Search NASA⌕ Search

SEARCH · Search NASA

Results for “fleet optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The Debate on Vehicle Triad: Examining the Utilization Patterns of Gasoline, Hybrid, and Electric Vehicles in Households

Light-duty vehicles contribute to approximately half of the transport sector's emissions, a sector challenging to decarbonize owing to the autocentric nature of many American cities. The U.S. Department of Transportation's blueprint outlines three key decarbonization strategies: increasing convenience, improving efficiency, and transitioning to zero-emission vehicles. Among these, the adoption of Electric Vehicles (EVs) offers a promising opportunity to reduce emissions from light-duty vehicles, which are predominantly gasoline-powered. Although substantial literature identifies and addresses factors influencing EV adoption, understanding their utilization within households who own vehicles with mixed fuel types is crucial for accurately assessing their environmental benefits. This paper addresses two key questions: (a) Are EVs utilized more, equally, or less than gasoline vehicles (GVs) and (b) What factors influence mileage utilization patterns in households with multiple vehicle fuel types, accounting for substitution and complementary effects? Analysis of 2022 National Household Travel Survey (NHTS) data indicates that EVs are utilized more than GVs within households that own multiple mixed fuel fleets. Findings reveal that households with a higher number of younger individuals and multiple workers use EVs more extensively, and those with older adults and larger households with multiple vehicles tend to use GVs more. Rural households have higher use of hybrid vehicles (HVs). The study identifies a substitution effect between EVs and GVs, while complementary relationship between HVs and EVs, suggesting nuances in vehicle utilization patterns. This nuanced understanding of vehicle utilization patterns informs the development of targeted policies and infrastructure investments to optimize household transportation efficiency.

ADVANCED PROPULSION SYSTEMS↗

Space Shuttle RTOS Bayesian Network

With shrinking budgets and the requirements to increase reliability and operational life of the existing orbiter fleet, NASA has proposed various upgrades for the Space Shuttle that are consistent with national space policy. The cockpit avionics upgrade (CAU), a high priority item, has been selected as the next major upgrade. The primary functions of cockpit avionics include flight control, guidance and navigation, communication, and orbiter landing support. Secondary functions include the provision of operational services for non-avionics systems such as data handling for the payloads and caution and warning alerts to the crew. Recently, a process to selection the optimal commercial-off-the-shelf (COTS) real-time operating system (RTOS) for the CAU was conducted by United Space Alliance (USA) Corporation, which is a joint venture between Boeing and Lockheed Martin, the prime contractor for space shuttle operations. In order to independently assess the RTOS selection, NASA has used the Bayesian network-based scoring methodology described in this paper. Our two-stage methodology addresses the issue of RTOS acceptability by incorporating functional, performance and non-functional software measures related to reliability, interoperability, certifiability, efficiency, correctness, business, legal, product history, cost and life cycle. The first stage of the methodology involves obtaining scores for the various measures using a Bayesian network. The Bayesian network incorporates the causal relationships between the various and often competing measures of interest while also assisting the inherently complex decision analysis process with its ability to reason under uncertainty. The structure and selection of prior probabilities for the network is extracted from experts in the field of real-time operating systems. Scores for the various measures are computed using Bayesian probability. In the second stage, multi-criteria trade-off analyses are performed between the scores. Using a prioritization of measures from the decision-maker, trade-offs between the scores are used to rank order the available set of RTOS candidates.

Morris, A. Terry↗

Co-Optimization of Fuels & Engines: FY17 Year in Review

Researchers from national laboratories and universities across the United States are putting their combined scientific might behind the Co-Optima initiative to bring better fuels and better vehicles to market sooner. Our team members are exploring synergies across a range of fuel, engine, and powertrain options, with a focus on opportunities to increase fuel diversification and provide greater flexibility for refiners and fuel producers. We have adopted a composition-agnostic approach to identify new blendstocks that can be combined with conventional petroleum-based fuels to deliver significantly improved performance in advanced internal combustion engines. In fiscal year 2017 (FY17), our research expanded to encompass solutions for the entire on-road fleet, from light-duty passenger cars to heavy-duty freight trucks. This report spotlights some of FY17's most significant Co-Optima accomplishments.

