Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated system testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

NASA Advanced Explorations Systems: 2018 Advancements in Life Support Systems

The NASA Advanced Exploration Systems (AES) Life Support Systems (LSS) project strives to develop reliable, energy-efficient, and low-mass spacecraft systems to provide envi-ronmental control and life support systems (ECLSS) critical to enabling long duration human missions beyond low Earth orbit (LEO). Highly reliable, closed-loop life support systems are among the capabilities required for the longer duration human space exploration missions planned in the mid-2020s and beyond. The LSS Project is focused on three life support areas: air revitalization, wastewater processing/water management and environmental monitoring. Building upon the International Space Station (ISS) LSS systems (where applicable), the three-fold mission of the LSS Project is to address discrete LSS technology gaps, to improve the reliability of LSS systems, and to advance LSS systems toward integrated testing aboard the ISS. This paper is a follow on to the AES LSS development status reported in 2017 and provides additional details on the progress made since that publication with specific attention to the status of the Aerosol Sampler ISS Flight Experiment, the Spacecraft Atmosphere Monitor (SAM) Flight Experiment, the Brine Processor Assembly (BPA) Flight Experiment as well as the progress of the terrestrial development in air, water and environmental monitoring technologies.

trace contaminant control↗

IXPE Mission System Concept and Development Status

The Goal of the Imaging X-Ray Polarimetry Explorer (IXPE) Mi SMEX), is to expand understanding of high-energy astrophysical processes and sources, in support of NASA’s first science objective in Astrophysics: “Discover how the universe works.” IXPE, an international collaboration, will conduct X-ray imaging polarimetry for multiple categories of cosmic X-ray sources such as neutron stars, stellar-mass black holes, supernova remnants and active galactic nuclei. The Observatory uses a single science operational mode capturing the X-ray data from the targets. The IXPE Observatory consists of spacecraft and payload modules built up in parallel to form the Observatory during system integration and test. The payload includes three X-ray telescopes each consisting of a polarization-sensitive, gas pixel X-ray detector, paired with its corresponding grazing incidence mirror module assembly (MMA). A deployable boom provides the correct separation (focal length) between the detector units (DU) and MMAs. These payload elements are supported by the IXPE spacecraft which is derived from the BCP-small spacecraft architecture. This paper summarizes the IXPE mission science objectives, updates the Observatory implementation concept including the payload and spacecraft ts and summarizes the mission status since last year’s conference.

Deininger, William D.↗

Formal Methods Demonstration Project for Space Applications

Requirements and design specifications are a high priority candidate for better software engineering techniques. Most hazardous software safety errors found during system integration and test of two NASA spacecraft were the result of requirements discrepancies or interface specifications. The highest density of major defects found through the use of software inspections was during the requirements phase. This was seven times higher than the density of major defects found in code inspections. Requirements errors are between 10 and 100 times more costly to fix at later phases of the software lifecycle than at the requirements phase itself. One study found that early lifecycle errors are the most likely to lead to catastrophic failures.

critical↗

Channel and Terminal Description of the ACTS Mobile Terminal

The Advanced Communications Technology Satellite (ACTS) Mobile Terminal (AMT) is a proof-of-concept K/Ka-band mobile satellite communications terminal under development by NASA at the Jet Propulsion Laboratory. Currently, the AMT is undergoing system integration and test in preparation for a July 1993 ACTS launch and the subsequent commencement of mobile experiments in the fall of 1993. The AMT objectives are presented, followed by a discussion of the AMT communications channel, and mobile terminal design and performance.

communications↗

Engineering

2021 MIT Annual Report: Employing expertise in electrical, mechanical, structural, thermal, aerodynamics, optical, controls, and software engineering to build, integrate, and test systems for application in the development of advanced technology prototypes.

space communications↗

Initial SVS Integrated Technology Evaluation Flight Test Requirements and Hardware Architecture

