Search NASA⌕ Search

SEARCH · Search NASA

Results for “proton beam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Conceptual Design of a 20 T Hybrid Cos-Theta Dipole Superconducting Magnet for Future High-Energy Particle Accelerators

High energy physics research will need more and more powerful circular accelerators in the next decades. It is therefore desirable to have dipole magnets able to produce the largest possible magnetic field, in order to keep the machine diameter within a reasonable size. A 20 T dipole is considered a desired achievement since it would allow the construction of an 80 km machine, able to circulate 100 TeV proton beams. In order to reach 20 T, a hybrid Low-Temperature Superconductor (LTS) - High-Temperature Superconductor (HTS) magnet is needed, since LTS technology is presently limited to ~16 T for accelerator magnet applications. In this paper, we present the design of a 6 layers 20 T hybrid dipole magnet using Nb 3 Sn (LTS) and Bi2212 (HTS). Here we show that it is possible to achieve this magnetic field with accelerator field quality, with sufficient margin on a realistic conductor, keeping the stresses within safe limit, avoiding conductor degradation.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

ORBUMP Pulsed Dipole Magnet Design for Fermilab Booster

Fermilab initiated the accelerator magnet system upgrade project PIP-II for future neutrino experiments. Old ORBUMP pulsed dipoles should be replaced with new stronger magnets occupying the same space as old ones. Four of these magnets connected in series form dogleg type of proton beam orbit. The magnet field and 19 kA current pulse length are close to 1 ms. Old magnet cores were based on a ferrite material. For new magnets, a magnet gap field is above 0.4 T, which completely saturates ferrite material. So, for the magnet core, 0.127 mm thick laminations of low carbon steel with inorganic coating, as the magnet were placed in a vacuum box. There were investigated transient magnet parameters including skin effect in the iron core and in the single-turn copper coil. The integrated field homogeneity was improved by the copper coil shimming. Simulated by OPERA3D power losses were used for the thermal analysis by ANSYS code. The magnet performance is strongly coupled with the power source. The dynamic magnet inductance and resistance were included in the pulsed power source design. Finally, the paper presented the ORBUMP magnet system design.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗

Measurement of 139 La(p,x) cross sections from 35–60 MeV by stacked-target activation

A stacked-target of natural lanthanum foils (99.9119% 139 La) was irradiated using a 60 MeV proton beam at the LBNL 88-Inch Cyclotron. 139 La(p,x) cross sections are reported between 35–60 MeV for nine product radionuclides. The primary motivation for this measurement was the need to quantify the production of 134 Ce. As a positron-emitting analogue of the promising medical radionuclide 225 Ac, 134 Ce is desirable for in vivo applications of bio-distribution assays for this emerging radio-pharmaceutical. Finally, the results of this measurement were compared to the nuclear model codes TALYS, EMPIRE and ALICE (using default parameters), which showed significant deviation from the measured values.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Measurement of $\phi $ meson production in $p + p$ interactions at 40, 80 and $158 \, \hbox {GeV}/c$ with the NA61/SHINE spectrometer at the CERN SPS

Results on $\phi$ meson production in inelastic p+p collisions at CERN SPS energies are presented. They are derived from data collected by the NA61/SHINE fixed target experiment, by means of invariant mass spectra fits in the $\phi \to K^+K^-$ decay channel. They include the first ever measured double differential spectra of $\phi$ mesons as a function of rapidity $y$ and transverse momentum $p_T$ for proton beam momenta of 80 GeV/c and 158 GeV/c, as well as single differential spectra of $y$ or $p_T$ for beam momentum of 40 GeV/c. The corresponding total $\phi$ yields per inelastic p+p event are obtained. These results are compared with existing data on $\phi$ meson production in p+p collisions. The comparison shows consistency but superior accuracy of the present measurements. The emission of $\phi$ mesons in p+p reactions is confronted with that occurring in Pb+Pb collisions, and the experimental results are compared with model predictions. It appears that none of the considered models can properly describe all the experimental observables.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Prospects for beyond the Standard Model physics searches at the Deep Underground Neutrino Experiment: DUNE Collaboration

Abstract The Deep Underground Neutrino Experiment (DUNE) will be a powerful tool for a variety of physics topics. The high-intensity proton beams provide a large neutrino flux, sampled by a near detector system consisting of a combination of capable precision detectors, and by the massive far detector system located deep underground. This configuration sets up DUNE as a machine for discovery, as it enables opportunities not only to perform precision neutrino measurements that may uncover deviations from the present three-flavor mixing paradigm, but also to discover new particles and unveil new interactions and symmetries beyond those predicted in the Standard Model (SM). Of the many potential beyond the Standard Model (BSM) topics DUNE will probe, this paper presents a selection of studies quantifying DUNE’s sensitivities to sterile neutrino mixing, heavy neutral leptons, non-standard interactions, CPT symmetry violation, Lorentz invariance violation, neutrino trident production, dark matter from both beam induced and cosmogenic sources, baryon number violation, and other new physics topics that complement those at high-energy colliders and significantly extend the present reach.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Shedding light on X17: community report

