Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Weakly Supervised Event Classification Using Imperfect Real-world PMU Data with Scarce Labels

This paper studies event classification using imperfect real-world phasor measurement unit (PMU) data with scarce event types (labels). By investigating the real-world PMU data, it is observed that most real-world PMU data's event type is unknown, which makes it challenging to directly use such dataset to build event classifiers as existing classification techniques require high-quality training data with known event type (i.e., label). To address this challenge, a weakly supervised learning based event classification approach is developed, which can use noisy and low-quality PMU data for the training. First, data quality issues are fixed using data preprocessing techniques and then event features are constructed from the PMU data. Using these features, a series of labeling functions are learnt to generate initial estimates of the labels of large amounts of unlabeled PMU data. As the labeling functions are learnt using the same data with scarce labels, the label estimates from the labeling functions can be correlated, noisy, and bias. To enhance these initial estimates, a generative model is developed to characterize the dependencies among the estimated labels, based on which better labels are obtained for training event classifiers. Numerical experiments using the real-world dataset from the Western Interconnection of the U.S. power transmission grid show that the proposed weakly supervised event classifier trained using the dataset with only 5% labeled data can achieve 78.4% classification accuracy.

Liu, Yunchuan↗

Power System Event Identification Based on Deep Neural Network With Information Loading

Online power system event identification and classification are crucial to enhancing the reliability of transmission systems. In this study, we develop a deep neural network (DNN) based approach to identify and classify power system events by leveraging real-world measurements from hundreds of phasor measurement units (PMUs) and labels from thousands of events. Two innovative designs are embedded into the baseline model built on convolutional neural networks (CNNs) to improve the event classification accuracy. First, we propose a graph signal processing based PMU sorting algorithm to improve the learning efficiency of CNNs. Second, we deploy information loading based regularization to strike the right balance between memorization and generalization for the DNN. Numerical results based on real-world dataset from the Eastern Interconnection of the U.S power transmission grid show that the combination of PMU based sorting and the information loading based regularization techniques help the proposed DNN approach achieve highly accurate event identification and classification results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

To'Hajiilee Economic Development, Inc. (TEDI) Feasibility Study for Utility-Scale Solar

To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

14 SOLAR ENERGY↗

Geomagnetic Storms and Long-Term Impacts on Power Systems

Pacific Northwest National Laboratory was commissioned to study the potential impact of a severe GIC event on the western U.S.-Canada power grid (referred to as the Western Interconnection). The study identified long transmission lines (length exceeding 150 miles) that did not include series capacitors. The basic assumption for the study is that a GIC is more likely to couple to long transmission lines, and that series capacitors would block the flow of the induced DC GIC. Power system simulations were conducted to evaluate impacts to the bulk power system if transformers on either end of these lines failed. The study results indicated that the Western Interconnection was not substantially at risk to GIC because of the relatively small number of transmission lines that met this criterion. This report also provides a summary of the Hydro-Québec blackout on March 13, 1989, which was caused by a GIC. This case study delves into the failure mechanisms of that event, lessons learned, and preventive measures that have been implemented to minimize the likelihood of its reoccurrence. Finally, the report recommends that the electric power industry consider the adoption of new protective relaying approaches that will prevent severe GIC events from catastrophically damaging transformers. The resulting changes may increase the likelihood of smaller disruptions but should prevent an unlikely yet catastrophic national-level event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Overview of Behind-the-Meter Solar-Plus-Storage Program Design: With Considerations for India

