Search NASA⌕ Search

SEARCH · Search NASA

Results for “project documentation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Aeroelastic Modeling for Distributed Wind Turbines: March 11, 2021 - November 10, 2021

Aeroelastic modeling (AM) is the primary methodology for structural and performance assessment of any wind turbine whereby providing an understanding of the impact of design parameters on its loading and power response before witnessing it in the field. Despite these advantages, the use of AM in the Distributed Wind Technology (DWT) sector is limited, especially within the less established manufacturers. This project represents an in-depth assessment of the status of AM and its role within the Standards for the DWT industry. The study gathered input and feedback from a large number of national and international stakeholders, reviewed technical strengths and weaknesses of the current edition of the design standards, analyzed recent industry workshops' and meetings' minutes, collected publicly available AM templates, and provided an evaluation of the existing AM codes. The study achieved several goals including providing strategies for the load assessment categorization of turbines based on rotor swept area and archetype, and guidance for AM verification and validation (V&V), which includes discussions of measurement requirements and a sample test-plan useful for future V&V campaigns and design standard development. This document summarizes the different tasks conducted in the course of the project and highlights the steps required to improve the AM adoption based on a multifaceted approach that encompasses: 1) augmenting AM software capabilities, 2) publishing AM best-practices and design-basis, 3) creating new model templates, 4) providing guidance for V&V of codes and specific turbine models leveraging field testing best-practice, and 5) addressing weaknesses in the current standards. Many of the future objectives identified in this study could leverage NREL's upcoming testing campaigns of three modern distributed wind turbines. Recommendations within this study will advance the value and the ease-of-use of AM, thereby allowing the industry to better capitalize this underutilized tool resulting in a more efficient design process, an easier path to certification, and overall better and more distributed reliable wind turbine products.

17 WIND ENERGY↗

ComStock Measure Documentation: High-Efficiency Rooftop Unit

Building on the 3-year End-Use Load Profiles project to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models, this work produces national data sets that enable cities, states, utilities, and other stakeholders to answer a broad range of questions regarding their commercial building stock. ComStock is a highly granular, bottom-up model that uses various data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The "baseline" model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology of the baseline model is discussed in the ComStock Reference Documentation. The goal of this work is to develop energy efficiency and demand flexibility measures that cover market-ready technologies and study their mass adoption impact on the baseline building stock. "Measures" refers to various "what-if" scenarios that can be applied to buildings. The results for the baseline and measure scenario simulations are published in public data sets that provide insights into building stock characteristics, operational behaviors, utility bill impacts, and annual and sub-hourly energy usage by fuel type and end use. This report describes the modeling methodology for a single ComStock measure scenario - high-efficiency rooftop unit (RTU) - and briefly introduces key results. The full public data set can be accessed on the Comstock data lake or via the Data Viewer at comstock.nlr.gov. The public data set enables users to create custom aggregations of results for their use case (e.g., filter to a specific county or building type).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Economic Analysis of Changes in Hydropower Operations at the Flaming Gorge Dam and the Aspinall Unit Due to the Upper Colorado River Endangered Fish Recovery Program

This report was prepared by Argonne National Laboratory (Argonne) in support of an economic analysis of operational restrictions at the Flaming Gorge Dam (FG) and the Aspinall Unit conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA). WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. This report presents detailed findings of an economic analysis of operational restrictions implemented at FG during water years (WYs) 2001 to 2016, and at the Aspinall Cascade during WYs 2013 to 2016. Staff members of Argonne’s Energy Systems Division prepared this document with assistance from staff members of WAPA’s Colorado River Storage Project (CRSP) Management Center and Reclamation, Upper Colorado Region.

13 HYDRO ENERGY↗

Better bang for your buck? Comparing savings realization from ESPCs and direct-funded projects

Energy savings performance contracts (ESPCs) offer an opportunity to tremendously scale decarbonization projects, given their paid-from-savings premise. However, prospective customers still question whether ESPC is worth the effort and expense. This study evaluates the savings realization rates of ESPCs compared to direct-funded projects using ENERGY STAR Portfolio Manager (ESPM) benchmarking data. It compares normalized EUIs from ESPM before and after energy conservation projects implemented via ESPC or direct funding in roughly 450 federal buildings. This documented change, ideally a savings, can then be compared to the estimated savings from the energy conservation initiative in order to generate a rough realization rate. Preliminary results indicate a notably greater savings realization rate for the ESPC buildings (median = 105% of estimated savings) than those that underwent direct-funded projects (median = 46%). Because of a shortage of good quality data and the wide range in results, the difference is only significant at the p < 0.20 level. However, the higher savings realization of ESPCs corroborates the authors’ 2014 findings using a different comparison method. With continued soft government funding and regulatory impediments for climate change mitigation in the U.S., financed, paid-from-savings project models (e.g., ESPC, PACE, EaaS and others) certainly merit more attention. This study’s results are particularly compelling (and encouraging) given the country’s likely reliance on these vehicles to address existing building retrofits.

