Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Next Generation Solid Oxide Fuel Cell Module Development

The overall objective of this project was to develop a transformative Solid Oxide Fuel Cell (SOFC) building block configuration comprised of multi-stack arrays that can be utilized in large-scale power plants. This transformative design signified the benefits of lower performance degradation coupled with improved reliability, low cost, smaller packaging for easier transport and installation, and improved maintenance and field serviceability characteristics. The project goal was to design and fabricate a scalable hot module for housing an array of SOFC stacks and to demonstrate the characteristics of the module gas distribution, insulation and instrumentation, and DC power take-off. The approach was to validate the design of a stack prototype scalable to megawatt (MW) class systems using FuelCell Energy’s Compact SOFC Architecture (CSA) stacks. The scope of work was intended to design, build, and test a compact and low-cost multi-stack sub-module with flexibility to house CSA stacks and scalable to 350 kW which could ultimately be deployed in construction of MW-class systems.

20 FOSSIL-FUELED POWER PLANTS↗

Stabilizing the Power System in 2035 and Beyond: Evolving from Grid-Following to Grid-Forming Distributed Inverter Controllers (Final Technical Report)

Under existing grid operations, large synchronous generators provide sufficient rotational inertia to form a rigid backbone for the bulk power system. With photovoltaics (PV) forecasted to provide more than 600 GW of generation by 2050 under the U.S. Department of Energy’s SunShot Initiative objectives, however, it is clear that power electronic inverters will play a dominant role in future systems, and low-inertia stability must be ensured to maintain system reliability. Today, the risks to system stability can be observed on geographically small islands, such as Hawaii, which contain a relatively large amount of installed PV. These risks stem from a fundamental shortcoming of contemporary control strategies—existing inverter controllers cannot guarantee grid stability. Given that future power systems driven by sustainable resources will be characterized by low inertia, locations such as Hawaii provide a glimpse into the obstacles facing future power systems. Considering these challenges, the aim of this project was to develop and demonstrate distributed inverter controllers that enable the reliable control of low-inertia power systems with hundreds of gigawatts of integrated PV.

14 SOLAR ENERGY↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology’s total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

Zolan, Alexander (ORCID:0000000326017604)↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements: Preprint

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology's total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

concentrating solar power↗

Update on the Investigation of Commercial Drying Cycles Using the Advanced Drying Cycle Simulator

The purpose of this report is to document updates on the apparatus to simulate commercial vacuum drying procedures at the Nuclear Energy Work Complex at Sandia National Laboratories. Validation of the extent of water removal in a dry spent nuclear fuel storage system based on drying procedures used at nuclear power plants is needed to close existing technical gaps. Operational conditions leading to incomplete drying may have potential impacts on the fuel, cladding, and other components in the system during subsequent storage and disposal. A general lack of data suitable for model validation of commercial nuclear canister drying processes necessitates well-designed investigations of drying process efficacy and water retention. Scaled tests that incorporate relevant physics and well-controlled boundary conditions are essential to provide insight and guidance to the simulation of prototypic systems undergoing drying processes. This report documents a new test apparatus, the Advanced Drying Cycle Simulator (ADCS). This apparatus was built to simulate commercial drying procedures and quantify the amount of residual water remaining in a pressurized water reactor (PWR) fuel assembly after drying. The ADCS was constructed with a prototypic 17×17 PWR fuel skeleton and waterproof heater rods to simulate decay heat. These waterproof heaters are the next generation design to heater rods developed and tested at Sandia National Laboratories in FY20. This report describes the ADCS vessel build that was completed late in FY22, including the receipt of the prototypic length waterproof heater rods and construction of the fuel basket and the pressure vessel components. In addition, installations of thermocouples, emissivity coupons, pressure and vacuum lines, pressure transducers, and electrical connections were completed. Preliminary power functionality testing was conducted to demonstrate the capabilities of the ADCS. In FY23, a test plan for the ADCS will be developed to implement a drying procedure based on measurements from the process used for the High Burnup Demonstration Project. While applying power to the simulated fuel rods, this procedure is expected to consist of filling the ADCS vessel with water, draining the water with applied pressure and multiple helium blowdowns, evacuating additional water with a vacuum drying sequence at successively lower pressures, and backfilling the vessel with helium. Additional investigations are expected to feature failed fuel rod simulators with engineered cladding defects and guide tubes with obstructed dashpots to challenge the drying system with multiple water retention sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fort Mojave Indian Tribe Aha Macav Power Service Renewable Energy Project

Aha Macav Power Service (AMPS), on behalf of the Fort Mojave Indian Tribe received a Department of Energy Solar grant. Partnering with Stockbridge Energy Group and the Department of Energy, AMPS was able to construct, install, test and successfully put into operation a 2.3 MW solar field. As provided in the solar data, this project has helped to offset the cost of open market purchase power needed to meet the needs of the Tribe. The estimated value of the solar energy produced in FY2021 currently is more than $294,000. Eventual expansion of the solar project is projected to create future energy independence for the Fort Mojave Indian Tribe.

