Search NASA⌕ Search

SEARCH · Search NASA

Results for “fire test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Thermal Analysis of Propulsion Components for the Europa Clipper Mission

This presentation describes the thermal analysis and model development that occurred for selected components on the propulsion module subsystem of the Europa Clipper mission, which will fly to Jupiter's icy moon Europa and collect science data from orbit. An overview of a bipropellant system is given, as well as a description of a typical thermal propulsion design. A comparison is also provided, describing the unique Europa Clipper thermal design, which is atypical in many respects. The engine thermal model development is also discussed, including hot-firing tests with nozzle convection correlation, as well as thermal vacuum tests to measure and correlate the emissivity of critical nozzle surfaces. A description of engine firing, as well as valve soak back, is also provided, including temperature maps and results of engine cases. A summary is also provided, of lessons learned regarding thermal propulsion considerations.

propulsion module subsystem↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Space Launch System↗

Flight motor set 360L001 (STS-26R). (Reconstructed dynamic loads analysis)

A transient analysis was performed to correlate the predicted versus measured behavior of the Redesigned Solid Rocket Booster (RSRB) during Flight 360L001 (STS-26R) liftoff. Approximately 9 accelerometers, 152 strain gages, and 104 girth gages were bonded to the motors during this event. Prior to Flight 360L001, a finite element model of the RSRB was analyzed to predict the accelerations, strains, and displacements measured by this developmental flight instrumentation (DFI) within an order of magnitude. Subsequently, an analysis has been performed which uses actual Flight 360L001 liftoff loading conditions, and makes more precise predictions for the RSRB structural behavior. Essential information describing the analytical model, analytical techniques used, correlation of the predicted versus measured RSRB behavior, and conclusions, are presented. A detailed model of the RSRB was developed and correlated for use in analyzing the motor behavior during liftoff loading conditions. This finite element model, referred to as the RSRB global model, uses super-element techniques to model all components of the RSRB. The objective of the RSRB global model is to accurately predict deflections and gap openings in the field joints to an accuracy of approximately 0.001 inch. The model of the field joint component was correlated to Referee and Joint Environment Simulation (JES) tests. The accuracy of the assembled RSRB global model was validated by correlation to static-fire tests such DM-8, DM-9, QM-7, and QM-8. This validated RSRB global model was used to predict RSRB structural behavior and joint gap opening during Flight 360L001 liftoff. The results of a transient analysis of the RSRB global model with imposed liftoff loading conditions are presented. Rockwell used many gage measurements to reconstruct the load parameters which were imposed on the RSRB during the Flight 360L001 liftoff. Each load parameter, and its application, is described. Also presented are conclusions and recommendations based on the analysis of this load case and the resulting correlation between predicted and measured RSRB structural behavior.

Call, V. B.↗

Liquid Methane/Oxygen Injector Study for Mars Ascent Engines

As a part of the advancing technology of the cryogenic propulsion system for the Mars exploration mission, this effort aims at evaluating propellant injection concepts for liquid methane/liquid oxygen (LOX) rocket engines. Split-triplet and unlike impinging injectors were selected for this study. A total of four injector configurations were tested under combustion conditions in a modular combustor test article (MCTA), equipped with optically accessible windows, at MSFC. A series of forty hot-fire tests, which covered a wide range of engine operating conditions with the chamber pressure ranging from 320 to 510 and the mixture ratio from 1.5 to 3.5, were conducted. The test matrix also included a variation in the combustion chamber length for the purpose of investigating its effects on the combustion performance and stability. Initial assessments of the test results showed that the injectors provided stable combustion and there were no injector face overheating problems under all operating conditions. The Raman scattering signal measurement method was successfully demonstrated for the hydrocarbon/oxygen reactive flow field. The near-injector face flow field was visually observed through the use of an infrared camera. Chamber wall temperature, high frequency chamber pressure, and average throat section heat flux were also recorded throughout the test series. Assessments of the injector performance are underway.