33 ADVANCED PROPULSION SYSTEMS↗

Real time operation of high-capacity electric vehicle ridesharing fleets

We study the feasibility of using electric vehicles in online, high-capacity ridepooling systems. Prior work has shown that online algorithms perform well for centrally-controlled, high-capacity ridepool systems. First, we propose a mixed integer linear program to expand past algorithms on ridepooling to electric vehicle fleets with the objective of scheduling vehicle charging to maintain sufficient fleet sizes at various times of day. Then we show a faster, scalable algorithm with similar performance that is practical for full-scale systems. Furthermore, our contributions reinforce the importance of having knowledge and estimates of future demand even when operating in the online setting.

33 ADVANCED PROPULSION SYSTEMS↗

Method and application of data integration at a nuclear power plant. Light Water Reactor Sustainability Program report

The data of a nuclear power plant (NPP) is stored in silos for the various plant tools. A previous study conducted by the LWRS program identified the different data sources that can benefit online monitoring in an NPP. These data have different structures and tools and are therefore used independently. Integrating data from various sources can result in multiple benefits to online monitoring by enhancing the ability to compare data, reduce statistical uncertainty due to a larger data set, increase data heterogeneity in space and time to reveal confounded information, develop intelligent methods, and share data. Data integration can result in direct cost saving by reducing the amount of effort needed to find needed information. It can also enable establishing a data warehouse, the backbone repository of data for an NPP, and is necessary to evolve NPPs to a holistic online monitoring approach and automate labor-intensive activities. Whether within an NPP or for a fleet of NPPs, deploying a data warehouse in a plant or data broker for a fleet of plants requires overcoming multiple challenges, including the lack of a standard form of storing and using data and the lack of integration methods to compare and map the different data sources. This effort demonstrates two methods and applications for data integration through an application integration pilot and a data fusion pilot. The application integration is targeted towards the software interfacing of data and data management. This approach is commonly used by data integrators. The data fusion pilot is targeted towards intelligently mapping or coupling data for optimized data use. The pilots were performed in collaboration with two NPPs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Digital Transformation for the Existing Fleet: Where to Start?

To remain economically viable in today’s electricity marketplace, nuclear power plants are replacing old analog equipment with modern digital tools. Having information available in an electronic format allows most work processes to become more efficient by automating simple, time-consuming tasks. However, with thousands of routine work processes performed every day, it can be difficult for the plants to know where to begin. We partnered with a nuclear utility to develop a novel assessment tool that measures seven health indicators for each work process performed, providing a rapid digital status report of the plant. The assessment tool is inexpensive and user-friendly, administered remotely, and automatically customized to each employee. Data from 167 employees representing different perspectives were analyzed to identify optimal candidates for digital initiatives that yield the highest payback for increased process efficiencies. We ranked by a priority index to ensure that processes with a good combination of time savings and digital opportunity were at the top. The focus was on determining a maximum investment to ensure that the cost savings from these initiatives are positive over a specified period. We identified potential cost savings of $2.6m, $1.3m and $1.2m for our top priority processes. By using our novel assessment tool to determine the digital status of the plant’s work processes, they were provided with a starting point for target candidates that would most benefit from a digital initiative. Our analysis helps stakeholders understand the financial impact of digital initiatives and identify maximum investment amounts when seeking technical solutions.

assessment↗

Gas Turbine Heavy Hybrid Powertrain Variants. Opportunities and Potential for Systems Optimization

Widespread use of alternative hybrid powertrains is currently inevitable, and many opportunities for substantial progress remain. Hybrid electric vehicles (HEVs) have attracted considerable attention due to their potential to reduce petroleum consumption and greenhouse gas emissions in the transportation sector. This capability is mainly attributed to (a) the potential for downsizing the engine, (b) the potential for recovering energy during braking and thus recharging the energy storage unit, and (c) the ability to minimize the operation of the engine outside of its most efficient brake specific fuel consumption (BSFC) regime. Hybridization of the Class 8, heavy-duty (HD) powertrain is inherently challenging due to the expected long-haul driving requirements and limited opportunities for regenerative braking. The objective of this project is to develop control strategies aiming at optimizing the operation of a Class 8 HEV that features a micro-turbine as the heat engine. The micro-turbine application shows promise in fuel efficiency, even when compared to current diesel engines, and can meet regulated exhaust emissions levels with no exhaust after-treatment system. Both parallel and series HEV variants will be examined to understand the merits of each approach of the micro-turbine to MD advanced powertrain applications. These powertrain configurations enable new paradigms in operational efficiency, particularly in the Class 8 truck fleet. The successful development of these HEV variants will require a thorough technical understanding of the complex interactions between various energy sources and energy consumption components, for various operating modes. PACCAR will be integrating the first generation of their series HEV powertrain with a Brayton Energy micro-turbine into a Class 8 HD truck tractor that has both regional haul and local pick-up and delivery (P&D) components to its drive cycle. The vehicle will be deployed into fleet operation for a demonstration period of six (6) months to assess real world operating benefits of the advanced powertrain. A parallel variant of the micro-turbine powertrain will be built and sent to the ORNL Vehicle Systems Integration Laboratory.