14 SOLAR ENERGY↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of Power Take-Off Architectures for Wave-Powered Reverse Osmosis Desalination of Seawater with Co-Production of Electricity

Several power take-off (PTO) architectures for wave-powered reverse osmosis (RO) desalination of seawater are introduced and compared based on the annual average freshwater production and the size of the components, which strongly relate to the costs of the system. The set of architectures compared includes a novel series-type PTO architecture not previously considered. These seawater hydraulic PTO architectures are composed of a WEC-driven pump, an RO module, an intake charge pump driven by an electric motor, and a hydraulic motor driving an electric generator for electric power production. This study is performed using an efficient two-way coupled steady-state model for the average performance of the system in a given sea state, including freshwater permeate production, electric power production, and electric power consumption. A multi-objective design problem is formulated for the purposes of this comparative study, with the objectives of maximizing annual freshwater production, minimizing the displacement of the WEC-driven pump, and minimizing the installed RO membrane area. This establishes a framework for comparison in the absence of a mature techno-economic model. The requirement that the system produces enough electric power to meet its consumption is applied as a constraint on the operation of the system. The oscillating wave surge converter Oyster 1 is assumed as the WEC. Weights on performance of the system in a given sea state are based on historical data from Humboldt Bay, CA. This study finds that (1) architectures in a series configuration allow for a reduction in the WEC-driven pump size of 59–92% compared to prior work, (2) varying the displacement of the WEC-driven pump between sea conditions does not provide any significant advantage in performance, and (3) varying the active RO membrane area between sea condition offers improvements between 7% and 41% in each design objective.

Energy & Fuels↗

Enhanced cooling tower technology for power plant efficiency increase and operating flexibility

The Final Report describes the results of the work completed during the “Enhanced Cooling Tower Technology for Power Plant Efficiency Increase and Operating Flexibility” project. The objectives of work were to develop and demonstrate the prototype (up to 100 kWth) of an economically viable “all weather” Sub-Dew Point Cooling Tower (SDPCT) with inlet air cooling and dehumidification including testing in laboratory-controlled environment for simulating various ambient conditions. The inlet air is cooled and dehumidified by a Pressure Dehumidifying System (PDHS) installed at the cooling tower inlet.

20 FOSSIL-FUELED POWER PLANTS↗

DUNE Photon Detection System

The Deep Underground Neutrino Experiment (DUNE) aims to provide a broad physics program primarily addressed to probing CP violation in the neutrino sector and identifying the neutrino mass hierarchy. The search for proton decay, the observation of supernova neutrino bursts, and the investigation of solar neutrinos represent other additional goals of DUNE experiment, which can be enhanced by the use and the high performances of the Photon Detection System (PDS). Using the technology based on liquid argon Time Projection Chamber (LArTPC), the experiment plans to observe neutrino interactions inside detectors located 1300 km away from the Long Baseline Neutrino Facility (LBNF) at Fermi National Accelerator Laboratory (FNAL), where the neutrinos are produced. The experiment consists of two main parts, respectively the far and near detectors. The far site will comprise four detector modules. The first module is constituted by a vertical drift single-phase LArTPC, while the second module provides a horizontal drift single-phase LArTPC. The configurations of the other modules are still under definition. Neutrino detection in LArTPCs is achieved by identifying the charge and light generated from its interactions with liquid argon. The wire planes of the instrumented anode and the PDS detect these signals, respectively. The PDS in the first two modules, detailed in the present document, uses a modified version of the so-called ARAPUCA technology, named X-ARAPUCA. This system consisting of a highly reflecting box with an entrance window made by dichroic filters and wavelength shifters, creates a trap to detect the VUV (128 nm) scintillation photons. The X-ARAPUCA of the first module is called Supercell, and it has dimensions of 488×100 mm 2 , while Megacell is the second module version, with an active area of 60×60 cm 2 . This latter configuration also represents a significant technological advancement. Since half of the modules are placed on the cathode at high voltage, they are powered and read out using innovative power-over-fiber (PoF) and signal-over-fiber (SoF) technologies. Meanwhile, the other half are installed in a membrane behind the field cage, with a total transparency of around 70%.

Neutrino detectors↗

Summary of Results for Idaho Accelerator Center (IAC) Experiments with Compact Electron Permanent Magnet Spectrometer (CEPMS)

The Compact Electron Permanent Magnet Spectrometer (CEPMS) shown in Figure 2 consists of collimation at the electron beam entrance, a vacuum chamber for beam transport and a removable 60 degree sector magnet constructed by SABR Enterprises (Ref 2) that is used to momentum analyze the incoming electron beam. There are electron detection planes located perpendicular to straight through and the 60 degree trajectory ports. The planes are designed to accept phosphor screens for time integrated measurements. The screens can be replaced by scintillator for time resolved measurements using gated or streak cameras. The length of the spectrometer along the beamline without the collimator is about 400mm (14”). The spectrometer requires no power supply with controls for cycling or cooling for the magnet. The entire assembly, with magnet installed, weighs about 35kg (75lbs) Figure 3 depicts central and extreme trajectories through the spectrometer for various electron energies. The chamber accommodates a +/-50mm wide detection field relative to the center trajectory. Trajectories with larger momentum (energy) are bent the least. Since the permanent magnet slides off and on with reference to the upstream edge of the vacuum chamber, it can be adjusted to various positions to slightly increase or decrease the central energy thereby changing the range of available energies. Figure 4 shows the effect of changing the location of the permanent magnet on the electron trajectory. A small inward change in r produces a longer trajectory in the magnet therefore, the same energy trajectory is bent more.

