Search NASA⌕ Search

SEARCH · Search NASA

Results for “Automated Flight”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The pilot interface with cockpit automation and advanced avionics systems

A flight test program was conducted with a sophisticated, integrated avionics system to study pilot workload and the pilot interface with high levels of avionics capability. The study indicates that advanced systems can provide improved information to the pilot and additional functional capability. The study also indicates that additional research is needed to develop the knowledge base required to design pilot interfaces with such systems. The combination of the pilot interface and the high level of system capability used in this study led to pilot blunders associated with navigation data management, autopilot management, and maintaining awareness of system status. A functional relationship is suggested between level of avionics system sophistication and the required state-of-the-art in pilot/avionics interface design. Suggested guidelines for the design of the pilot/avionics interface for advanced avionics systems are given.

Hinton, D. A.↗

The Generic Spacecraft Analyst Assistant (GenSAA): A tool for automating spacecraft monitoring with expert systems

Flight Operations Analysts (FOAs) in the Payload Operations Control Center (POCC) are responsible for monitoring a satellite's health and safety. As satellites become more complex and data rates increase, FOAs are quickly approaching a level of information saturation. The FOAs in the spacecraft control center for the COBE (Cosmic Background Explorer) satellite are currently using a fault isolation expert system named the Communications Link Expert Assistance Resource (CLEAR), to assist in isolating and correcting communications link faults. Due to the success of CLEAR and several other systems in the control center domain, many other monitoring and fault isolation expert systems will likely be developed to support control center operations during the early 1990s. To facilitate the development of these systems, a project was initiated to develop a domain specific tool, named the Generic Spacecraft Analyst Assistant (GenSAA). GenSAA will enable spacecraft analysts to easily build simple real-time expert systems that perform spacecraft monitoring and fault isolation functions. Lessons learned during the development of several expert systems at Goddard, thereby establishing the foundation of GenSAA's objectives and offering insights in how problems may be avoided in future project, are described. This is followed by a description of the capabilities, architecture, and usage of GenSAA along with a discussion of its application to future NASA missions.

Hughes, Peter M.↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

Seeker 1.0 GNC Flight Performance (presentation)

Seeker is an automated extravehicular inspection spacecraft that was designed and built in-house at the NASA Johnson Space Center (JSC) over approximate-ly 18 months with a budget of $1.8 million. This first version of Seeker is in-tended to be an incremental development towards an advanced inspection ca-pability. Seeker launched onboard the NG-11 Cygnus mission in 2019 and de-ployed from Cygnus on September 16, 2019. Downlinked telemetry, imagery from the chaser and target spacecraft, and onboard engineering data logs are used to provide an analysis of the system’s performance. This paper reviews the performance of the Seeker vehicle with a focus on the guidance, navigation, and control (GNC) system. The results are presented with a discussion of the re-lated system design to highlight how decisions and applied methods culminated in the observed performance.

Sam Pedrotty↗

An evaluation of a real-time fault diagnosis expert system for aircraft applications

A fault monitoring and diagnosis expert system called Faultfinder was conceived and developed to detect and diagnose in-flight failures in an aircraft. Faultfinder is an automated intelligent aid whose purpose is to assist the flight crew in fault monitoring, fault diagnosis, and recovery planning. The present implementation of this concept performs monitoring and diagnosis for a generic aircraft's propulsion and hydraulic subsystems. This implementation is capable of detecting and diagnosing failures of known and unknown (i.e., unforseeable) type in a real-time environment. Faultfinder uses both rule-based and model-based reasoning strategies which operate on causal, temporal, and qualitative information. A preliminary evaluation is made of the diagnostic concepts implemented in Faultfinder. The evaluation used actual aircraft accident and incident cases which were simulated to assess the effectiveness of Faultfinder in detecting and diagnosing failures. Results of this evaluation, together with the description of the current Faultfinder implementation, are presented.