33 ADVANCED PROPULSION SYSTEMS↗

A human automation interaction concept for a small modular reactor control room - 101

Many advanced nuclear power plant (NPP) designs incorporate higher degrees of automation than the existing fleet of NPPs. Automation is being introduced or proposed in NPPs through a wide variety of systems and technologies, such as advanced displays, computer-based procedures, advanced alarm systems, and computerized operator support systems. Research consistently finds that there is a fundamental tradeoff between system performance with increased automation and reduced human performance. Idaho National Laboratory (INL) researchers and NuScale Power human factors and operations staff are working on a collaborative project to address the human performance challenges of increased automation and to determine the principles that lead to optimal performance in highly automated systems. This paper will describe this concept in detail and will describe an experimental test of the concept. The benefits and challenges of the approach will be discussed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Grid-Integrated Production of Fischer-Tropsch Synfuels from Nuclear Power

Idaho National Laboratory (INL) investigates the relative economic profitability of an integrated energy system (IES) coupling an NPP with a synfuel production process at selected case study locations across the United States. In the synfuel IES, a high-temperature steam electrolysis (HTSE) plant is thermally and electrically coupled with an NPP to produce zero-carbon hydrogen. The synthetic fuel is produced from this H 2 combined with a CO 2 supply using the reverse water gas shift process followed by the Fischer-Tropsch (FT) reaction. This analysis considers a system in which the CO 2 is sourced from regional CO 2 emitters via the construction and operation of pipeline-based CO 2 supply networks. Locating the FT plant at the same site as the NPP and HTSE plants enables the NPP to provide zero-carbon heat and power to the HTSE plant and zero-carbon power to the FT plant as well as avoid the requirement for long-distance H 2 product transport from the HTSE plant to the FT plant. Hydrogen storage is used to enable the NPP to dispatch power to the electrical grid (instead of the HTSE plant) when grid demand increases, thus enabling the FT plant to continue to operate in a steady-state production mode. The ability to cease hydrogen production for several hours within each day enables the NPP to provide power to the grid to balance the electricity market during peak periods and maximize revenues for the nuclear synfuel IES. The FT process design considered has a 99% carbon conversion efficiency. The use of nuclear energy and nuclear energy-derived hydrogen enables synfuel production to achieve this high level of carbon utilization. Additionally, the life-cycle carbon emissions of the nuclear-based synfuel production process are very low, with WTW emissions of approximately 25 gCO 2 e/MJ, including steam credits (generated from FT process excess heat), and approximately 7 gCO 2 e/MJ, if steam credits are excluded. This compares favorably with the WTW emissions of 90.5 gCO 2 e/MJ for a compression-ignition, direct injection (CIDI) vehicle with a fuel economy of 31.6 miles per gallon gasoline equivalent (MPGGE), using low-sulfur diesel produced using conventional petroleum production and refining processes. Several NPPs in various regions of the U.S. are considered as case study analyses. Supply locations and transportation via pipeline of the CO 2 feedstock to the NPP site are analyzed through the National Energy Technology Laboratory (NETL) CO 2 Transport Cost model. The team finds that the amount of CO 2 generated by different sectors is sufficient for the synfuel production process at all locations considered. The CO 2 transportation costs are functions of the distance of the source to the NPP location, the CO 2 capture cost at the source, and the quantity of CO 2 transported. Historical electricity prices for the NPP case study locations are collected and analyzed. Monthly average prices, price range, and duration of negative-price periods vary among these locations. For each location, an auto-regressive moving average (ARMA) model is trained on historical electricity price data. ARMA validation is done to ensure the synthetic price distributions represent one of historical prices with high fidelity. Synthetic time series from these ARMA models are used in a coupled dispatch and system optimization in the Holistic Energy Resource Optimization Network (HERON) to compute the differential net present value (NPV) of the IES. The team finds that this econometric is positive, ranging from $14M–1.3bn (2020) depending on the location. The optimal synfuel IES configuration to obtain this increase in NPV often maximizes the size of the synfuel production process with regards to the size of the NPP. However, the team shows that the NPP still plays a stabilizing role for the grid: In periods of high prices and high loads, more electricity from the NPP is sent to the grid. A high variability of electricity prices and extreme maximum prices tend to drive up electricity production. While it requires significant investment, the synfuel IES could increase the economic profitability for the existing fleet of LWRs across the country while still maintaining the grid stabilizer role of NPPs. During its lifetime, the main costs for the nuclear synfuel IES are the carbon feedstock transportation costs, followed by the capital expenses (CAPEX) and operation and maintenance (O&M) costs while the revenue comes first from the IRA H 2 production tax credit (PTC) and then from the sales of synfuel products. The profitability of the synfuel IES is most sensitive to the value of the hydrogen PTC and the synfuel products as well as the cost of the carbon feedstock, highlighting the importance of governmental incentives regarding hydrogen, carbon emissions, and synfuel in driving the deployment of future nuclear synfuel IESs.