Indian consumers have been deploying behind-the-meter generation (predominantly diesel backup, and, more recently, photovoltaic) and storage systems (predominantly lead-acid and other kinds of batteries as uninterrupted power supplies) by the millions for decades) to address reliability issues within the Indian power system. The same energy storage systems could provide additional services to the consumer and distribution companies if properly regulated and designed from the outset to be grid interactive. Grid-connected distributed solar PV (DPV), or rooftop solar, has also seen wide deployment in India and features prominently in the Government of India’s plans for a transition to clean, reliable, and affordable energy for all. At the same time, many utilities and state governments, as well as the central government in India are currently funding-constrained for both operational and future capital expenditures in the power sector, and some perceive customer-sited resources as exacerbating existing financial challenges. In that context, behind-the-meter energy storage systems paired with distributed photovoltaic (DPV) - with the capability to act as both generation and load - represent a potentially unique and disruptive power sector technology capable of providing a range of important services to customers, utilities, and the broader power system in India. This report aims to offer a comprehensive, evidence-based approach to designing customer programs based on experience in the United States that can help regulators, utilities, and policymakers in India manage the range of challenges and opportunities that increased behind-the-meter energy storage deployment will bring to the power system, in particular when these systems are paired with DPV.

14 SOLAR ENERGY↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Opportunities for Hybrid Wind and Solar PV Plants in India

The share of variable renewable energy (VRE) on India's grid has surpassed 100 GW, and the government has ambitious plans reach 450 GW by 2030. One strategy to increase wind and solar PV deployment is through the co-location of wind and solar PV plants to form a single hybrid power plant. Hybrid plants have the potential to reduce transmission infrastructure costs and variability in the output power profile compared to a standalone plant with a single technology, and this resource analysis aims to take a first step towards quantifying the potential savings from hybridizing wind and solar PV plants in India and the size of this opportunity. We utilize a brute-force optimization to minimize the levelized cost of energy (LCOE) for standalone wind, standalone solar PV, and hybrid wind/solar PV plants across all of India. By comparing these LCOEs, we determine that locations where hybrid plants exhibit potential cost savings and grid benefits exhibit both; a high interconnection cost and; a wind capacity factor between roughly 34% and 38%. However, because our work does not capture the value of the electricity generated by looking at energy prices, nor does it quantify the potential of hybrids to provide other value streams such as firm capacity and reserves. Further, because the work does not compare solar PV and wind hybrids to alternative generation technologies or storage systems, it cannot be considered a holistic cost-benefit analysis.

14 SOLAR ENERGY↗

Use of Power Hardware-in-the-Loop and Controller Hardware-in-the-Loop to De-Risk the Use Of Grid-Forming Fuel Cell Inverters in Microgrids

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such interfaces are particularly challenging when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This presentation shows the use of PHIL interfaces for such microgrids and the preliminary experimental results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Digital Assurance for Grid Reliability in the Era of Large Load Growth

The rapid expansion of large electric loads is reshaping the operational and regulatory landscape of the U.S. electric grid. These facilities are reaching new scales of expansion, now exceeding a gigawatt per site, and their highly sensitive, digitally driven behaviors introduce new reliability risks. Recent grid events, including large load losses following routine transmission disturbances, highlight the consequences of limited ride-through capability, inconsistent protection settings, inadequate modeling, and lack of behind-the-meter visibility. Parallels to earlier integration challenges of new grid technologies suggest that the grid’s existing processes, standards, and interconnection frameworks are no longer adequate for emerging large loads. This brief synthesizes lessons from the evolution of inverter-based resource regulation and applies them to large-load integration. It identifies critical gaps in modeling accuracy, interconnection processes, performance standards, and compliance mechanisms. Technical recommendations emphasize advanced monitoring, improved modeling, coordinated communication protocols, modernized substations, and structured behind-the-meter control schemes. Collectively, these measures provide a roadmap to maintain bulk power system reliability while enabling the continued growth of large, electrified digital infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

The NASTRAN user's manual

All information directly associated with problem solving using the NASTRAN program is presented. This structural analysis program uses the finite element approach to structural modeling wherein the distributed finite properties of a structure are represented by a finite element of structural elements which are interconnected at a finite number of grid points, to which loads are applied and for which displacements are calculated. Procedures are described for defining and loading a structural model. Functional references for every card used for structural modeling, the NASTRAN data deck and control cards, problem solution sequences (rigid formats), using the plotting capability, writing a direct matrix abstraction program, and diagnostic messages are explained. A dictionary of mnemonics, acronyms, phrases, and other commonly used NASTRAN terms is included.