Schutte, Paul C.↗

CFS Test Framework

NASA's Core Flight System (cFS) provides a generic flight software framework architecture for developing flight software. As the cFS framework has gained popularity over the years within the flight software community, supporting software tools have been developed to assist in the design, development, testing and verification of flight software. The cFS Test Framework (CTF) is a recently developed cFS tool with capabilities to develop and run automated test and verification scripts against flight software targets. The CTF tool parses and executes JSON-based test scripts containing test instructions, while logging and reporting the results. CTF utilizes a plugin-based architecture to allow developers to extend CTF with new test instructions, external interfaces, and custom functionality. To interface with flight software, CTF parses a set of CCSDS message definition files to create the necessary command and telemetry structures for use during the test run. Additionally, CTF also supports interfacing with multiple cFS instances, allowing a test script to verify requirements that involve multiple flight software targets. Lastly, CTF provides support for executing test scripts against FSW running on remote or embedded hardware. This allows CTF to execute the same test scripts across different target configurations throughout the development process. In this presentation, we will introduce the cFS Test Framework (CTF) architecture, discuss the history of cFS testing frameworks, and present the features and capabilities currently provided by CTF. Lastly, we will show a demo of the CTF tool being used to execute test scripts against flight software.

cfs↗

Implementation and flight tests for the Digital Integrated Automatic Landing System (DIALS). Part 2: Complete set of flight data

Five flight tests of the Digital Automated Landing System (DIALS) were conducted on the Advanced Transport Operating System (ATOPS) Transportation Research Vehicle (TSRV)--a modified Boeing 737 Aircraft for advanced controls and displays research. These flight tests were conducted at NASA's Wallops Flight Center using the Microwave Landing System (MLS) installation on Runway 22. This report is primarily a collection of data plots of all performance variables recorded for the entire five flight tests. A description and source of the performance variables is included. Performance variables include inertial data, air data, automatic control commands, control servo positions, sensor data, DIALS guidance and control parameters, and Kalman filter data. This data illustrates low overshoot captures of the localizer for intercept angles of 20 deg, 30 deg, 40 deg, and 50 deg intercept angles, and low overshoot captures of the glideslope slope for 3 deg, 4.5 deg, and 5 deg glideslopes. Flare maneuvers were successfully performed from the various glideslope angles and good decrab maneuvers were performed in crosswinds of 6 knots. In 18 to 20 knot crosswind conditions rudder limiting occurred which caused lateral drifting although heading alignment was achieved.

Hueschen, R. M.↗

Implementation and flight tests for the Digital Integrated Automatic Landing System (DIALS). Part 1: Flight software equations, flight test description and selected flight test data

Five flight tests of the Digital Automated Landing System (DIALS) were conducted on the Advanced Transport Operating Systems (ATOPS) Transportation Research Vehicle (TSRV) -- a modified Boeing 737 aircraft for advanced controls and displays research. These flight tests were conducted at NASA's Wallops Flight Center using the microwave landing system (MLS) installation on runway 22. This report describes the flight software equations of the DIALS which was designed using modern control theory direct-digital design methods and employed a constant gain Kalman filter. Selected flight test performance data is presented for localizer (runway centerline) capture and track at various intercept angles, for glideslope capture and track of 3, 4.5, and 5 degree glideslopes, for the decrab maneuver, and for the flare maneuver. Data is also presented to illustrate the system performance in the presence of cross, gust, and shear winds. The mean and standard deviation of the peak position errors for localizer capture were, respectively, 24 feet and 26 feet. For mild wind conditions, glideslope and localizer tracking position errors did not exceed, respectively, 5 and 20 feet. For gusty wind conditions (8 to 10 knots), these errors were, respectively, 10 and 30 feet. Ten hands off automatic lands were performed. The standard deviation of the touchdown position and velocity errors from the mean values were, respectively, 244 feet and 0.7 feet/sec.

Hueschen, R. M.↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface Capabilities at Charlotte Douglas International Airport

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

Jung, Yoon C.↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

An automated calibration laboratory - Requirements and design approach

NASA's Dryden Flight Research Facility (Ames-Dryden), operates a diverse fleet of research aircraft which are heavily instrumented to provide both real time data for in-flight monitoring and recorded data for postflight analysis. Ames-Dryden's existing automated calibration (AUTOCAL) laboratory is a computerized facility which tests aircraft sensors to certify accuracy for anticipated harsh flight environments. Recently, a major AUTOCAL lab upgrade was initiated; the goal of this modernization is to enhance productivity and improve configuration management for both software and test data. The new system will have multiple testing stations employing distributed processing linked by a local area network to a centralized database. The baseline requirements for the new AUTOCAL lab and the design approach being taken for its mechanization are described.

