Search NASA⌕ Search

SEARCH · Search NASA

Results for “jwst”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

James Webb Space Telescope Optical Telescope Element Mirror Coatings

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) mirror coating program has been completed. The science goals of the JWST mission require a uniform, low stress, durable optical coating with high reflectivity over the JWST spectral region. The coating has to be environmentally stable, radiation resistant and compatible with the cryogenic operating environment. The large size, 1.52 m point to point, light weight, beryllium primary mirror (PM) segments and flawless coating process during the flight mirror coating program that consisted coating of 21 flight mirrors were among many technical challenges. This paper provides an overview of the JWST telescope mirror coating program. The paper summarizes the coating development program and performance of the flight mirrors.

Keski-Kuha, Ritva A.↗

The James Webb Space Telescope and its Capability for for Exoplanet Observations

The James Webb Space Telescope (JWST) is a large aperture (6.5 .meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micron to 28 micron. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. In this presentation we will discuss the status of the JWST project and review the expected scientific performance of the observatory for observations of exosolar planets by means of transit observations, and direct coronagraphic imaging. In particular we will discuss recent simulations of photometric and spectroscopic transit observations that demonstrate the capabilities of JWST to characterize superearth atmospheres in the light of recent Kepler and Corot discoveries

Clampin, Mark↗

Science Operations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a powerful space observatory whose four science instruments will deliver rich imaging and multiplexed spectroscopic datasets to the astronomical and planetary science communities. The ground segment for JWST, now being designed and built, will carry out JWST's science operations. The ground segment includes: (1) software that the scientific community will use to propose and specify new observations; (2) software that will schedule both science and calibration observations in a way that optimizes observing efficiency while managing the accumulation of momentum; (3) the infrastructure to regularly measure and maintain the telescope's wavefront; (4) orbit determination, ranging, and tracking; (5) communication via the Deep Space Network to command the observatory and retrieve scientific data; (6) onboard scripts that execute each observing program in an event-driven fashion, with occasional interruptions for targets of opportunity or time-critical observations; and (7) a system that processes and calibrates the data into science ready products, automatically recalibrates when calibrations improve, and archives the data for timely access by the principal investigator and later worldwide access by the scientific community. This ground system builds on experience from operating the Hubble Space Telescope, while solving challenges that are unique to the James Webb Space Telescope. In this paper, we describe the elements of the JWST ground system, how it will work operationally from the perspective of the observatory itself, and how a typical user will interact with the system to turn his/her idea into scientific discovery.

Rigby, Jane↗

Telescope Innovations Improve Speed, Accuracy of Eye Surgery

One of the main components of NASA's vision for the future of space exploration will actually have a keen eye for the past. The James Webb Space Telescope (JWST), scheduled to launch in 2018, will have spectacular sight, after it reaches orbit, one of its main goals is to observe the first galaxies that formed in the early universe. "JWST offers new capabilities in the infrared well beyond what we can see from current telescopes, either on the ground or in space. It will let us explore the early universe, extrasolar planets, and really, all branches of astrophysics," says Lee Feinberg, optical telescope element manager for the JWST at Goddard Space Flight Center. Building such a keen space telescope is an astronomic task. Because JWST will gaze over such incredible distances, it requires very large mirrors. In fact, the primary mirror will be more than two stories in diameter and consists of 18 separate segments. Each segment must be perfectly smooth, flat, and scratch-free in order to deliver a view 13 billion light years away. Construction of the 18 mirror segments involved measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing (you get the idea). One of the most time consuming steps of the mirror development process, the grinding phase, can take years.

Source record↗

James Webb Space Telescope Launch Window Trade Analysis

The James Webb Space Telescope (JWST) is a large-scale space telescope mission designed to study fundamental astrophysical questions ranging from the formation of the universe to the origin of planetary systems and the origins of life. JWSTs orbit design is a Libration Point Orbit (LPO) around the Sun-EarthMoon (SEM) L2 point for a planned mission lifetime of 10.5 years. The launch readiness period for JWST is from Oct 1st, 2018 November 30th, 2018. This paper presents the first launch window analysis for the JWST observatory using finite-burn modeling; previous analysis assumed a single impulsive midcourse correction to achieve the mission orbit. The physical limitations of the JWST hardware stemming primarily from propulsion, communication and thermal requirements alongside updated mission design requirements result in significant launch window within the launch readiness period. Future plans are also discussed.

James Webb Space Telescope↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-EarthMoon L2 libration point, 1.5 million km away from Earth. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate orbit determination (OD) solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cmsec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

James Webb Space Telescope↗

Launch Window Trade Analysis for the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large-scale space telescope mission designed to study fundamental astrophysical questions ranging from the formation of the universe to the origin of planetary systems and the origins of life. JWSTs orbit design is a Libration Point Orbit (LPO) around the Sun-Earth/Moon (SEM) L2 point for a planned mission lifetime of 10.5 years. The launch readiness period for JWST is from Oct 1st, 2018 November 30th, 2018. This paper presents the first launch window analysis for the JWST observatory using finite-burn modeling; previous analysis assumed a single impulsive midcourse correction to achieve the mission orbit. The physical limitations of the JWST hardware stemming primarily from propulsion, communication and thermal requirements alongside updated mission design requirements result in significant launch window within the launch readiness period. Future plans are also discussed.

window↗

Alignment and Testing of Critical Interface Fixtures for the James Webb Space Telescope

