Search NASA⌕ Search

SEARCH · Search NASA

Results for “lunar rover”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The VIPER Mission, a Resource-Mapping Mission on Another Celestial Body

The Volatiles Investigation Polar Exploration Rover (VIPER) mission is a lunar polar volatiles prospecting mission developed through NASA’s Science Mission Directorate (SMD) Planetary Science Division with launch in late 2023. VIPER’s mission goals are to (1) characterize the distribution and physical state of lunar polar water and other volatiles in lunar cold traps and regolith and (2)provide the data necessary for NASA to evaluate potential return of In-Situ Resource Utilization (ISRU) from lunar polar regions. VIPER will be optimized for lunar regions that receive prolonged periods of sunlight (short lunar nights). The mission duration will be more than 90 Earth days and result in a traverse distance of up to 20 km. The mission includes a rover-borne payload that can locate surface and near-subsurface volatiles, excavate, and analyze samples of the volatile-bearing regolith, and demonstrate the form, extractability, and usefulness of the materials.

The Volatiles Investigation Polar Exploration Rove↗

Unmanned surface traverses of Mars and Moon: Science objectives, payloads, operations

Science objectives and properties to be measured are outlined for long surface traverse missions on Mars and the Moon, with remotely-controlled roving vehicles. A series of candidate rover payloads is proposed for each planet, varying in weight, cost, purpose, and development needed. The smallest weighs 35 kg; the largest almost 300 kg. A high degree of internal control will be needed on the Mars rover, including the ability to carry out complex science sequences. Decision-making by humans in the Mars mission includes supervisory control of rover operations and selection of features and samples of geological and biological interest. For the lunar mission, less control on the rover and more on earth is appropriate. Science portions of the rover mission profile are outlined, with timelines and mileage breakdowns. Operational problem areas for Mars include control, communications, data storage, night operations, and the mission operations system. For the moon, science data storage on the rover would be unnecessary and control much simpler.

Jaffe, L. D.↗

Launch Lock Mechanism for Resource Prospector Rover

The Resource Prospector Rover is being designed to carry the RESOLVE (Regolith Environment Science, and Oxygen Lunar Volatile Extraction) payload on a mission to the Moon to prospect for water ice. This is a joint project between KSC Swamp Works UB-R1 and JSC. JSC is building the Resource Prospector 2015 (RP15) rover and KSC designed and fabricated a Launch-Lock (LL) hold down mechanism for the rover. The LL mechanism will attach and support the rover on a Lunar Lander during launch and transit to the moon, then release the RP15 rover after touchdown on the lunar surface. This report presents the design and development of the LL mechanism and its unique features which make it suitable for this lunar exploration mission. An EDU (engineering development unit) prototype of the LL has been built and tested at KSC which is the subject of this paper.

Lunar Lander↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗

Planetary rover technology development requirements

Planetary surface (including lunar) mobility and sampling capability is required to support proposed future National Aeronautics and Space Administration (NASA) solar system exploration missions. The NASA Office of Aeronautics and Space Technology (OAST) is addressing some of these technology needs in its base research and development program, the Civil Space Technology Initiative (CSTI) and a new technology initiative entitled Pathfinder. The Pathfinder Planetary Rover (PPR) and Sample Acquisition, Analysis and Preservation (SAAP) programs will develop and validate the technologies needed to enable both robotic and piloted rovers on various planetary surfaces. The technology requirements for a planetary roving vehicle and the development plans of the PPR and SAAP programs are discussed.