08 HYDROGEN↗

NREL/Industry Range-Extended Electric Vehicle for Package Delivery

Range-extended electric vehicle (EV) technology can be a viable option for reducing fuel consumption from medium-duty (MD) and heavy-duty (HD) engines by approximately 50 percent or more. Such engines have wide variations in use and duty cycles, however, and identifying the vocations/duty cycles most suitable for range-extended applications is vital for maximizing the potential benefits. This presentation provides information about NREL's research on range-extended EV technologies, with a focus on NREL's real-world data collection and analysis approach to identifying the vocations/duty cycles best suited for range-extender applications and to help guide related powertrain optimization and design requirements. The presentation also details NREL's drive cycle development process as it pertains to package delivery applications.

25 ENERGY STORAGE↗

Simulation Model of Mobile Detection Systems

In this paper, we consider a mobile source that we attempt to detect with man-portable, vehicle-mounted or boat-mounted radiation detectors. The source is assumed to transit an area populated with these mobile detectors, and the objective is to detect the source before it reaches a perimeter. We describe a simulation model developed to estimate the probability that one of the mobile detectors will come in to close proximity of the moving source and detect it. We illustrate with a maritime simulation example. Our simulation takes place in a 10 km by 5 km rectangular bay patrolled by boats equipped with 2-inch x 4-inch x 16-inch NaI detectors. Boats to be inspected enter the bay and randomly proceed to one of seven harbors on the shore. A source-bearing boat enters the mouth of the bay and proceeds to a pier on the opposite side. We wish to determine the probability that the source is detected and its range from target when detected. Patrol boats select the nearest in-bound boat for inspection and initiate an intercept course. Once within an operational range for the detection system, a detection algorithm is started. If the patrol boat confirms the source is not present, it selects the next nearest boat for inspection. Each run of the simulation ends either when a patrol successfully detects a source or when the source reaches its target. Several statistical detection algorithms have been implemented in the simulation model. First, a simple k-sigma algorithm, which alarms with the counts in a time window exceeds the mean background plus k times the standard deviation of background, is available to the user. The time window used is optimized with respect to the signal-to-background ratio for that range and relative speed. Second, a sequential probability ratio test [Wald 1947] is available, and configured in this simulation with a target false positive probability of 0.001 and false negative probability of 0.1. This test is utilized when the mobile detector maintains a constant range to the vessel being inspected. Finally, a variation of the sequential probability ratio test that is more appropriate when source and detector are not at constant range is available [Nelson 2005]. Each patrol boat in the fleet can be assigned a particular zone of the bay, or all boats can be assigned to monitor the entire bay. Boats assigned to a zone will only intercept and inspect other boats when they enter their zone. In our example simulation, each of two patrol boats operate in a 5 km by 5 km zone. Other parameters for this example include: (1) Detection range - 15 m range maintained between patrol boat and inspected boat; (2) Inbound boat arrival rate - Poisson process with mean arrival rate of 30 boats per hour; (3) Speed of boats to be inspected - Random between 4.5 and 9 knots; (4) Patrol boat speed - 10 knots; (5) Number of detectors per patrol boat - 4-2-inch x 4-inch x 16-inch NaI detectors; (6) Background radiation - 40 counts/sec per detector; and (7) Detector response due to radiation source at 1 meter - 1,589 counts/sec per detector. Simulation results indicate that two patrol boats are able to detect the source 81% of the time without zones and 90% of the time with zones. The average distances between the source and target at the end of the simulation is 5,866 km and 5,712 km for non-zoned and zoned patrols, respectively. Of those that did not reach the target, the average distance to the target is 7,305 km and 6,441 km respectively. Note that a design trade-off exists. While zoned patrols provide a higher probability of detection, the nonzoned patrols tend to detect the source farther from its target. Figure 1 displays the location of the source at the end of 1,000 simulations for the 5 x 10 km bay simulation. The simulation model and analysis described here can be used to determine the number of mobile detectors one would need to deploy in order to have a have reasonable chance of detecting a source in transit. By fixing the source speed to zero, the same model could be used to estimate how long it would take to detect a stationary source. For example, the model could predict how long it would take plant staff performing assigned duties carrying dosimeters to discover a contaminated spot in the facility.