This document presents the flight test requirements for the Initial Synthetic Vision Systems Integrated Technology Evaluation flight Test to be flown aboard NASA Langley's ARIES aircraft and the final hardware architecture implemented to meet these requirements. Part I of this document contains the hardware, software, simulator, and flight operations requirements for this light test as they were defined in August 2002. The contents of this section are the actual requirements document that was signed for this flight test. Part II of this document contains information pertaining to the hardware architecture that was realized to meet these requirements as presented to and approved by a Critical Design Review Panel prior to installation on the B-757 Airborne Research Integrated Experiments Systems (ARIES) airplane. This information includes a description of the equipment, block diagrams of the architecture, layouts of the workstations, and pictures of the actual installations.

Harrison, Stella V.↗

Desert Research and Technology Studies 2005 Report

During the first two weeks of September 2005, the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Advanced Extravehicular Activity (AEVA) team led the field test portion of the 2005 Research and Technology Studies (RATS). The Desert RATS field test activity is the culmination of the various individual science and advanced engineering discipline areas year-long technology and operations development efforts into a coordinated field test demonstration under representative (analog) planetary surface terrain conditions. The purpose of the RATS is to drive out preliminary exploration concept of operations EVA system requirements by providing hands-on experience with simulated planetary surface exploration extravehicular activity (EVA) hardware and procedures. The RATS activities also are of significant importance in helping to develop the necessary levels of technical skills and experience for the next generation of engineers, scientists, technicians, and astronauts who will be responsible for realizing the goals of the Constellation Program. The 2005 Desert RATS was the eighth RATS field test and was the most systems-oriented, integrated field test to date with participants from NASA field centers, the United States Geologic Survey (USGS), industry partners, and research institutes. Each week of the test, the 2005 RATS addressed specific sets of objectives. The first week focused on the performance of surface science astro-biological sampling operations, including planetary protection considerations and procedures. The second week supported evaluation of the Science, Crew, Operations, and Utility Testbed (SCOUT) proto-type rover and its sub-systems. Throughout the duration of the field test, the Communications, Avionics, and Infomatics pack (CAI-pack) was tested. This year the CAI-pack served to provide information on surface navigation, science sample collection procedures, and EVA timeline awareness. Additionally, 2005 was the first year since the Apollo program that two pressurized suited test subjects have worked together simultaneously. Another first was the demonstration of recharge of cryogenic life support systems while in-use by the suited test subjects. The recharge capability allowed the simulated EVA test duration to be doubled, facilitating SCOUT proto-type rover testing. This paper summarizes Desert RATS 2005 test hardware, detailed test objectives, test operations and test results.

Ross, Amy J.↗

Planned flight test of a mercury ion auxiliary propulsion system. Part 2: Integration with host spacecraft

The objectives of the flight test and a description on how those objectives are in support of an overall program goal of attaining user application were described. The approach to accomplishment was presented as it applies to integrating the propulsion system with the host spacecraft. A number of known interface design considerations which affect the propulsion system and the spacecraft were discussed. Analogies were drawn comparing the relationship of the organizations involved with this flight test with those anticipated for future operational missions. The paper also expanded upon objectives, system description, mission operations, and measurement of plume effects.

Knight, R. M.↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, J. J.↗

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, Jessica J.↗

Development and Testing of a Lab-Scale Electrochemical Refrigerator

Eta Space and NASA have been developing a lab-scale electrochemical hydrogen refrigerator (ECHR) capable of providing isothermal heat exchange for applications in the 20-Kelvin range. The cryocooler utilizes an electrochemical compressor paired with Joule-Thomson expansion to cool the hydrogen working fluid down to its saturation point within a purpose-built cold box. The use of electrochemical compression allows the cycle to operate with no moving parts presenting several key advantages for a variety of applications. Testing of the integrated system occurred in Eta Space’s cryogenic test facility where the system was able to achieve and maintain saturated temperatures at low pressure. Results of this test campaign demonstrate the feasibility of the ECHR concept in practice.

