Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Thermal Energy Storage Selection for Near Term Nuclear Integration

Thermal energy storage (TES) integration with existing and future light water reactors (LWRs) has the capability to increase the deployment options and uses for the large amounts of heat produced in nuclear reactor cores. The present method of exclusively producing electricity has become less economical with increases in renewable energy penetration leading to times of low or negative electricity prices. Some response to this new grid reality has been to begin load following nuclear reactors, an unideal choice due to the relatively small modular cost of producing nuclear energy compared to the revenue that could be received by using all of the heat produced. To support research in this area, Idaho National Laboratory (INL) has joined with Utah Associated Municipal Power Systems (UAMPS) on the Carbon Free Power Project (CFPP) to contract the Joint Use Modular Plant (JUMP). CFPP is planned to be a 12-module NuScale operating site built on INL property, with the first module dedicated to JUMP for research, development, and demonstration purposes. The JUMP module coming online around the beginning of fiscal year 2027 in the current project timeline. One primary goal of JUMP is to demonstrate TES integrated with an operating LWR in a real-world environment. TES integration will allow for the demonstration of nuclear power’s capability to participate in grid load following without reactor cycling, process heat integration, and electrical ancillary market opportunities. The goal of this research is to support both SMR deployment opportunities as well as support LWR retrofit capabilities. In a discussion limited to load following or energy arbitration, “charging” and “discharging” can be simply defined. TES charging refers to time when energy is removed from the nuclear reactor power conversion cycle and directed to be stored in the TES storage medium resulting in less available energy available for grid output. Discharging refers to the process of releasing energy stored in the TES medium and having an increase in grid. This paper quantifies energy storage technologies for use with nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

Marquez, Jessica J.↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

Automating Surface Attitude Positioning and Pointing Operations for Mars 2020

The Surface Attitude Positioning and Pointing (SAPP) subsystem of the Mars Perseverance rover keeps track of the rover’s position and attitude on the surface of Mars. The SAPP Downlink Engineering Operations team members receive data from the rover on a daily basis. They must interpret the data to make sure the rover is staying safe and to support uplink planning. The SAPP team keeps track of the error growth in the rover’s attitude estimate due to noise in the Rover Inertial Measurement Unit’s (RIMU) gyroscopes used to propagate that attitude estimate whenever the rover is moving. Whenever this error grows to a particular threshold, SAPP is responsible for updating the onboard attitude knowledge using the RIMU’s accelerometers to estimate rover roll and pitch and sun imaging to estimate rover yaw, thereby reducing this attitude estimation error. Accurate attitude estimation is required so that the rover can successfully point its High Gain Antenna (HGA) to receive information from Earth and as a backup to the Mars orbiters used for sending data from the rover to Earth, point instruments on its Remote Sensing Mast (RSM), and support safe movement and placement of instruments by the rover’s ARM relative to the Martian surface. The Mars 2020 Engineering Operations team has been working to increase the operational efficiency of the mission and eventually move to a five-hour timeline for daily operations. In pursuit of this goal, the SAPP Engineering Operations team has automated their downlink process by developing a centralized Jupyter notebook to analyze the data received daily from the rover. The SAPP downlink Jupyter notebook automatically collects the data relevant to the SAPP subsystem and visualizes this information in plots and tables that can be easily read by downlink operators to aid them in assessing the status of the subsystem. Various Application Programming Interfaces (APIs) have been incorporated into the downlink daily notebook to automate the collection and posting of data, such as gathering and posting data products to the cloud. The SAPP team has also developed a SAPP downlink software library that includes functions to aid the notebook in processing data. In addition to assessing the SAPP subsystem on a daily basis, operators need to assess the long-term trending behavior of the subsystem over time. An automated trending process has been developed to collect information from the daily notebooks in order to plot and analyze that data in a centralized place. These daily and trending processes have expedited the SAPP downlink assessment and laid the groundwork to completely automate the SAPP downlink process so that SAPP operators are unnecessary unless something unexpected occurs. This paper will provide an overview of the functions that the SAPP subsystem carries out on a daily basis, and will then dive into the automations that have been developed for daily and trending downlink assessment. An assessment of the downlink efficiency will be provided, along with a summary of lessons learned and work to go. Finally, the authors will discuss how these types of automated spacecraft health assessments could be more broadly used within mission operations.

