 mm), improved the manufacturability and reproducibility of SUDA samples, increased the area of the IFAS alpha spectrometer sensor from 1.2 cm to 3.1 cm, and improved source positioning within the IFAS. This paper will report on this optimization work, its impacts on IFAS performance, and future plans for IFAS miniaturization, improvements, and testing.

Chichester, David↗