D J Hollibaugh↗

Thermal Integration of a Liquid Acquisition Device into a Cryogenic Feed System

Primary objectives of this effort were to define the following: (1) Approaches for quantification of the accumulation of thermal energy within a capillary screen liquid acquisition device (LAD) for a lunar lander upper stage during periods of up to 210 days on the lunar surface, (2) techniques for mitigating heat entrapment, and (3) perform initial testing, data evaluation. The technical effort was divided into the following categories: (1) Detailed thermal modeling of the LAD/feed system interactions using both COMSOL computational fluid device and standard codes, (2) FLOW-3D modeling of bulk liquid to provide interfacing conditions for the LAD thermal modeling, (3) condensation conditioning of capillary screens to stabilize surface tension retention capability, and (4) subscale testing of an integrated LAD/feed system. Substantial progress was achieved in the following technical areas: (1) Thermal modeling and experimental approaches for evaluating integrated cryogen LAD/feed systems, at both the system and component levels, (2) reduced gravity pressure control analyses, (3) analytical modeling and testing for capillary screen conditioning using condensation and wicking, and (4) development of rapid turnaround testing techniques for evaluating LAD/feed system thermal and fluid integration. A comprehensive effort, participants included a diverse cross section of representatives from academia, contractors, and multiple Marshall Space Flight Center organizations.

Hastings, L. J.↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) completed its system-level space simulation testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered to the next level of integration with the Optical Telescope Element (OTE), to form OTIS (OTE + ISIM), after concluding a series of three cryo-vacuum (CV) tests. During these tests, the complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration following mechanical environmental tests (vibration and acoustics). From one test to the next, shortcomings of the facility were uncovered and associated improvements in operational capabilities and reliability of the facility were required to enable the project to verify system-level requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

System-Integrated Finite Element Analysis of a Full-Scale Helicopter Crash Test with Deployable Energy Absorbers

A full-scale crash test of an MD-500 helicopter was conducted in December 2009 at NASA Langley's Landing and Impact Research facility (LandIR). The MD-500 helicopter was fitted with a composite honeycomb Deployable Energy Absorber (DEA) and tested under vertical and horizontal impact velocities of 26-ft/sec and 40-ft/sec, respectively. The objectives of the test were to evaluate the performance of the DEA concept under realistic crash conditions and to generate test data for validation of a system integrated finite element model. In preparation for the full-scale crash test, a series of sub-scale and MD-500 mass simulator tests was conducted to evaluate the impact performances of various components, including a new crush tube and the DEA blocks. Parameters defined within the system integrated finite element model were determined from these tests. The objective of this paper is to summarize the finite element models developed and analyses performed, beginning with pre-test predictions and continuing through post-test validation.

Annett, Martin S.↗

Increasing software testability with standard access and control interfaces

Testing is the most common method of determining whether a software system satisfies its requirements. Traditionally, testing starts with the detailed examination of individual functions or methods, progresses through the integration of functions or methods into subsystems, and ends with testing the functionality and behavior of the completely integrated system. At each stage of testing, the amount of functionality and behavior of the artifact being tested is increasingly limited. One reason for this is that it becomes impossible to test all paths through the system within a reasonable amount of time. However, another reason for this progressive decrease of test coverage has to do with increasingly limited control of and visibility into the state of the artifact being tested. During unit test, it is rather simple to control the inputs of individual functions or methods or view their internal state - modem development environments provide adequate facilities for doing so. However, these facilities do not scale up to the testing of partially or completely integrated systems. Control of and visibility into the system's state is then limited to the input and output facilities provided by the software itself as well as the hardware on which the software is hosted during the test. These facilities are usually insufficient to precisely control the state of individual components or sets of components of the system; they are also inadequate to the task of displaying on demand the state of specific components. We describe an approach to improving the testability of complex software systems with software constructs modeled after the hardware JTAG bus, used to provide visibility and controllability in testing digital circuits.

Tamir, Yuval↗