Earni, Shankar↗

Requalification and Declaration of High-alpha Cemented TRU-waste from the Late 70's and Early 80's - 20499

KTE and Siemens launched a project to qualify a series of 391 waste drums and 115 concrete containers produced from 1979 to 1984. The waste is characterized by a high content of long-lived alpha-nuclides (TRU-waste - Pu, U, Am in the range of 1 E+11-1 E+12 Bq/ drum. This high radionuclide inventory requires a special packaging according to the waste acceptance criteria (WAC) of the repository Konrad [1] despite the fact, that the waste was treated manually. The raw waste originally was delivered in nitric acid solution and was solidified using ordinary Portland cement. The existing documentation comprises analyses, transfer documentation for the nuclear fuel nuclides and waste treatment documentation yielding information, which waste was treated together in a batch. Additionally all drums were subjected to non-destructive gamma-spectrometry assay. A small number of 7 drums were opened and sampled to support the existing declaration. For the entire series the waste products were attributed to defined batches using the accountancy data supported by the analyses and the gamma-spectrometry. Each batch was produced from a homogeneous stock of waste solution and can therefore be declared and documented together. The declaration concept is based on the gamma spectrometry results performed on the entire drums, which were corrected and extended for the uncertainty of the analyses. The declaration concept is verified by the regulator and its independent expert. The state of the project is in the documentation of the solidification campaigns followed by the planning of the container configuration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2024 Buildings Technology Baseline: Dataset Documentation

The Buildings Technology Baseline is a curated and regularly updated dataset of current and projected performance, retail, and installed price data for all major building energy technologies needed to enable cost/benefit analyses. Building technology analyses require an up-to-date understanding of installation costs and cost-effectiveness of key building energy efficiency technologies. The dataset was assembled by Guidehouse during fiscal year 2024. Data was gathered from the 2024 National Residential Efficiency Measures Database (NREMDB), the 2023 Energy Information Administration Updated Buildings Sector Appliance and Equipment Costs and Efficiencies ("EIA Building Data Report"), DOE Lighting Market Model, the 2023 RSMeans database, and the 2020 Grid-Interactive Efficient Building Technology Cost, Performance, and Lifetime Characteristics ("GEB Data Report"), Lawrence Berkeley National Laboratory, various literature, as well as new data from online retailers, stakeholder interviews, and contractor databases in 2023 and 2024. The dataset has been reviewed by subject matter experts at NREL and DOE. The 2024 dataset release is intended to be a starting point for interested users to provide feedback. This database is not intended to provide specific cost estimates for a specific project. The cost estimates do not include any rebates or tax incentives that may be available for the measures. Rather, it is meant to help determine which measures may be more cost-effective. The National Renewable Energy Laboratory (NREL) makes every effort to ensure accuracy of the data; however, NREL does not assume any legal liability or responsibility for the accuracy or completeness of the information.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Closeout Report of BNL LDRD 23-050 A Second EIC Detector: Physics Case and Conceptual Design