Zarifian, Anais↗

Environmental Concerns and Mitigation Associated with Geothermal Resource Confirmation Drilling Activities

In 2017-2018, the Bureau of Land Management's National Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities.

15 GEOTHERMAL ENERGY↗

Environmental Concerns and Mitigation Associated with Geothermal Resource Confirmation Drilling Activities

In 2017-2018, the Bureau of Land Management's National Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities.

15 GEOTHERMAL ENERGY↗

Capability Gaps Assessment and Identification of Critical Technology Elements for Mars Transit Habitat

The Habitation Systems Development Office (HP40) at NASA Marshall Space Flight Center supports systems engineering, integration, and project management for next generation space habitats. For in space operations and eventual transport of humans to Mars, NASA will rely on a Mars Transit Habitat (TH). The TH will be designed for an up to 1,200-day Mars mission and will carry all food and supplies needed to support four crew for this duration. In the current concept of operations, Mars TH transfers to near rectilinear halo orbit (NRHO) following launch and docks at Gateway as a visiting vehicle. While there, the TH will complete system shakedown testing and a series of analog missions which will grow from 3 to 6+ months in duration TH also augments Gateway’s habitation capabilities beyond 60-days. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. These shakedown missions will also be the first operational readiness tests of Mars TH’s long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Once shakedown missions are complete, Mars TH departs Gateway to aggregate with the Mars propulsion system in NRHO before onboarding the crew and final supplies in Earth orbit via a co-manifested Orion-logistics module. Orion and the LM return to Earth prior to the now aggregated Deep Space Transport vehicle’s journey to Mars. Development of the Mars TH requires significant technology development and maturation. Each year the agency performs a capability gaps assessment, where gaps developed by subject matter experts (SMEs) in various engineering/science disciplines are linked to architectural elements in formulation and prioritized. A gap captures the difference between the current state-of-the-art and the maturity of the capability that is needed to enable or enhance a mission as it is currently envisioned in the government reference architecture. HP40 conducted a gap analysis for Mars TH which will be summarized in this poster. Gaps classified as enabling (which means the mission cannot achieve success without gap closure) were subsequently used to identify critical technology elements (CTEs) for Mars TH. This identification of CTEs was also informed by an examination of the product breakdown structure for Mars TH and focused conversations with SMEs in specific technology areas. CTEs identified for Mars TH to date include the following (note this is not a comprehensive list – CTEs listed represent those in MSFC’s capability areas): inflatable softgoods for habitation; enhanced CO2 recovery; life support systems with greater levels of reliability and maintainability; autonomous guidance, navigation, command and control; and radiators for the Mars TH application. The habitation systems development team is currently delving deeper into each CTE to assess technology approaches being pursued, their maturity, and the degree of difficulty in maturation to meet projected Mars TH timelines. This poster will summarize work to date on the identification of enabling capability gaps linked to Mars TH and provide insight into the associated CTEs and technology maturation efforts.

technology development↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

[Evaluation of super dwarf wheat growth and development in greenhouse "Svet" during cultivation in inhabited pressurized chamber]

Goals of the 3-month experiment GREENHOUSE using the equipment of greenhouse SVET (ECO-PSY-95) were to feature growth and development of wheat through the entire cycle of ontogeny under the maximally mimicked MIR environment, and to try out the procedures and timeline of space experiment GREENHOUSE-2 as a part of the fundamental biology investigations within the MIR/NASA space science program. Irradiation intensity (PAR) was 65 W/m2 and 38 W/m2 in the experiment and laboratory control, respectively. Values of other environmental parameters were MIR average (18-25 degrees C, relative air humidity in the interval between 40% and 75%, total gas pressure of about 660 to 860 mm Hg, partial oxygen pressure within the range from 140 to 200 mm Hg, partial carbon dioxide pressure up to 7 mm Hg). Experimental results showed that wheat cultivation in inhabited chamber under a modified lighting unit providing greater irradiation of the crop area produced more plant mass although seed production dropped. Low grain content in ears could be the aftermath of the gaseous trace contaminants in the chamber atmosphere.