61 RADIATION PROTECTION AND DOSIMETRY↗

Background and programmatic approach for the development of orbital fluid resupply tankers

Onorbit resupply of fluids will be essential to the evolving generation of large and long-life orbital stations and satellites. These types of services are also needed to improve the economics of space operations, and not only optimize the expenditures for government funded programs, but also pave the way for commercial development of space resources. To meet these requirements, a family of tankers must be developed to resupply a variety of fluids. Economics of flight hardware development will require that each tanker within this family be capable of satisfying a variety of functions, including not only fluid resupply from the Space Shuttle Orbiter, but also resupply from Space Station and the orbital maneuvering vehicle (OMV). This paper discusses the justification, the programmatic objectives, and the advanced planning within NASA for the development of this fleet of multifunction orbital fluid resupply tankers.

Griffin, J. W.↗

Dynamic Simulation of a Sub-Critical Coal Fired Power Plant

In order to address the demanding operating conditions for remaining coal-fired power plants, a dynamic model and a suite of tools have been developed for studying load cycling and to find optimization opportunities. A sub-critical steam cycle power plant was modeled in a flow-sheet modeling tool, APROS™. The model represented the firing system, economizer, evaporator, superheat, and reheat systems. Four loads from 100% TMCR to 25% TMCR were calibrated and tested such that low-to-high cycling could be studied. The model was run through various load cycles; one of which is presented here. This modeling is a prototype for general use in developing cutting edge controls products and for maximizing economic, low-emissions, and efficient operation of the existing coal power fleet.

Braun, Timothy↗

Westinghouse advanced fuel management strategies leveraging high enrichment and high burnup fuel to optimize PWR economics

In the US, nuclear power plants have been focused on increasing electricity generation for over three decades via longer operating cycles, reduced number of outages and duration, and the implementation of power up-rates. The potential for zero-carbon emission credits and other carbon-reduction initiatives further makes nuclear power utilities to focus on increasing generation capability. Longer operating cycles provide increased energy generation and enable economic savings to nuclear utilities when the increase in fuel loading required to achieve the extended cycle energy target and resulting increase in total fuel cost is offset by the savings from outage avoidance and reduced replacement power costs. For the current licensed limits of 5 w/o {sup 235}U enrichment and 62 GWd/tU peak pin burnup, higher power density PWR plants, which are prevalent in the PWR fleet, require an excessively penalizing fraction of feed fuel assemblies to operate for the extended cycle duration, with inevitably poor fuel use and fuel cycle economics that cannot be counterbalanced by the savings on outage cost avoidance. To overcome this barrier, the nuclear industry is pursuing development of high enrichment/high burnup fuel technology ({sup 235}U enrichment up to 8 w/o and peak pin burnup up to 75 GWd/tU) which increases fuel energy generation capability and can enable high power density plants to achieve positive economics on 24-month cycle of operation. This paper presents advanced fuel management strategies developed by Westinghouse to enable transition of PWR reactors from 18-month to 24-month cycle of operation, with and without a core thermal power uprate, which are then used as basis to assess the economics of a direct transition from 18 to 24-month cycles with high enrichment/high burnup fuel. The results show that these fuel management strategies, especially if coupled with thermal power up-rates, present the opportunity for substantial economic benefits to utilities. The systematic review of fuel management strategies presented can provide an illustrative reference for decision makers as they consider how to maximize nuclear energy generation economically. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enabling a Physical Twin for Control Methods Evaluation

