Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM LINES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The MAXEBIS at GSI as a test ion source for charge breeding and for HITRAP

The electron beam ion source MAXEBIS, developed and built at the University of Frankfurt, has been installed at GSI to serve as an offline test ion source for the HITRAP project and for use as a test setup for charge breeding explorations. The setup has been equipped with new diagnostics and beam optics devices. Two ion sources dedicated to the production of singly charged ions for external ion injection into the MAXEBIS have been included. First time of flight (TOF) spectra with external injected, charge-bred argon ions were taken. However, these spectra indicated beam losses in the beam transport from the multipassage spectrometer (MPS) to the MAXEBIS. In order to understand the losses, the beam transport has been simulated with the SIMION code and the beam line has been modified accordingly. Measurements of the MAXEBIS' beam emittance, using the ''nondestructive'' beam profile method, have been performed as well as measurements of the electron current density via charge state analysis of the TOF spectra. The injection and breeding efficiency of the MAXEBIS have been determined for the first time. The results of the measurements and the planned experiments will be discussed.

43 PARTICLE ACCELERATORS↗

Research Activities At The RCNP Cyclotron Facility

The Research Center for Nuclear Physics (RCNP) cyclotron cascade system has been operated to provide high quality beams for various experiments. In order to increase the physics research opportunities, the Azimuthally Varying Field (AVF) cyclotron facility was upgraded recently. A flat-topping system and an 18-GHz superconducting Electron Cyclotron Resonance (ECR) ion source were introduced to improve the beam's quality and intensity. A new beam line was installed to diagnose the characteristics of the beam to be injected into the ring cyclotron and to bypass the ring cyclotron and directly transport low energy beams from the AVF cyclotron to experimental halls. A separator is equipped to provide RI beams produced by fusion reactions at low energy and by projectile fragmentations at high energy. Development has continued to realize the designed performance of these systems.

43 PARTICLE ACCELERATORS↗

Study of boron detection limit using the in-air PIGE set-up at LAMFI-USP

The quantification of small amounts of boron in materials is of extreme importance in different areas of materials science. Boron is an important contaminant and also a silicon dopant in the semiconductor industry. Boron is also extensively used in nuclear power plants, either for neutron shielding or for safety control and boron is an essential nutrient for life, either vegetable or animal. The production of silicon solar cells, by refining metallurgical-grade silicon (MG-Si) requires the control and reduction of several silicon contaminants to very low concentration levels. Boron is one of the contaminants of solar-grade silicon (SG-Si) that must be controlled and quantified at sub-ppm levels. In the metallurgical purification, boron quantification is usually made by Inductive Coupled Plasma Mass Spectrometry, (ICP-MS) but the results need to be verified by an independent analytical method. In this work we present the results of the analysis of silicon samples by Particle Induced Gamma-Ray Emission (PIGE) aiming the quantification of low concentrations of boron. PIGE analysis was carried out using the in-air external beam line of the Laboratory for Materials Analysis with Ion Beams (LAMFI-USP) by the {sup 10}B(p,αγ({sup 7}Be nuclear reaction, and measuring the 429 keV γ-ray. The in-air PIGE measurements at LAMFI have a quantification limit of the order of 10{sup 16} at/cm{sup 2}.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Low energy highly charged ion beam facility at Inter University Accelerator Centre: Measurement of the plasma potential and ion energy distributions

A deceleration lens coupled to one of the beam lines of the electron cyclotron resonance based low energy beam facility at Inter University Accelerator Centre is reported. This system is capable of delivering low energy (2.5 eV/q–1 keV/q) highly charged ion beams. The presence of plasma potential hinders the measurements of low energies (<50 eV), therefore, plasma potential measurements have been undertaken using a retarding plate analyzer in unison with the deceleration assembly. The distributions of the ion energies have been obtained and the effect of different source parameters on these distributions is studied.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Performance and physics measurements at protoDUNE-SP

The protoDUNE Single Phase (protoDUNE-SP) TPC is a prototype for the DUNE far detector and it is currently under construction at CERN. It will not only serve as a test-bed for the engineering design and construction techniques but will also provide a set of key measurements for the future DUNE far detector.The new extension of the H4 beam-line at CERN will provide electron, muon and hadron beams with energies in the range of sub-GeV to a few GeV. The data collected during the test beams will be analysed to assess the performance of a state-of-the-art LAr TPC. For such detectors the event reconstruction is challenging and test beam data will allow the performance of the different reconstruction algorithms, which also involve machine-learning techniques, to be benchmarked and improved. Furthermore, important physics measurements are foreseen with protoDUNE-SP. For example, the study of pion interactions in argon using test beams is fundamental to understand some of the processes that will be seen as part of the primary neutrino interactions and which would modify the event signature in the DUNE detectors. ProtoDUNE-SP will provide new measurements of the pion-Ar cross-section, for both positive and negative charges, which will make a vital contribution to improve the current, very limited knowledge of such interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Emittance and Phase Space Tomography for the Fermilab Linac