Bedard, Roger J., Jr.↗

History and Flight Devleopment of the Electrodynamic Dust Shield

The surfaces of the moon, Mars, and that of some asteroids are covered with a layer of dust that may hinder robotic and human exploration missions. During the Apollo missions, for example, lunar dust caused a number of issues including vision obscuration, false instrument readings, contamination, and elevated temperatures. In fact, some equipment neared failure after only 75 hours on the lunar surface due to effects of lunar dust. NASA's Kennedy Space Center has developed an active technology to remove dust from surfaces during exploration missions. The Electrodynamic Dust Shield (EDS), which consists of a series of embedded electrodes in a high dielectric strength substrate, uses a low power, low frequency signal that produces an electric field wave that travels across the surface. This non-uniform electric field generates dielectrophoretic and electrostatic forces capable of moving dust out of these surfaces. Implementations of the EDS have been developed for solar radiators, optical systems, camera lenses, visors, windows, thermal radiators, and fabrics The EDS implementation for transparent applications (solar panels, optical systems, windows, etc.) uses transparent indium tin oxide electrodes on glass or transparent lm. Extensive testing was performed in a roughly simulated lunar environment (one-sixth gravity at 1 mPa atmospheric pressure) with lunar simulant dust. EDS panels over solar radiators showed dust removal that restored solar panel output reaching values very close to their initial output. EDS implementations for thermal radiator protection (metallic spacecraft surfaces with white thermal paint and reflective films) were also extensively tested at similar high vacuum conditions. Reflectance spectra for these types of implementations showed dust removal efficiencies in the 96% to 99% range. These tests indicate that the EDS technology is now at a Technology Readiness Level of 4 to 5. As part of EDS development, a flight version is being prepared for several flight opportunities. The flight version of the EDS will incorporate significantly smaller electronics, with an expected mass and volume of 500 g and 350 cm(exp. 3) respectively. One of the opportunities is an International Space Station (ISS) experiment: Materials for International Space Station Experiment 10 (MISSE-10). This experiment aims to verify the EDS can withstand the harsh environment of space and will look to closely replicate the solar environment experienced on the moon. A second flight opportunity exists to provide an EDS to several companies as part of NASA's Lunar CATALYST program. The current mission concept would fly the EDS on the footpad of one of the Lunar CATALYST vehicles. Dust will likely deposit on the footpad through normal surface rover activities, but also upon landing where lunar dust is expected to be uplifted. To analyze the e effectiveness of the EDS system, photographs of the footpad with one of the spacecrafts onboard cameras are anticipated. If successful in these test flights, the EDS technology will be ready to be used in the protection of actual mission equipment for future NASA and commercial missions to the moon, asteroids, and Mars.

Lunar↗

Navigation on the Line: Traversability Analysis and Path Planning for Extreme-Terrain Rappelling Rovers

Many areas of scientific interest in planetaryexploration, such as lunar pits, icy-moon crevasses, and Martiancraters, are inaccessible to current wheeled rovers. Rappellingrovers can safely traverse these steep surfaces, but requiretechniques to navigate their complex terrain. This dynamicnavigation is inherently time-critical and communication constraints(e.g. delays and small communication windows) willrequire planetary systems to have some autonomy.Autonomous navigation for Martian rovers is well studiedon moderately sloped and locally planar surfaces, but thesemethods do not readily transfer to tethered systems in nonplanar3D environments. Rappelling rovers in these situationshave additional challenges, including terrain-tether interactionand its effects on rover stability, path planning and control.This paper presents novel traversability analysis and pathplanning algorithms for rappelling rovers operating on steepterrains that account for terrain-tether interaction and theunique stability and reachability constraints of a rapellingsystem. The system is evaluated with a series of simulations andan analogue mission. In simulation, the planner was shown toreliably find safe paths down a 55 degree slope when a stabletether-terrain configuration exists and never recommended anunsafe path when one did not. In a planetary analogue mission,elements of the system were used to autonomously navigateAxel, a JPL rappelling rover, down a 30 degree slope with95% autonomy by distance travelled over 46 meters.

Nesnas, Issa↗

Autonomous Lunar Solar Array (ALSA) 2018: Big Idea Challenge Interns

NASA has aimed its sights towards sending humans back to the moon to develop and test technologies needed for future deep space exploration. Permanent power generation structures will play a key role in establishing habitat and in-situ resource utilization (ISRU) structures. Our group, part of the NASA Big Idea Challenge, came up with a concept for a solar array large enough to power a habitat, ISRU activities, and rover exploration in permanently shadowed lunar craters at the lunar poles.

McNatt, Jeremiah↗

VIPER: Systems Integration Status

NASA’s Artemis Program plans to return humans to the Moon for an extended stay. To do so will require substantial resources to sustain that continued human presence, including continuous supplies delivered from the Earth. Given the expense and complexity of resource deliveries from Earth, if some resources were indigenously available, substantial logistical savings could be available by “living off the land”, wherever possible. The LCROSS[1] , LRO and other missions have confirmed the presence of resources such as water-ice and other volatiles in lunar polar regions, so the next step is to understand the scientific nature and physical distribution of those candidate resources. Those local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss the latest systems-level integration activities by the VIPER team, following our initial introduction to this mission at IAC2021[2] . The VIPER team successfully passed its Systems Integration Review (SIR) in late-2022, and in early 2023, began system-level surface segment (rover) flight hardware assembly. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model with partner, Astrobotic, Inc.