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory architecture includes the Primary Mirror Backplane Support Structure (PMBSS) and Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) which is designed to integrate to the spacecraft bus via six cup/cone interfaces. Prior to integration to the spacecraft bus the JWST observatory must undergo environmental testing, handling, and transportation. Multiple fixtures were developed to support these tasks including the vibration fixture and handling and integration fixture (HIF). This work reports on the development of the nominal alignment of the six interfaces and metrology operations performed for the JWST observatory to safely integrate them for successful environmental testing.

technology development↗

Application of Molecular Adsorber Coatings in Chamber A for the James Webb Space Telescope

As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination. As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination.

molecular contamination↗

Alignment and Testing of Critical Interface Fixtures for the James Webb Space Telescope

NASAs James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory architecture includes the Primary Mirror Backplane Support Structure (PMBSS) and Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) which is designed to integrate to the spacecraft bus via six cupcone interfaces. Prior to integration to the spacecraft bus the JWST observatory must undergo environmental testing, handling, and transportation. Multiple fixtures were developed to support these tasks including the vibration fixture and handling and integration fixture (HIF). This work reports on the development of the nominal alignment of the six interfaces and metrology operations performed for the JWST observatory to safely integrate them for successful environmental testing.

instrument development↗

Characterizing Exoplanet Atmospheres with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will have numerous modes for acquiring photometry and spectra of stars, planets, galaxies, and other astronomical objects over wavelengths of 0.6 - 28 microns. Several of these modes are well-suited for observing atomic and molecular features in the atmospheres of transiting or spatially resolved exoplanets. I will present basic information on JWST capabilities, highlight modes that are well-suited for observing exoplanets, and give examples of what may be learned from JWST observations. This will include simulated spectra and expected retrieved chemical abundance, composition, equilibrium, and thermal information and uncertainties. JWST Cycle 1 general observer proposals are expected to be due in March 2018 with launch in October 2018, and the greater scientific community is encouraged to propose investigations to study exoplanet atmospheres and other topics.

space telescopes↗

Data Processing for High-Contrast Imaging with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will probe circumstellar environments at an unprecedented sensitivity.However, the performance of high-contrast imaging instruments is limited by the residual light from the star at close separations (<2-3”), where the incidence of exoplanets increases rapidly. There is currently no solution to get rid of the residual light down to the photon noise level at those separations, which may prevent some crucial discoveries. JWST’s debut is planned for October 2021 for a baseline mission lifetime of only five years. Thus,it is crucial to find a solution to this problem before its launch. We are further developing and implementing an innovative approach of post-processing built on a Bayesian framework that provides a more robust determination of faint astrophysical structures around a bright source. This approach uses a model of high-contrast imaging instrument that takes advantage of prior information, such as data from wavefront sensing (WFS) operations on JWST, to estimate simultaneously instrumental aberrations and the circumstellar environment. With this approach, our goal is to further improve the contrast gain over the contrast that can be achieved with JWST instruments, starting with NIRCam imaging and coronagraphic imaging. This work will pave the way for the future space-based high-contrast imaging instruments such as the Nancy Grace Roman Space Telescope Coronagraph Instrument (Roman CGI). This technique will be crucial to make the best use of the telemetry data that will be collected during the CGI operations.

Jewell, Jeffrey B.↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

Predicting contamination accumulation in facilities with limited data

In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors turned out to be much cleaner than what was predicted.

James Webb Space Telescope, contamination, cleanro↗

Predicting contamination accumulation in facilities with limited data

"In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors are likely much cleaner than was expected with the predicted fallout in each facility. "

James Webb Space Telescope, contamination, cleanro↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

The Meteoroid Environment Encountered By the James Webb Space Telescope

All spacecraft run the risk of being damaged by meteoroids at a rate proportional to the spacecraft's surface area. The exceptionally large James Webb Space Telescope (JWST) has endured 20 impacts on its primary mirror in its first year of operation. While most of the impacts experienced were commensurate with pre-launch predictions, one particularly large impact in May 2022 prompted the program to take a fresh look at the meteoroid environment in order to determine whether potentially unaccounted-for meteoroid risks can be mitigated. In this talk, we present a directional model of the meteoroid environment encountered by the spacecraft and compare it with the observed impact rate. Because of JWST’s ability to measure nanometer-size changes to the primary mirror surface, our results indicate that meteoroids carrying as little as 1 Joule of kinetic energy can produce measurable effects. We also find that the impact rate is highest when JWST faces in the direction of orbital motion about the Sun. By implementing a "meteoroid avoidance zone" that discourages observations within 75° of the ram direction, we estimate that JWST has reduced the impact rate by more than half.

Althea Moorhead↗

Performance of Dispersed Fringe Sensor in the Presence of Segmented Mirror Aberrations: Modeling and Simulation

Dispersed Fringe Sensing (DFS) is an efficient and robust method for coarse phasing of a segmented primary mirror such as the James Webb Space Telescope (JWST). In this paper, modeling and simulations are used to study the effect of segmented mirror aberrations on the fringe image, DFS signals and DFS detection accuracy. The study has shown due to the pixilation spatial filter effect from DFS signal extraction the effect of wavefront error is reduced and DFS algorithm will be more robust against wavefront aberration by using multi-trace DFS approach. We also studied the JWST Dispersed Hartmann Sensor (DHS) performance in presence of wavefront aberrations caused by the gravity sag and we use the scaled gravity sag to explore the JWST DHS performance relationship with the level of the wavefront aberration. This also includes the effect from line-of-sight jitter.

segmented mirrors↗