Search NASA⌕ Search

SEARCH · Search NASA

Results for “test system test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

OMEGA timing receiver, design and system test

The design of a two frequency OMEGA Timing Receiver is discussed. The receiver tracks the arrival time of the signals by precise phase matching at the receiving antenna. Provision is made for inserting a propagation delay correction for each signal path. Time is measured as the difference between the zero crossing coincidence of the corrected signals and the local time. This number is displayed on the front panel in microseconds. The receiver can also function as a precise phase tracking receiver for collection of propagation data essential to augmenting the propagation corrections. All phase and time information is made available in a BCD format for flexibility in interfacing with other equipment. Results of preliminary tests using experimental transmissions are given. Preliminary results indicate time may be transferred by this technique to an accuracy of a few microseconds.

Wilson, J. J.↗

System tests with electric thruster beam and accelerator directly powered from laboratory solar arrays

Laboratory high voltage solar arrays were operated directly connected to power the beam and accelerator loads of an 8-centimeter ion thruster. The beam array comprised conventional 2 by 2 centimeter solar cells; the accelerator array comprised multiple junction edge-illuminated solar cells. Conventional laboratory power supplies powered the thruster's other loads. Tests were made to evaluate thruster performance and to investigate possible electrical interactions between the solar arrays and the thruster. Thruster performance was the same as with conventional laboratory beam and accelerator power supplies. Most of the thruster beam short circuits that occurred during solar array operation were cleared spontaneously without automatic or manual intervention. No spontaneous clearing occurred during conventional power supply operation.

Stover, J. B.↗

Seminar on Understanding Digital Control and Analysis in Vibration Test Systems, part 2

A number of techniques for dealing with important technical aspects of the random vibration control problem are described. These include the generation of pseudo-random and true random noise, the control spectrum estimation problem, the accuracy/speed tradeoff, and control correction strategies. System hardware, the operator-system interface, safety features, and operational capabilities of sophisticated digital random vibration control systems are also discussed.

Source record↗

Photovoltaic system test facility electromagnetic interference measurements

Field strength measurements on a single row of panels indicates that the operational mode of the array as configured presents no radiated EMI problems. Only one relatively significant frequency band near 200 kHz showed any degree of intensity (9 muV/m including a background level of 5 muV/m). The level was measured very near the array (at 20 ft distance) while Federal Communications Commission (FCC) regulations limit spurious emissions to 15 muV/m at 1,000 ft. No field strength readings could be obtained even at 35 ft distant.

Johnson, J. A.↗

Effects of outdoor exposure on solar cell modules in the ERDA/NASA Lewis Research Center Systems Test Facility

The effects of outdoor exposure were determined by comparing standard I-V data obtained for the as-received modules with similar data obtained after removal from the field and cleaning with detergent solution. All modules measured in this way exhibited nonrecoverable degradation in P sub maximum varying from 4 to 7 percent. One module exposed for 41 days exhibited partial cell discoloration, loss of front surface metallization over the discolored portion, and a decrease in P sub maximum of 7 percent, tentatively attributed to cell damage. Measurements before and after cleaning showed a recoverable degradation due to dirt accumulation. This recoverable loss in power was 11 percent after 245 days in the field for one brand of module, 6 percent after 48 days for another brand, and 4 1/2 percent for the third brand.

Weinberg, I.↗

Photovoltaic power system tests on an 8-kilowatt single-phase line-commutated inverter

Efficiency and power factor were measured as functions of solar array voltage and current. The effects of input shunt capacitance and series inductance were determined. Tests were conducted from 15 to 75 percent of the 8 kW rated inverter input power. Measured efficiencies ranged from 76 percent to 88 percent at about 50 percent of rated inverter input power. Power factor ranged from 36 percent to 72 percent.

Stover, J. B.↗