43 PARTICLE ACCELERATORS↗

Centralized and Decentralized Distributed Energy Resource Access Control Implementation Considerations.

A global transition to power grids with high penetrations of renewable energy generation is being driven in part by rapid installations of distributed energy resources (DER). New DER equipment includes standardized IEEE 1547-2018 communication interfaces and proprietary communications capabilities. Interoperable DER provides new monitoring and control capabilities. The existence of multiple entities with different roles and responsibilities within the DER ecosystem makes the Access Control (AC) mechanism necessary. In this paper, we introduce and compare two novel architectures, which provide a Role-Based Access Control (RBAC) service to the DER ecosystem’s entities. Selecting an appropriate RBAC technology is important for the RBAC administrator and users who request DER access authorization. The first architecture is centralized, based on the OpenLDAP, an open source implementation of the Lightweight Directory Access Protocol (LDAP). The second approach is decentralized, based on a private Ethereum blockchain test network, where the RBAC model is stored and efficiently retrieved via the utilization of a single Smart Contract. We have implemented two end-to-end Proofs-of-Concept (PoC), respectively, to offer the RBAC service to the DER entities as web applications. Finally, an evaluation of the two approaches is presented, highlighting the key speed, cost, usability, and security features.

42 ENGINEERING↗

Vegetation Warming Experiment: Landscape-scale digital camera imagery for vegetation phenology, Utqiagvik (Barrow), Alaska, 2017

Images captured using a StarDot NetCam SC phenocamera looking east from the top of the Barrow Environmental Observatory (BEO) Sled Shed, Barrow (now Utqiagvik), Alaska. The camera was installed to remotely monitor plant phenology and operation of the BNL TEST group's ZPW (Zero Power Warming) chambers during the growing season of 2017. Images were captured from early spring (24 April) through to late fall (15 November). Snowmelt, vegetation growth and senescence, and snow accumulation were captured. Images were uploaded to the BNL FTP server every 10 minutes. jpg images have been compressed in *.tar.gz format (12.1 GB) and additional information in *.pdf and *.txt files. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Vegetation Warming Experiment: Landscape-scale digital camera imagery for vegetation phenology, Utqiagvik (Barrow), Alaska, 2018

Images captured using a StarDot NetCam SC phenocamera looking east from the top of the Barrow Environmental Observatory (BEO) Sled Shed, Utqiagvik, Alaska. The camera was installed to remotely monitor plant phenology and operation of the BNL TEST group's ZPW (Zero Power Warming) chambers during the growing season of 2018. Images were captured from early spring (13 April) through to mid fall (18 October). Snowmelt, vegetation growth and senescence, and snow accumulation were captured. Images were uploaded to the BNL FTP server every hour until 16 June, and then every 10 minutes. Files were renamed with the date and time of the image. jpg images have been compressed in *.tar.gz format (7.9 GB). Different fields of view (northeasterly) were also captured using 3 Wingscapes TimelapseCam cameras mounted on a mast on the sled shed. Images were recorded from 21 June to 24 September, 2018, at 30 minute intervals, from 11:00 - 14:30, Alaska daylight time (AKDT, UTC-8). Movie files (.mp4) of each Wingscapes camera dataset. Additional metadata included in *.pdf and *.csv files. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Utility Energy Service Contract Boosts Chemical Weapons Destruction Mission at Army Pueblo Chemical Depot

For six decades, the U.S. Army has safely and securely stored chemical munitions at the Pueblo Chemical Depot in Colorado. To help fulfill international treaty obligations and to meet a congressional deadline of 2023 for the elimination of these aging weapons, initial destruction of the Pueblo chemical weapons stockpile began in 2015. A utility energy service contract (UESC) executed in 2016 between the U.S. Army Corps of Engineers and the Depot’s serving utility, Black Hills Energy (BHE), directly supported this mission with the installation of a new electrical substation that was essential to the Depot’s need for uninterrupted power.

Army Pueblo Chemical Depot↗

SRF Cavity Emulator for PIP-II LLRF Lab and Field Testing

There are many stages in the LLRF and RF system development process for any new accelerator that can take advantage of hardware emulation of the high-power RF system and RF cavities. LLRF development, bench testing, control system development and testing of installed systems must happen well before SRF cavities are available for test. The PIP-II Linac has three frequencies of SRF cavities, 162.5 MHz, 325 MHz and 650 MHz and a simple analog emulator design has been chosen that can meet the cavity bandwidth requirements, provide tuning errors to emulate Lorentz force detuning and microphonics for all cavity types. This emulator design utilizes a quartz crystal with a bandwidth of 65Hz at an IF of ~ 4 MHz, providing a Q of ~ 1.3 x 10^7 at 650MHz. This paper will discuss the design and test results of this emulator.

43 PARTICLE ACCELERATORS↗