This document is the closeout report for LDRD 23-050, a type-A LDRD project awarded in FY2022 under the title “ A Second EIC Detector: Physics Case and Conceptual Design ”. The project was motivated by the strong interest within the EIC community in a second general-purpose detector and interaction region, and by the recognition that such a detector is essential to fully exploit the scientific potential of the EIC over its multi-decade lifetime. The key goals of the LDRD were to (i) strengthen the case for a second EIC detector, building on the arguments already articulated in the community Yellow Report, (ii) provide a realistic detector concept that is complementary to the current project detector, ePIC, in terms of physics reach, precision, and control of systematics, and (iii) broaden the overall physics program of the EIC facility. Since a possible second detector is expected to be realized with a delay of several years relative to the first detector, the project explicitly aimed at identifying technologies that are not yet sufficiently mature for ePIC but could be deployed on the later timescale of a second detector, thereby providing genuine complementarity and room for innovation. LDRD 23-050 provided support for two postdoctoral researchers and partial support for several BNL staff members, and the effort ramped up in mid-2023. Work was carried out in close collaboration with colleagues from the EIC project, the Cold QCD and STAR groups at BNL, and with substantial input from members of the EIC User Group and the ePIC Collaboration as reflected in the author list. Over the period from October 2022 through September 2025, this team developed and refined a physics program tailored to a second detector, translated the resulting physics requirements into detector-level performance targets, and explored multiple conceptual detector layouts capable of meeting these targets within the constraints of the second interaction region. The expected outcome, as stated in the original proposal, was a document detailing the physics potential and requirements of a second EIC detector, accompanied by a comprehensive conceptual detector design and an outline of the remaining R&D needed to bring the relevant technologies to maturity. The present report summarizes the progress that has been achieved toward these goals. It consolidates the physics studies, detector concepts, and technology assessments developed under this LDRD and places them in the broader context of worldwide detector R&D. While the evolving priorities of the EIC project and the substantial community effort required to design and construct ePIC naturally limited the scope of EIC-wide activities toward a second detector during this period, the work documented here is intended to provide a foundation and a point of reference for future efforts. Whatever form a second EIC detector may ultimately take, we hope that this report will serve as a useful guide for colleagues who continue to advance this program in the near- and mid-term future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The physics case of a 3 TeV muon collider stage

In the path towards a muon collider with center of mass energy of 10 TeV or more, a stage at 3 TeV emerges as an appealing option. Reviewing the physics potential of such muon collider is the main purpose of this document. In order to outline the progression of the physics performances across the stages, a few sensitivity projections for higher energy are also presented. There are many opportunities for probing new physics at a 3 TeV muon collider. Some of them are in common with the extensively documented physics case of the CLIC 3 TeV energy stage, and include measuring the Higgs trilinear coupling and testing the possible composite nature of the Higgs boson and of the top quark at the 20 TeV scale. Other opportunities are unique of a 3 TeV muon collider, and stem from the fact that muons are collided rather than electrons. This is exemplified by studying the potential to explore the microscopic origin of the current $g$-2 and $B$-physics anomalies, which are both related with muons.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

2.3.3.01- xSDK-Multiprecision Quarterly Report for Subcontract Partner KIT

In collaboration with the project partners, the subcontractor conducted the multiprecision landscape survey. Following the survey, the subcontractor orchestrated the processing of the survey findings in the “Multiprecision Landscape Assessment” (attached to this quarterly report) and published the document as a preprint. Furthermore, the team initiated the process of publishing the survey results in a compressed form as a scientific paper. The subcontractor also conducted research on the accessor design, created a prototype implementation, and delivered an “Accessor Design Document” (attached to this quarterly report). Furthermore, the subcontractor organized bi-weekly meetings of all project participants to encourage scientific discussions and collaboration.

97 MATHEMATICS AND COMPUTING↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Algal Biomass Production via Open Pond Algae Farm Cultivation: 2019 State of Technology and Future Research

NREL’s algae state of technology benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL’s “combined algae processing” (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) consortium efforts, driven by data furnished by Arizona State University (ASU) at the Arizona Center for Algae Technology and Innovation (AzCATI) testbed site. The CAP model is based on experimental efforts conducted under NREL R&D projects. This report focuses on front-end algal biomass production, documenting the pertinent algal biomass cultivation parameters that were input to the NREL open pond algae farm model and reports on key process sustainability indicators for the biomass production stage including annual biomass yields, facility power demand, and water consumption.

09 BIOMASS FUELS↗

Algal Biomass Production via Open Pond Algae Farm Cultivation: 2020 State of Technology and Future Research

The annual State of Technology (SOT) assessment is an essential activity for platform research conducted under the Bioenergy Technologies Office. It allows for the impact of research progress to be quantified in terms of economic improvements in the overall biofuel production process for a particular biomass processing pathway, whether based on terrestrial or algal biomass feedstocks. As such, initial benchmarks can be established for currently demonstrated performance, and progress can be tracked towards out-year goals to ultimately demonstrate economically viable biofuel technologies. NREL's algae state of technology benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL's "combined algae processing" (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) consortium efforts, driven by data furnished by Arizona State University (ASU) at the Arizona Center for Algae Technology and Innovation (AzCATI) testbed site. The CAP model is based on experimental efforts conducted under NREL research and development projects. This report focuses on front-end algal biomass production, documenting the pertinent algal biomass cultivation parameters that were input to the NREL open pond algae farm model based on the latest DISCOVR cultivation performance data. Relative to prior 2019 benchmarks, the 2020 algae farm SOT achieved further reductions in modeled minimum biomass selling price of approximately $70/ton (roughly 10%), primarily attributable to a 16% demonstrated improvement in annual average cultivation productivity rates.