NASA Discipline Life Support Systems↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Basin-Scale Relicensing Opportunity Product User Guide

The Basin-Scale Relicensing Opportunity products provide a platform for identifying favorable areas for basin-wide collaboration using metrics derived from anticipated Federal Energy Regulatory Commission (FERC) relicensing dates. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. Two products were developed: (1) an interactive web map that allows users to browse facilities and rivers of interest and uncover locations for potential collaboration based on FERC relicensing metrics summarized along river reaches and (2) a spreadsheet that contains 1,261 facilities with associated FERC relicensing metrics and that allows users to join these data to others and develop and conduct their own analyses.

13 HYDRO ENERGY↗

Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 4: Operations analyses

Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required for satellite construction was updated to identify significant differences relevant to the solid state satellite concept. Means of decommissioning satellites at the end of their design life were studied.

Hanley, G. M.↗

Creating a Scenario Suitable for Multiple Caregivers

The HPS can be utilized for the training of a wide variety of caregivers, ranging from physicians to laypeople. Methods: A single scenario was developed and adapted for a number of clinical scenarios and operational environments, ranging from in-flight to the immediate postflight timeline. In this way, different caregivers, from astronauts to search and rescue forces to specialty-boarded physicians, could make use of a single clinical situation. Five crew medical officer analogs and sixty anesthesia residents, serving as flight surgeon analogs, and, were briefed on space medicine and physiology, then were exposed to the scenario and asked to manage the patient as if they were part of the in-flight or recovery team. Results: Basic themes, such as crisis resource management, were standard across the student audiences. Discussion: A single clinical script can easily be adapted for multiple uses.

Doerr, Harold↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities.

Stetson, Howard K.↗

Rapid Development of Instrument Thermal Models: Perspectives and Guidelines from NASA Goddard’s Instrument Design Laboratory

- The design and development of robotic spaceflight instruments is a critical part of NASA’s vision to discover and expand knowledge for the benefit of humanity - For typical flight instrument projects, thermal engineers will develop initial instrument thermal models over weeks or months, then iterate them over a project’s lifespan – In each iteration, the engineer will: - Refine their thermal models and thermal designs in accordance with updates from other subsystems - Perform trade studies - Solve very detailed and complex analysis problems, including worst-cases and contingencies - Pick hardware and plan for testing and integration - However, prior to a project being established, or for proposal development at an early conceptual stage, the luxury of multiple instrument design iterations may be limited or nonexistent – Within a short timeline, how do you complete a thermal model or explore multiple possible instrument configurations? – What are the critical parameters for your model? Which details do you include or leave out?

Kan Yang↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accomplishments and challenges of metrics for sustainable energy, population, and economics as illustrated through three countries

The global Sustainable Development Goals require meeting multiple objectives on energy, population, economics, and ecosystems. Development and economic growth as defined by current metrics requires energy inputs, yet energy growth can also increase negative impacts on natural systems. To achieve sustainable development goals, policymakers and technologists will need energy system solutions that consider not only cost and efficiency but also population, quality of life, natural ecosystems, and culture that accommodates different starting points and transition timelines of various countries. To explore possible approaches, this perspectives paper summarizes energy in the context of economic growth and population, illustrating concepts through the diverse status and direction of three countries--Japan, the United States, and Bangladesh--as potential views into a post-growth sustainable future. Four fundamental questions on long-term energy development are identified, related to optimal energy use per capita, sustainable global energy demand, managing an energy transition with stable population, and the need for generalizable approaches across countries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Leveraging the High Flux Isotope Reactor for nuclear fuel development: a review of experiments, facilities, and capabilities

Materials testing reactors (MTRs) have been used to develop in-core nuclear fuels and materials since the outset of the nuclear power industry. However, the closure of prominent MTRs worldwide and protracted construction timelines for new facilities have increased reliance on existing infrastructure for near-term irradiation testing needs. One facility that can support these needs is the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory. HFIR boasts the highest steady-state neutron flux in the Western Hemisphere and, among other roles, has been used to rapidly administer high fluences on fuels and materials for fission and fusion reactor applications. This paper reviews HFIR facilities and infrastructure, fuel-bearing irradiation experiments conducted in HFIR, and select nonfueled experiments that demonstrate advanced techniques transferable to fuels experiments. Collectively, these examples underscore HFIR's potential role as a nuclear fuels testbed supporting both the existing reactor fleet and advanced reactor fuel development.

Fuel qualification↗