Advanced nuclear reactors play an important role in the energy future of the United States and the rest of the world. They are designed and operated based on a different model than that of the current operating fleet, thus enabling deployment in remote locations and allowing for safe semi-autonomous or autonomous operations. Such characteristics require the development of a new reactor control paradigm. A significant factor in the development of control technologies and methods is integration of the various technologies and methods with each other and with hardware (both reactor system hardware and control hardware). A recent workshop on control of advanced reactors identified the lack of a flexible, expandable software/hardware infrastructure to enable such integration as a key gap. A previous phase of the current effort involved developing and demonstrating the Control and Optimization Modular Modeling Application for Nuclear Deployment (COMMAND) platform, which is capable of integrating autonomous-control-enabling technologies and methods, without the constraints imposed by existing software solutions. This platform will enable advanced reactor developers to deploy and test any developed technologies and methods by employing a common framework, and to couple them with their own models and hardware. The present phase of this effort entails using the Microreactor Automated Control System (MACS) platform, which was developed by the U.S. Department of Energy (DOE) Microreactor Program, to serve as a control method testbed. MACS can be used by advanced reactor developers to integrate their control related research activities with any reactor system. For the present effort, MACS was customized to mirror Idaho National Laboratory (INL)’s Microreactor Applications Research Validation and Evaluation (MARVEL) microreactor, and COMMAND was leveraged to enable MACS to emulate the physics of MARVEL, thus positioning MACS as a physical twin of MARVEL.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Critical Infrastructure for Ocean Research and Societal Needs in 2030

The United States has jurisdiction over 3.4 million square miles of ocean expanse greater than the land area of all fifty states combined. This vast marine area offers researchers opportunities to investigate the ocean's role in an integrated Earth system, but also presents challenges to society, including damaging tsunamis and hurricanes, industrial accidents, and outbreaks of waterborne diseases. The 2010 Gulf of Mexico Deepwater Horizon oil spill and 2011 Japanese earthquake and tsunami are vivid reminders that a broad range of infrastructure is needed to advance our still-incomplete understanding of the ocean. The National Research Council (NRC)'s Ocean Studies Board was asked by the National Science and Technology Council's Subcommittee on Ocean Science and Technology, comprised of 25 U.S. government agencies, to examine infrastructure needs for ocean research in the year 2030. This request reflects concern, among a myriad of marine issues, over the present state of aging and obsolete infrastructure, insufficient capacity, growing technological gaps, and declining national leadership in marine technological development; issues brought to the nation's attention in 2004 by the U.S. Commission on Ocean Policy. A 15-member committee of experts identified four themes that encompass 32 future ocean research questions enabling stewardship of the environment, protecting life and property, promoting economic vitality, and increasing fundamental scientific understanding. Many of the questions in the report (e.g., sea level rise, sustainable fisheries, the global water cycle) reflect challenging, multidisciplinary science questions that are clearly relevant today, and are likely to take decades of effort to solve. As such, U.S. ocean research will require a growing suite of ocean infrastructure for a range of activities, such as high quality, sustained time series observations or autonomous monitoring at a broad range of spatial and temporal scales. Consequently, a coordinated national plan for making future strategic investments becomes an imperative to address societal needs. Such a plan should be based upon known priorities and should be reviewed every 5-10 years to optimize the federal investment. The committee examined the past 20 years of technological advances and ocean infrastructure investments (such as the rise in use of self-propelled, uncrewed, underwater autonomous vehicles), assessed infrastructure that would be required to address future ocean research questions, and characterized ocean infrastructure trends for 2030. One conclusion was that ships will continue to be essential, especially because they provide a platform for enabling other infrastructure autonomous and remotely operated vehicles; samplers and sensors; moorings and cabled systems; and perhaps most importantly, the human assets of scientists, technical staff, and students. A comprehensive, long-term research fleet plan should be implemented in order to retain access to the sea. The current report also calls for continuing U.S. capability to access fully and partially ice-covered seas; supporting innovation, particularly the development of biogeochemical sensors; enhancing computing and modeling capacity and capability; establishing broadly accessible data management facilities; and increasing interdisciplinary education and promoting a technically-skilled workforce. The committee also provided a framework for prioritizing future investment in ocean infrastructure. They recommend that development, maintenance, or replacement of ocean research infrastructure assets should be prioritized in terms of societal benefit, with particular consideration given to usefulness for addressing important science questions; affordability, efficiency, and longevity; and ability to contribute to other missions or applications. These criteria are the foundation for prioritizing ocean research infrastructure investments by estimating the economic costs and benefits of each potential infrastructure investment, and funding those investments that collectively produce the largest expected net benefit over time. While this type of process is clearly subject to budget constraints, it could quantify the often informal evaluation of linkages between infrastructure, ocean research, the value of information produced, societal objectives, and economic benefits. Addressing the numerous complex science questions facing the entire ocean research enterprise in 2030 from government to academia, industry to nonprofits, local to global scale represents a major challenge, requiring collaboration across the breadth of the ocean sciences community and nearly seamless coordination between ocean-related federal agencies.

