Preliminary design of a shuttle docking and cargo handling system
Work performed prior to concept selection, concept evaluation, and the preliminary design are summarized. The initial work included selection of the requirements and guidelines used to formulate concepts; analysis to determine detailed requirements for reach, velocity, torque, etc.; formulation of the alternative concepts; the evaluation and ranking of the concepts; and the selection of a concept. The man-in-the-loop simulation performed with a six degree of freedom moving base simulator and a three degree of freedom manipulator arm are described. The analysis and tradeoffs of those design parameters which are the key to the preliminary design are described. Estimates for a future development program are presented, including a schedule and manpower breakdown and cost estimate. The system design parameters, with a weight and power breakdown are summarized.