VIPER↗

A Dual Launch Robotic and Human Lunar Mission Architecture

This paper describes a comprehensive lunar exploration architecture developed by Marshall Space Flight Center's Advanced Concepts Office that features a science-based surface exploration strategy and a transportation architecture that uses two launches of a heavy lift launch vehicle to deliver human and robotic mission systems to the moon. The principal advantage of the dual launch lunar mission strategy is the reduced cost and risk resulting from the development of just one launch vehicle system. The dual launch lunar mission architecture may also enhance opportunities for commercial and international partnerships by using expendable launch vehicle services for robotic missions or development of surface exploration elements. Furthermore, this architecture is particularly suited to the integration of robotic and human exploration to maximize science return. For surface operations, an innovative dual-mode rover is presented that is capable of performing robotic science exploration as well as transporting human crew conducting surface exploration. The dual-mode rover can be deployed to the lunar surface to perform precursor science activities, collect samples, scout potential crew landing sites, and meet the crew at a designated landing site. With this approach, the crew is able to evaluate the robotically collected samples to select the best samples for return to Earth to maximize the scientific value. The rovers can continue robotic exploration after the crew leaves the lunar surface. The transportation system for the dual launch mission architecture uses a lunar-orbit-rendezvous strategy. Two heavy lift launch vehicles depart from Earth within a six hour period to transport the lunar lander and crew elements separately to lunar orbit. In lunar orbit, the crew transfer vehicle docks with the lander and the crew boards the lander for descent to the surface. After the surface mission, the crew returns to the orbiting transfer vehicle for the return to the Earth. This paper describes a complete transportation architecture including the analysis of transportation element options and sensitivities including: transportation element mass to surface landed mass; lander propellant options; and mission crew size. Based on this analysis, initial design concepts for the launch vehicle, crew module and lunar lander are presented. The paper also describes how the dual launch lunar mission architecture would fit into a more general overarching human space exploration philosophy that would allow expanded application of mission transportation elements for missions beyond the Earth-moon realm.

Jones, David L.↗

To the moon: Faster, cheaper - and better

Three lunar missions lasting three years are described that make up the exploratory mapping phase of the Space Exploration Initiative. The three phases are: (1) a polar-orbiting satellite to map surface chemistry and mineralogy; (2) an orbiter to map the lunar terrain and gravity field; and (3) on-site investigation by means of rovers and remote-sensing instruments. The lunar mapping scenario relies on robotics technologies and is expected to cost 100-150 million dollars per phase and to require no more than three years.

Spudis, Paul D.↗

Compact Instrumentation for Experiments on the Lunar Surface

Increased opportunities to fly payloads on orbital, lander, and/or rover platforms will greatly facilitate the meeting of high priority goals for lunar exploration and lunar science, especially those requiring distributed measurements on multiple platforms to be fully realized. Compact, robust versions of instruments, designed to be integrated with a variety of platforms, or utilized in astronaut-deployed or handheld devices are already under development. These include cameras, spectrometers, particle analyzers, field instruments, and seismometers,