Trinh, Huu Phuoc↗

Evaluation of Impinging Stream Vortex Chamber Concepts for Liquid Rocket Engine Applications

To pursue technology developments for future launch vehicles, NASA/Marshall Space Flight Center (MSFC) is examining vortex chamber concepts for liquid rocket engine applications. Past studies indicated that the vortex chamber schemes potentially have a number of advantages over conventional chamber methods. Due to the nature of the vortex flow, relatively cooler propellant streams tend to flow along the chamber wall. Hence, the thruster chamber can be operated without the need of any cooling techniques. This vortex flow also creates strong turbulence, which promotes the propellant mixing process. Consequently, the subject chamber concepts not only offer system simplicity, but also enhance the combustion performance. Test results have shown that chamber performance is markedly high even at a low chamber length-to-diameter ratio (LD). This incentive can be translated to a convenience in the thrust chamber packaging. Variations of the vortex chamber concepts have been introduced in the past few decades. These investigations include an ongoing work at Orbital Technologies Corporation (ORBITEC). By injecting the oxidizer tangentially at the chamber convergence and fuel axially at the chamber head end, Knuth et al. were able to keep the wall relatively cold. A recent investigation of the low L/D vortex chamber concept for gel propellants was conducted by Michaels. He used both triplet (two oxidizer orifices and one fuel orifice) and unlike impinging schemes to inject propellants tangentially along the chamber wall. Michaels called the subject injection scheme an Impinging Stream Vortex Chamber (ISVC). His preliminary tests showed that high performance, with an Isp efficiency of 9295, can be obtained. MSFC and the U. S. Army are jointly investigating an application of the ISVC concept for the cryogenic oxygen/hydrocarbon propellant system. This vortex chamber concept is currently tested with gel propellants at AMCOM at Redstone Arsenal, Alabama. A version of this concept for the liquid oxygen (LOX) hydrocarbon fuel (RP-1) system has been derived from the one for the gel propellant. An unlike impinging injector was employed to deliver the propellants to the chamber. MSFC is also conducting an alternative injection scheme, called the chasing injector, associated with this vortex chamber concept. In this injection technique, both propellant jets and their impingement point are in the same chamber cross-sectional plane. Long duration tests (approximately up to 15 seconds) will be conducted on the ISVC to study the thermal effects. This paper will report the progress of the subject efforts at NASA Marshall Space Flight Center. Thrust chamber performance and thermal wall compatibility will be evaluated. The chamber pressures, wall temperatures, and thrust will be measured as appropriate. The test data will be used to validate CFD models, which, in turn, will be used to design the optimum vortex chambers. Measurements in the previous tests showed that the chamber pressures vary significantly with radius. This is due to the existence of the vortices in the chamber flow field. Hence, the combustion efficiency may not be easily determined from chamber pressure. For this project, measured thrust data will be collected. The performance comparison will be in terms of specific impulse efficiencies. In addition to the thrust measurements, several pressure and temperature readings at various locations on the chamber head faceplate and the chamber wall will be made. The first injector and chamber were designed and fabricated based on the available data and experience gained during gel propellant system tests by the U.S. Army. The alternate injector for the ISVC was also fabricated. Hot-fire tests of the vortex chamber are about to start and are expected to complete in February of 2003 at the TS115 facility of MSFC.

Trinh, Huu P.↗

A Micro Newton Impulse-Bit Hydrazine Thruster - Design, Test, and Mission Applications

A small thruster, that will herein be called the Hydrazine milliNewton Thruster (HmNT), has been designed and vacuum hot-fire tested, demonstrating a range of thrust and impulse far below the current state-of-the-art (SOA) hydrazine thruster. Steady-state thrust levels of 35–135 mN, and minimum impulse-bits of 25–120 μN-s were demonstrated over a typical operating range of inlet pressures. These capabilities provide new spacecraft and mission design options, including the following: Functional backup for Reaction Wheel Assemblies (RWAs), which can be used to prolong the useful life of RWAs; RWA replacement for certain missions to save mass, power, and cost; Precision delta-V that can be used for: proximity operations and docking maneuvers, formation flying, primary attitude control for SmallSats and CubeSats, and primary delta-V for CubeSats.