47 OTHER INSTRUMENTATION↗

State Models to Incentivize and Streamline Small Hydropower Development

In 2016, the hydropower fleet in the United States produced more than 6 percent (approximately 265,829 gigawatt-hours [GWh]) of the total net electricity generation. The median-size hydroelectric facility in the United States is 1.6 MW and 75 percent of total facilities have a nameplate capacity of 10 MW or less. Moreover, the U.S. Department of Energy's Hydropower Vision study identified approximately 79 GW hydroelectric potential beyond what is already developed. Much of the potential identified is at low-impact new stream-reaches, existing conduits, and non-powered dams with a median project size of 10 MW or less. To optimize the potential and value of small hydropower development, state governments are crafting policies that provide financial assistance and expedite state and federal review processes for small hydroelectric projects. This report analyzes state-led initiatives and programs that incentivize and streamline small hydroelectric development.

13 HYDRO ENERGY↗

Demand Driven Cycamore Archetypes

Future nuclear fuel cycle options may present advantages over today’s once-through fuel cycle. Nuclear fuel cycle simulation tools assess the performance of those fuel cycles as well as the dynamics of long-term technology transitions. In many nuclear fuel cycle simulation tools, it has historically been the responsibility of the user to manually define facility deployment schemes and all facility parameters. While this is straightforward in simple fuel cycles, transitions from one fuel cycle to another can be more complex. In particular, deployment schemes for supportive fuel cycle facilities beyond the reactor become complex if the analyst desires to avoid gaps in the nuclear fuel and power supply chain during those transition scenarios. As nuclear fuel cycle analysis approaches questions regarding the feasibility and performance of the deployment schemes and technology choices during technology transition, automation of this historically manual process is necessary. The main objective of this work was to develop and demonstrate Cyclus automation capabilities toward key nuclear fuel cycle transition scenarios. While deploying reactors to meet power demand is trivial, and existed in the earliest versions of CYCLUS, automated, predictive deployment and decommissioning of other facilities is more complex. These include mining, milling, enrichment, fuel fabrication, reprocessing, and others. For example, a balanced closed fuel cycle may require ensuring that there is enough fast reactor fuel for their operation and may drive deployment of a fleet of light water reactors. This concern comprises the main challenge that drove the project effort. The Demand-Driven Cycamore Archetype project (NEUP-FY16-10512) aimed to develop CYCAMORE demand-driven deployment capabilities and thereby automate transition scenario definition. The developed software package, d3ploy, in the form of a CYCLUS Institution agent, deploys Facilities to meet the front-end and back-end demands of the fuel cycle. The University of South Carolina and the University of Illinois applied multiple algorithmic approaches to this challenge. This project developed an in situ demand-driven development schedule calculation through non-optimizing, deterministic-optimizing, and stochastic-optimizing algorithms as CYCLUS archetypes and demonstrated these new archetypes in program-supporting fuel cycle transition scenarios. Both objectives were achieved. This report documents the results and deliverables obtained toward these achievements in detail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