The workshop “Shedding light on X17” brings together scientists looking for the existence of a possible new light particle, often referred to as X17. This hypothetical particle can explain the resonant structure observed at ~ 17 MeV in the invariant mass of electron-positron pairs, produced after excitation of nuclei such as 8 Be and 4 He by means of proton beams at the Atomki Laboratory in Debrecen. The purpose of the workshop is to discuss implications of this anomaly, in particular theoretical interpretations as well as present and future experiments aiming at confirming the result and/or at providing experimental evidence for its interpretation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

IsoDAR@Yemilab: Preliminary design report—volume I (cyclotron driver)

This Preliminary Design Report (PDR) describes the IsoDAR electron-antineutrino source in two volumes which are mostly site-independent and describe the cyclotron driver providing a 10 mA/60 MeV proton beam (this Volume); and the medium energy beam transport line (MEBT) and target (Volume II). The IsoDAR driver and target will produce about 1.15 x 10 23 electron-antineutrinos over 5 years while operating with the anticipated 10 mA/60 MeV beam at an estimated 80% duty factor. Paired with a kton-scale liquid scintillator detector, it will enable a broad particle physics program including searches for new symmetries, new interactions and new particles. Here in Volume I, we describe the driver, which includes the ion source, low energy beam transport, and cyclotron. The latter features Radio-Frequency Quadrupole (RFQ) direct axial injection and represents the first accelerator purpose-built to make use of so-called vortex motion.

Winklehner, Daniel (ORCID:0000000207156310)↗

Decay Dose Shielding Analysis with Hybrid Unstructured Mesh/Constructive Solid Geometry Monte Carlo Calculation and ADVANTG Acceleration

The Oak Ridge National Laboratory (ORNL) Second Target Station (STS) neutron production facility is an accelerator driven pulsed neutron source that is currently being actively developed at ORNL. The neutrons are produced by proton-induced spallation reactions. A proton beam of 700 kW power is delivered to a spallation target in short, less than 1 µs long pulses, with 15 Hz repetition rate. The spallation target of ORNL STS is a rotating water-cooled tungsten target with tantalum cladding housed in a stainless-steel shroud. It is divided into 21 segments. These segments become highly activated due to spallation reactions or nuclei transmutation by the emitted neutrons. The radioactive nuclides continue to decay after ceasing operation. The decay dose rates generated from the target segments once they are removed from their operational location within the core vessel must be accurately quantified to determine the shielding configurations of remote handling tools and transport casks and to aid in planning maintenance events. To determine the shielding configurations needed for an activated target segment after ceasing operation, both the hybrid unstructured mesh (UM)/constructive solid geometry (CSG) approach that was previously utilized for STS analyses [1] and the ADVANTG code [2] were used. Even though the ADVANTG code does not include UM capability, the utilization of its advanced variance reduction technique was crucial to accelerate the extremely difficult final photon transport calculation in this analysis. This paper also describes the procedures taken to mitigate the convergence issues that occur when ADVANTG uses a source definition that does not match the source of the final Monte Carlo (MC) calculation. These convergence issues often occur because of inconsistencies between source and transport biasing parameters.

Ibrahim, Ahmad↗

Expected performance of the FOOT experiment

The main objective of the FOOT (FragmentatiOn of Target) experimentis to measure the double differential cross-sections with respect to the kineticenergy and the angle of emission of fragments produced in nuclear interactions withan accuracy of 5%. Measurements will use the inverse kinematics approach to studythe interaction of heavy ions with proton-rich targets and will be performed in twoenergy regions, one up to 400 MeV/u, to assess the effects of nuclear fragmentationin hadrontherapy treatment with proton beams, and up to 700 MeV/u, to improvethe knowledge of the fragmentation of ions on nuclei to help with the design of spacevehicles shielding.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A data-driven method to constrain the $\bar{p}$ background in Mu2e