O'Neil-Rood, Nora↗

Cooperative Automation Supporting Pilot-Dispatch Negotiation of Enroute Trajectory Change Requests

The advent of advanced technologies in communication, navigation, and surveillance is enabling more integration between the aircraft and the ground systems in managing air traffic operations. As a result, automation has evolved to provide the flight crew, air traffic controllers, and traffic flow managers with capabilities for collaborating on information access, analysis, and decision making. In this paper, we investigate different cooperative schemes between these agents, supported by automation, in managing dynamic trajectory changes while the flight is en route to improve flight and system performance. The analysis was conducted using an abstract cognitive tasking framework to identify trajectory change tasks independently from the agent performing them. Cooperation schemes were then derived by assessing different levels of cooperation on each task between the air and ground agents and their automation. The assessment was based on which automation-supported agent is more capable of performing the task and the expected benefit mechanisms that result from cooperating. The cooperation schemes were compared based on a qualitative, but objective, assessment of the benefits expected from cooperation.

air-ground integration↗

Improving Flight Software Module Validation Efforts : a Modular, Extendable Testbed Software Framework

Ever since Explorer-1, the United States' first Earth satellite, was developed and launched in 1958, JPL has developed many more spacecraft, including landers and orbiters. While these spacecraft vary greatly in their missions, capabilities,and destination, they all have something in common. All of the components of these spacecraft had to be comprehensively tested. While thorough testing is important to mitigate risk, it is also a very expensive and time consuming process. Thankfully,since virtually all of the software testing procedures for SMAP are computer controlled, these procedures can be automated. Most people testing SMAP flight software (FSW) would only need to write tests that exercise specific requirements and then check the filtered results to verify everything occurred as planned. This gives developers the ability to automatically launch tests on the testbed, distill the resulting logs into only the important information, generate validation documentation, and then deliver the documentation to management. With many of the steps in FSW testing automated, developers can use their limited time more effectively and can validate SMAP FSW modules quicker and test them more rigorously. As a result of the various benefits of automating much of the testing process, management is considering this automated tools use in future FSW validation efforts.

flight software testing↗

Mission Operations and Command Assurance: Automating an Operations TQM Task

Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality into mission operations. The mission operations environment is inherently risky because each decision made is potentially mission critical. The flight operations environment generally requires operators to make rapid critical decisions and solve problems based on limited information, while closely following standard procedures. MO&CA's primary goal is to help improve the operational reliability and reduce risk of projects during flight. To achieve this goal, automation of the MO&CA task is required. MO&CA specifically embodies the TQM principle of continuous process improvement (CPI) in which processes are continually examined and analyzed for opportunities for improvement. The second way in which MO&CA implements CPI on JPL projects is on new projects or upgrades to existing projects.

mission↗

Status of automatic guidance systems for rotorcraft in low altitude flight

Rotorcraft operating in high-threat environments fly close to the earth's surface to utilize surrounding terrain, vegetation, or man-made objects to minimize the risk of being detected by an enemy. The piloting of the rotorcraft is at best a very demanding task and the pilots need help from on-board automation tools in order to devote more time to mission-related activities. The Automated Nap-of-the-Earth (NOE) Flight Program is a cooperative NASA/Army program aimed at the development of technologies for enhancing piloted low-altitude/NOE flight path management and control through computer and sensor aiding. The long-term objective is to work towards achieving automation for aiding the pilot in NOE flight with a flight demonstration of resulting computer/sensor aiding concepts at an established course. The technology for pilot-centered NOE automation is not currently available. Success in automating NOE functions will depend on major breakthroughs in real-time flight path planning algorithms, effective methods for the pilot to interface to the automatic modes, understanding of visual images, sensor data processing/fusion, and sensor development. Our approach to developing the technologies required to solve this problem consist of the following phases: (1) algorithm development, (2) laboratory evaluation, (3) piloted ground simulation, and (4) evaluation in flight. An overview of the research in this area at NASA Ames Research Center is given.

Sridhar, Banavar↗

Automation of the space station core module power management and distribution system

Under the Advanced Development Program for Space Station, Marshall Space Flight Center has been developing advanced automation applications for the Power Management and Distribution (PMAD) system inside the Space Station modules for the past three years. The Space Station Module Power Management and Distribution System (SSM/PMAD) test bed features three artificial intelligence (AI) systems coupled with conventional automation software functioning in an autonomous or closed-loop fashion. The AI systems in the test bed include a baseline scheduler/dynamic rescheduler (LES), a load shedding management system (LPLMS), and a fault recovery and management expert system (FRAMES). This test bed will be part of the NASA Systems Autonomy Demonstration for 1990 featuring cooperating expert systems in various Space Station subsystem test beds. It is concluded that advanced automation technology involving AI approaches is sufficiently mature to begin applying the technology to current and planned spacecraft applications including the Space Station.

Weeks, David J.↗