Clark, Pamela E.↗

Extended Duration: The SIRIUS 21 Crew Perspective

The SIRIUS (Scientific International Research In a Unique terrestrial Station) missions represent a collaborative effort between NASA and Russia’s Institute for Biomedical Problems (IBMP) to conduct a series of long duration isolation and confinement spaceflight analog missions. Three missions of 17-day, 4-month, and 8-month duration (SIRIUS 17, 19, and 21) have been completed at IBMP’s Ground-Based Experimental Complex / Nazemnyy eksperimental'nyy kompleks (NEK) in Moscow, Russia. The international SIRIUS 21 crew comprising representatives from the United States, United Arab Emirates and Russia recently completed the 8-month analog lunar mission. The extended duration mission included simulated lunar transit, orbital, and surface operations with corresponding deep space communication delay, during which the crew participated in nearly 70 studies, eight of which were sponsored by NASA’s Human Research Program. The studies examined the effect of isolation and confinement on the behavioral health of research subjects, and investigated medical countermeasures, team performance, crew dynamics, crew autonomy, food system risks, consequences of confinement and associated physiological stressors. SIRIUS 21 crewmembers also participated in operational tasks such as Rover and CubeSat assembly, simulated lunar sample assessment, VR activities, robotic arm training, environmental systems monitoring, exercise, greenhouse maintenance and 3D printing. Communication with Mission Control was limited to 30-minute periods every two hours. Since access to the internet and email was restricted, simulated ground support provided the Crew’s primary source of daily news and mission information. This panel discussion will include presentations from the US SIRIUS 21 crewmembers – William Brown and Ashley Kowalski – about their experience participating in the mission and science. A facilitated question and answer session will follow with attendees encouraged to ask questions and join in discussion with the SIRIUS 21 crewmembers about their experiences. William Brown came to SIRIUS 21 with experience spread across multiple industries, including the military, defense contracting, healthcare consulting, software engineering, and logistics. He has lived in the Middle East, Central Asia, and Russia. A former Boren Scholar, Brown is fluent in Russian. He holds a Master of International Business degree from the University of South Carolina’s Darla Moore School of Business. Prior to that, he earned a bachelor’s degree in Russian language, literature, and culture from the University of South Carolina. There, he also completed additional undergraduate coursework in computer science. Ashley Kowalski is a Project Leader in The Aerospace Corporation’s International Partnerships Department, where she works with, represents, and provides technical support to the the U.S. Space Force Space Systems Command International Affairs (SSC/IA) office. Through her numerous national and international assignments (Russia, China, and Germany), she has worked on topics related to international space systems, national security space systems, civil systems (including human spaceflight and civil launch projects), space policy, satellite industry analysis, and satellite manufacturing start-ups. She is proficient in Russian and German, and fluent in Polish. Kowalski received her Bachelor of Science and Master of Science degrees in mechanical and aerospace engineering from George Washington University in 2011 and 2012, respectively.

S. E. Whiting↗

Initial Testing Results and Forward Design Considerations for the Tri-Rotor Hand Controller

The Lunar Terrain Vehicle (LTV) is one of the key elements of NASA’s Artemis return to the Moon. As an unpressurized rover, the LTV hand controller must take into account the limitations of the spacesuit worn by the crew as well as lessons learned operating the Apollo Lunar Roving Vehicle and preliminary NASA simulations. Because the NASA Ground Test Unit (GTU) design features omnidirectional steering, NASA engineers developed the TriRotor is an innovation to minimize crew fatigue and discomfort. NASA conducted a series of tests, initially with 3D printed mockup controllers, and expanding to a functional prototype used in an LTV video wall simulation. The Tri-Rotor compared favorably with legacy Apollo T-Handles, though numerous test subject comments were collected to improve the controller’s usability. Several options to improve the Tri-Rotor’s usability are also discussed, along with opportunities to test the Tri-Rotor in Virtual Reality, a motion table, and in field analogs.

Hand Controller↗

Inhalation Toxicity of Ground Lunar Dust Prepared from Apollo-14 Soil

Within the decade one or more space-faring nations intend to return humans to the moon for more in depth exploration of the lunar surface and subsurface than was conducted during the Apollo days. The lunar surface is blanketed with fine dust, much of it in the respirable size range (<10 micron). Eventually, there is likely to be a habitable base and rovers available to reach distant targets for sample acquisition. Despite designs that could minimize the entry of dust into habitats and rovers, it is reasonable to expect lunar dust to pollute both as operations progress. Apollo astronauts were exposed briefly to dust at nuisance levels, but stays of up to 6 months on the lunar surface are envisioned. Will repeated episodic exposures to lunar dust present a health hazard to those engaged in lunar exploration? Using rats exposed to lunar dust by nose-only inhalation, we set out to investigate that question.

James, John T.↗

Manufacture of Solar Cells on the Moon

In support of the space exploration initiative a new architecture for the production of solar cells on the lunar surface is devised. The paper discusses experimental data on the fabrication and properties of lunar glass substrates, evaporated lunar regolith thin film (antireflect coatings and insulators), and preliminary attempts in the fabrication of thin film (silicon/II-VI) photovoltaic materials on lunar regolith substrates. A conceptual design for a solar powered robotic rover capable of fabricating solar cells directly on the lunar surface is provided. Technical challenges in the development of such a facility and strategies to alleviate perceived difficulties are discussed. Finally, preliminary cost benefit ratio analysis for different in situ solar cell production scenarios (using exclusively in-situ planetary resources or hybrid) are discussed.

Freundich, Alex↗