The Mu2e experiment will search for the charged lepton flavour violating process of neutrinoless coherent muon to electron conversion in the field of an Al nucleus. The expected signal is a 104.97 MeV/c electron. One of the expected backgrounds is due to ¯ps produced by the proton beam at the Production Target and annihilating in the Stopping Target (ST). The background from ¯p annihilation is not a dominant one, but it has a large uncertainty and it cannot be suppressed by the timing cuts used to reduce the prompt background. However at Mu2e energies, p¯p annihilation is the only source of events with multiple simultaneous tracks coming from the ST. We exploit this unique feature and reconstruct the multi-track events to estimate the ¯p background.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluation of 186 WS 2 target material for production of high specific activity 186 Re via proton irradiation: separation, radiolabeling and recovery/recycling

Enriched tungsten disulfide ( 186 WS 2 ) was evaluated at increasing proton beam currents (20-50 µA) and times (up to 4 h) on a GE PETtrace cyclotron for production of high specific activity (HSA) 186 Re. The HSA 186 Re was separated from the irradiated target as [ 186 Re][ReO 4 ] - by a liquid-liquid extraction method and radiolabeled with a new N 2 S 2 ligand (222-MAMA-N-ethylpropionate). The enriched 186 W was recovered from the extraction process, analyzed for purity and enrichment, and converted back to the disulfide ( 186 WS 2 ). The results demonstrate that the 186 WS 2 is an easily pressed target material that can withstand relatively high currents and can be readily recovered and recycled. The 186 Re produced was isolated in high specific activity and readily formed the radiotracers [ 186 Re][ReO(222-MAMA-N ethylpropionate)] and [ 186 Re][Re(CO) 3 (OH 2 ) 3 ] + .

186Re,N2S2 ligand↗

A high-temperature Rutherford Backscattering Spectrometry apparatus for in situ material characterization

A new methodology for high-temperature Rutherford Backscattering Spectrometry (HT-RBS) has been developed to enable in situ material characterization at elevated temperatures. A 3.5 MeV proton beam penetrates a 10-µm-thick 316L stainless steel foil mounted on a graphite substrate, with backscattered signals detected using an HT-RBS system. Conventional semiconductor detectors, primarily based on silicon, suffer significant performance degradation at temperatures higher than ~ 60 °C due to increased leakage current and noise, leading to signal distortion and failure. Here, to preserve spectral quality, a 5 µm aluminum foil shields the detector from thermal radiation, allowing reliable operation up to 900 °C at the target. A rotatable shutter provides additional thermal isolation during data collection pauses. In situ measurements of areal density changes of 316L stainless steel were conducted to validate the technique, revealing consistency with the known thermal expansion coefficient. The method facilitates seamless switching between irradiation and analysis, enabling continuous studies. This approach supports in situ investigations of diffusion, void swelling, creep, and corrosion, offering a versatile tool for advanced materials research.

36 MATERIALS SCIENCE↗

Evolution of the high-power spallation neutron mercury target at the SNS

The Spallation Neutron Source (SNS) began operation in 2006 and first operated at its full 1.4 MW power in 2013. Targets, which receive the pulsed proton beam, were a limiting factor for reliable full power operation for several years. Reaching reliable target operation at 1.4 MW required not only changes to the target design but also support and coordination across the entire SNS enterprise. The history and some key lessons learned are presented.

Winder, Drew E↗

Proposal for a proton-bunch compression experiment at IOTA in the strong space-charge regime

The longitudinal compression of intense proton bunches with strong space-charge force is an essential component of a proton-based muon source for a muon collider. This paper discusses a proton-bunch compression experiment at the Integrable Optics Test Accelerator (IOTA) storage ring at Fermilab to explore optimal radio frequency (RF) cavity and lattice configurations. IOTA is a compact fixed-energy storage ring that can circulate a 2.5-MeV proton beam with varying beam parameters and lattice configurations. The study will aim to demonstrate a bunch-compression factor of at least 2 in the IOTA ring while examining the impact of intense space-charge effects on the compression process.

43 PARTICLE ACCELERATORS↗

Flattening the field during injection in the Fermilab booster using dipole corrector magnets

The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ~32 μsec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550 μs. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab

The Proton Power Upgrade (PPU) project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) currently being constructed will double the proton beam power capability from 1.4 to 2.8 MW by adding seven cryomodules, each containing four six-cell high-beta (β = 0.81) superconducting radio frequency cavities. Research Instruments, located in Germany, built and processed the cavities at the vendor site, including electropolishing as the final active chemistry step. Twenty-eight cavities for seven cryomodules and an additional four cavities for a spare cryomodules were delivered to Jefferson Lab and first qualification tests were completed on all cavities as received from the vendor. The performance largely exceeded the requirements on quality factor and accelerating gradient. Here we present the status of initial cavity qualification tests, rework on unqualified cavities and final cavity qualification with helium vessel prior to installation in cryomodules. In addition, an update on cryomodule production is presented.

Dhakal, P.↗