Scharf, Daniel P.↗

Advanced Multi-Tube Mixer Combustion for 65% Efficiency (Final Report)

This project targeted advanced low NOx combustion for advanced gas turbines capable of 65%, or greater, efficiency in combined cycle application. This technology advancement has further potential to benefit gas turbines used in coal based IGCC applications with pre-combustion carbon capture and hydrogen as the resulting fuel. The program developed and synthesized the most advanced combustion system capable of achieving low NOX emissions up to turbine inlet temperatures of 3100F while also supporting the load-following needs of a modern grid. The combustion system contributes to the overall gas turbine efficiency goal by setting the maximum cycle temperature achievable for a given NOX level and by minimizing the through-combustor air flow pressure drop. Focus areas for this project targeted maximizing the turbine inlet temperature entitlement, as constrained by emissions considerations. The design also minimized parasitic air flow pressure drop by using advanced cooling techniques and performance materials selections and by minimizing hot surface area. These two technology objectives (maximum, emissions-compliant cycle temperature and minimum air flow pressure drop) were integrated into a prototype design. The primarily analytical project sought to identify the most promising technologies to meet these objectives. Additional critical “jugular” data were obtained from multi-tube mixer tests to realize the potential of leveraging “micro flames” for minimizing overall hot surface area. This data was used, in conjunction with an understanding of advanced material and cooling design technologies, to analytically develop multiple design concepts. Phase I focused on in-depth engineering analysis and design, with minimal supporting laboratory testing to enable a selection of the top three combustion architectures for achieving these overall objectives. Phase II of the program developed the selected design through a combination of sub-scale testing and analytical efforts. Early tests included a cold-flow cascade to establish aerodynamic performance characteristics and a sub-scale fired test at GE Global Research in Niskayuna, NY, to establish cooling and heat transfer characteristics in conjunction with combustion performance. The data from these tests validated the analytical models to ultimately design a full-scale, test article to evaluate at prototypical pressure and temperature conditions at GE Gas Power’s Gas Turbine Technology Laboratory in Greenville, SC. GE Gas Power also developed, tested, and recommended a suitable seal design to be applied to the unique features of the combustor. To assess the technology challenges from prospective future production of the combustor from a ceramic matrix composite material, screening tests of Environmental Barrier Coatings were completed.

20 FOSSIL-FUELED POWER PLANTS↗

Experimental and theoretical investigation of fatigue life in reusable rocket thrust chambers

During a test program to investigate low-cycle thermal fatigue, 13 rocket combustion chambers were fabricated and cyclically test fired to failure. Six oxygen-free, high-conductivity (OFHC) copper and seven Amzirc chambers were tested. The failures in the OFHC copper chambers were not typical fatigue failures but are described as creep rupture enhanced by ratcheting. The coolant channels bulged toward the chamber centerline, resulting in progressive thinning of the wall during each cycle. The failures in the Amzirc alloy chambers were caused by low-cycle thermal fatigue. The zirconium in this alloy was not evenly distributed in the chamber materials. The life that was achieved was nominally the same as would have been predicted from OFHC copper isothermal test data.

Hannum, N. P.↗

Experimental and theoretical investigation of fatigue life in reusable rocket thrust chambers

During a test program to investigate low-cycle thermal fatigue, 13 rocket combustion chambers were fabricated and cyclically test fired to failure. Six oxygen-free, high-conductivity (OFHC) copper and seven Amzirc chambers were tested. The chamber liners were fabricated of copper or copper alloy and contained milled coolant channels. The chambers were completed by means of an electroformed nickel closeout. The oxidant/fuel ratio for the liquid oxygen and gaseous hydrogen propellants was 6.0. The failures in the OFHC copper chambers were not typical fatigue failures but are described as creep rupture enhanced by ratcheting. The coolant channels bulged toward the chamber centerline, resulting in progressive thinning of the wall during each cycle. The failures in the Amzirc alloy chambers were caused by low-cycle thermal fatigue. The lives were much shorter than were predicted by an analytical structural analysis computer program used in conjunction with fatigue life data from isothermal test specimens, due to the uneven distribution of Zr in the chamber material.