Source record↗

CBGA/PBGA for Highly Reliable Applications

The Jet Propulsion Laboratory (JPL) is currently assessing the use of Ball Grid Arrays (BGAs) for National Aeronautics and Space Administration (NASA) spaceflight applications. This work is being funded through NASA Headquarters, Code Q. The objectives are to demonstrate the robustness, quality and reliability of BGAs technology, and to assist in the solicited industrial, academic and other related consortia to work together to leverage the related efforts into a synergistic effort. Initial results of these activities will be summarized and presented in this paper.

code Q BGA's ball grid arrays Advanced Interconnec↗

Distributed Wind Deployment: Dairy Farm

This is case study on distributed wind. Located on the plains in rural Colorado, this family farm uses a distributed wind system to offset electricity used by energy-intensive dairy farming. Their site is ideal for distributed wind development because there are minimal obstacles to block the prevailing winds coming from the west. (Buildings shown are to the east and south, not the dominant wind direction.) The turbines were interconnected on long distribution lines and grid infrastructure upgrades were completed as part of the project.

distributed↗

Electric Vehicles at Scale (EVs@Scale) Laboratory Consortium Deep-Dive Technical Meetings: High Power Charging (HPC) Summary Report

Electric vehicle (EV) adoption will change the composition of EV charging load to higher-power charging as more medium- (MD) and heavy-duty (HD) applications are electrified, and as all vocations, including light-duty (LD) vehicles, are capable of faster charging. These shifts provide the opportunity for high-power charging (HPC) and facility equipment to evolve and improve efficiency, cost, and space. High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project designs and develops a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration approaches and technology solutions. The project addresses (1) interconnection and management of a grid-tied inverter; (2) development of a DC distribution system that is responsible for system energy management, interoperability, and DC protection; (3) modular DC/DC conversion for vehicle charging; (4) EV charging interface and DC/DC integration; and (5) smart charge control and vehicle-to-edge (vehicle-to-building [V2B], vehicle-to-everything [V2X]) capability. This summary presentation is the first technical progress output of the project. It provides insight for the first deep-dive technical meeting outputs in terms of research presentations and also includes summary of the discussions occurred in the follow-up breakout sessions. The summary presentation covers three technical areas: (1) HPC: State of the art power architectures and the design of the power electronics, (2) Modeling, energy management, and power control in the HPC station, and (3) Codes and standards work that are in line with the previous two topic areas.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Electric Vehicles at Scale (EVs@Scale) Laboratory Consortium Deep-Dive Technical Meetings: High Power Charging (HPC) Summary Report

Electric vehicle (EV) adoption will change the composition of EV charging load to higher-power charging as more medium- (MD) and heavy-duty (HD) applications are electrified, and as all vocations, including light-duty (LD) vehicles, are capable of faster charging. These shifts provide the opportunity for high-power charging (HPC) and facility equipment to evolve and improve efficiency, cost, and space. High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project designs and develops a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration approaches and technology solutions. The project addresses (1) interconnection and management of a grid-tied inverter; (2) development of a DC distribution system that is responsible for system energy management, interoperability, and DC protection; (3) modular DC/DC conversion for vehicle charging; (4) EV charging interface and DC/DC integration; and (5) smart charge control and vehicle-to-edge (vehicle-to-building [V2B], vehicle-to-everything [V2X]) capability. This summary presentation is the first technical progress output of the project. It provides insight for the first deep-dive technical meeting outputs in terms of research presentations and also includes summary of the discussions occurred in the follow-up breakout sessions. The summary presentation covers three technical areas: (1) HPC: State of the art power architectures and the design of the power electronics, (2) Modeling, energy management, and power control in the HPC station, and (3) Next Generation Profiles for high power charging characterization.

ADVANCED PROPULSION SYSTEMS↗