09 BIOMASS FUELS↗

Leading in Los Angeles: Demonstrating scalable emerging energy efficient technologies for integrated façade, lighting, and plug loads INTER System FLEXLAB Test Report

This report is a part of the California Energy Commission (Energy Commission) EPIC study Leading in Los Angeles: Demonstrating scalable emerging energy efficient technologies for integrated façade, lighting, and HVAC. The set of technologies are called the Integrated Technologies for Energy-efficient Retrofits (INTER) and are comprised of automated shading products and LED lighting systems with networked luminaire-level sensors and controls. In addition, the project will include control modifications and assessments of HVAC savings. This document includes the test plan and test results for the FLEXLAB® testing of the shading and lighting INTER system and related energy use impact. The test plan describes the test objectives and features, test cases, schedule, and measurements. The test results cover system performance in the lab; including lighting and HVAC energy, visual comfort, and thermal comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Freight Analysis Framework Version 5 (FAF5) Base Year 2017 Data Development Technical Report

The Freight Analysis Framework (FAF) integrates data from a variety of sources to create a comprehensive national picture of freight movements among states and major metropolitan areas by all modes of transportation. The latest of this data series is FAF5, which is the fifth generation FAF and is benchmarked on Commodity Flow Survey (CFS) 2017. Except for FAF1 that provided estimates for truck, rail, and water tonnage for calendar year 1998, later generations of FAF (FAF2 through FAF5) were built based on their benchmark year CFS data, for 2002, 2007, 2012, and 2017 respectively. The FAF is produced under a partnership between Bureau of Transportation Statistics (BTS) and Federal Highway Administration (FHWA). As a major data product of the FAF program, the FAF regional database provides a national picture of freight flows to, from, and within the United States (among regions and states), by commodity and mode for the base year, as well as for forecasts up to 30 years into the future in a 5-year interval. Additional FAF data products also include FAF network flows database, where truck movements are routed onto the national highway network, estimates of annual projections, and synchronized historical data series. This report is a technical document prepared to describe the data sources and methodologies applied in the process of building the FAF5 base-year 2017 regional database, released as FAF5.0 in February 2021. This report offers a description of the diverse data sources and modeling methods used in constructing the base year FAF5 regional database. The FAF5 base-year database is used as the base for development of forecasts and for assignment of truck flows on highway network. Similarly, the FAF5 base-year database will be used as the base to generate FAF5 annual estimates. In addition to this report, users are encouraged to refer to the FAF5 User’s Guide, which provides basic information of the data, including definitions of the data attributes, information on how to access the data and tool, as well as detailed data dictionary and code tables.

42 ENGINEERING↗

Algal Biomass Production via Open Pond Algae Farm Cultivation: 2021 State of Technology and Future Research

The annual State of Technology (SOT) assessment is an essential activity for platform research conducted under the Bioenergy Technologies Office. It allows for the impact of research progress to be quantified in terms of economic improvements in the overall biofuel production process for a particular biomass processing pathway, whether based on terrestrial or algal biomass feedstocks. As such, initial benchmarks can be established for currently demonstrated performance, and progress can be tracked towards out-year goals to ultimately demonstrate economically viable biofuel technologies. NREL's algae state of technology benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL's "combined algae processing" (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) consortium efforts, driven by data furnished by Arizona State University (ASU) at the Arizona Center for Algae Technology and Innovation (AzCATI) testbed site. The CAP model is based on experimental efforts conducted under NREL research and development projects. This report focuses on front-end algal biomass production, documenting the pertinent algal biomass cultivation parameters that were input to the NREL open pond algae farm model based on the latest DISCOVR cultivation performance data. Relative to the fiscal year (FY) 2020 SOT at $683/ton or $603/ton for ASU and FA evaporation scenarios, respectively (unlined pond basis), the FY 2021 SOT represents a slight increase in MBSP of 1%-2%. This is primarily attributed to a slight 4% reduction in annual cultivation productivity achieved at the AzCATI site (supported by the efforts under the DISCOVR consortium noted above) observed during FY 2021 cultivation campaigns.

09 BIOMASS FUELS↗