Hannum, N. P.↗

High Pressure, Earth-storable Rocket Technology

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 Mpa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e. communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

High Pressure, Earth-storable Rocket Technology

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 MPa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e., communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

High Pressure, Earth-Storable Rocket Technology: Appendices C and D - Volume 3

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 MPa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e. communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

Space Launch System Base Heating Test: Environments and Base Flow Physics

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen-hydrogen rocket engines in the core-stage and two 5-segment solid rocket boosters and as a result six hot supersonic plumes interact within the aft section of the vehicle during flight. Due to the complex nature of rocket plume-induced flows within the launch vehicle base during ascent and a new vehicle configuration, sub-scale wind tunnel testing is required to reduce SLS base convective environment uncertainty and design risk levels. This hot-fire test program was conducted at the CUBRC Large Energy National Shock (LENS) II short-duration test facility to simulate flight from altitudes of 50 kft to 210 kft. The test program is a challenging and innovative effort that has not been attempted in 40+ years for a NASA vehicle. This paper discusses the various trends of base convective heat flux and pressure as a function of altitude at various locations within the core-stage and booster base regions of the two-percent SLS wind tunnel model. In-depth understanding of the base flow physics is presented using the test data, infrared high-speed imaging and theory. The normalized test design environments are compared to various NASA semi-empirical numerical models to determine exceedance and conservatism of the flight scaled test-derived base design environments. Brief discussion of thermal impact to the launch vehicle base components is also presented.

Mehta, Manish↗

NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

Environmental Impact Statement for the Space Shuttle Program

Test firings and launches will release air pollutants causing a temporary localized small degradation in air quality near the tests or launch site. Areas adjacent to the site will also be subjected to moderate sound levels of predominantly low frequencies for short durations. During the launch phase, hydrogen chloride will be introduced into the stratosphere causing a small decrease in ozone. Temporary perturbations to the ionosphere will occur during orbital maneuvers and entry will have no significant effect on communication or radio wave propagation. As the Orbiter descends, a low magnitude sonic beam will be produced along the groundtrack with maximum overpressures occurring near the landing site. The overpressures will be infrequent, will vary in location and are of sufficiently low energy to be considered a momentary annoyance, if noticed at all. Major alternatives considered are discontinuation or postponement of the program, use of alternate propellants and neutralization of the ground cloud.

Malkin, M. S.↗

On-board Optical Spectrometry for Detection of Mixture Ratio and Eroded Materials in Rocket Engine Exhaust Plume

Optical spectrometry can provide means to characterize rocket engine exhaust plume impurities due to eroded materials, as well as combustion mixture ratio without any interference with plume. Fiberoptic probes and cables were designed, fabricated and installed on Space Shuttle Main Engines (SSME), allowing monitoring of the plume spectra in real time with a Commercial of the Shelf (COTS) fiberoptic spectrometer, located in a test-stand control room. The probes and the cables survived the harsh engine environments for numerous hot-fire tests. When the plume was seeded with a nickel alloy powder, the spectrometer was able to successfully detect all the metallic and OH radical spectra from 300 to 800 nanometers.

Barkhoudarian, Sarkis↗

Building and Leading the Next Generation of Exploration Launch Vehicles

NASA s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicle. In 2009, the Ares Projects plan to: conduct the first flight test of Ares I, test-fire the Ares I first stage solid rocket motor; build the first integrated Ares I upper stage; continue testing hardware for the J-2X upper stage engine, and continue refining the design of the Ares V cargo launch vehicle. These efforts come with serious challenges for the project leadership team as it continues to foster a culture of ownership and accountability, operate with limited funding, and works to maintain effective internal and external communications under intense external scrutiny.

Cook, Stephen A.↗