The Fermilab Linac delivers a variable intensity, 400-MeV beam to the MuCool Test Area experimental hall via a beam line specifically designed to facilitate measurements of the Linac beam emittance and properties. A 10 m, dispersion-free and magnet-free straight utilizes an upstream quadrupole focusing triplet in combination with the necessary in-straight beam diagnostics to fully characterize the transverse beam properties. Since the Linac does not produce a strictly elliptical phase space, tomography must be performed on the profile data to retrieve the actual particle distribution in phase space. This is achieved by rotating the phase space distribution using different waist focusing conditions of the upstream triplet and performing a deconvolution of the profile data. Preliminary measurements using this diagnostic section are reported here. These data represent a first-pass measurement of the Linac emittance based on various techniques. It is clear that the most accurate representation of the emittance is given by the 3-profile approach. Future work will entail minimizing the beam spot size on MW5 to test and possibly improve the accuracy of the 2-profile approach. The 95% emittance is {approx} 18{pi} in the vertical and {approx} 13{pi} in the horizontal, which is especially larger than anticipated - 8-10{pi} was expected. One possible explanation is that the entire Linac pulse is extracted into the MTA beamline and during the first few microseconds, the feed forward and RF regulation are not stable. This may result in a larger net emittance observed versus beam injected into Booster, where the leading part of the Linac beam pulse is chopped. Future studies will clearly entail a measurement of the emittance vs. pulse length. One additional concern is that the Linac phase space is most likely aperture-defined and non-elliptical in nature. A non-elliptical phase-space determination would require a more elaborate analysis and provide another explanation of the large emittance measured.

43 PARTICLE ACCELERATORS↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that attempts to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction is well advanced and beam commissioning of ATF2 has started in the second half of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, Andrei↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

43 PARTICLE ACCELERATORS↗

Development of Radioactive Ion Beam Purification by Selective Adsorption at the HRIBF

In the past decades many techniques have been developed to reduce isobaric contaminations in ISOL (Isotope Separation On-Line) beams. Another promising method to achieve improved selectivity is employing surface effects in the transfer line between target container and ion source. Thus adsorption materials with suitable atomic structure and polarity can lead to a high chemical selectivity. The principle of selective adsorption has already been employed successfully in the past. Quartz transfer lines are applied on-line at ISOLDE and have been shown to reduce Rb contaminations by 5 orders of magnitude. Since quartz is the only compound that has been tested yet we plan to conduct a broad on-line study of the adsorption behavior of various elements on a range of materials. For testing at the On-Line Test Facility at the Holifield Radioactive Ion Beam Facility (HRIBF) a special target-ion source unit with a variable-temperature transfer line has been constructed in collaboration with the ISOLDE technical group. Based on the design of the ISOLDE prototype unit it was modified to match the unique capabilities of the OLTF. Preliminary results of on-line tests are presented.

43 PARTICLE ACCELERATORS↗

Customized Bayesian optimization for efficient beam tuning at the facility for rare isotope beams

Bayesian optimization (BO) has recently emerged as a powerful approach for on-line beam tuning, and it is rapidly gaining adoption across accelerator facilities due to its flexibility and efficiency in handling complex optimization tasks. At the Facility for Rare Isotope Beams, rapid and reliable tuning is essential to support the delivery of diverse ion species. To improve the practicality of BO in this setting, we implemented several enhancements, including scalarized composite objective construction for multicriteria optimization, asynchronous evaluation for better resource utilization, prior-mean-assisted optimization to accelerate convergence, and a local search strategy for rapid completion of the task. We present the details of these methods, discuss challenges-encountered, and share our experience applying them to specific beam-tuning tasks.

Accelerators & storage rings↗

Design and simulation study of ultra-fast beam bunches split for three orthogonal planes high-energy electron dynamic radiography

Here a compact three orthogonal planes high-energy electron radiography system was proposed. One of the critical technologies, the ultra-fast beam bunches split from the bunch train are studied. The separated bunches could be transported to the three orthogonal planes of the target for dynamic radiography diagnostics. The key elements of the ultra-fast bunches split system are transverse deflecting cavity (TDC) and the twin septum magnet (TSM). The principle of TDC and TSM are briefly introduced. An example of the beam bunches split system for test experiment (40 MeV electron beam) with TDC and TSM is designed and studied by particle-tracking simulation and it confirms this method is valid and feasible. Especially with TSM, a compact three orthogonal planes radiography system can be realized. The evolution of the beam parameters along the beam line from simulation are investigated. The detailed design of the beam split system and beam dynamics simulation study are presented in this paper.

Zhao, Q. T.↗

Longitudinal-to-Transverse Mapping for Femtosecond Electron Bunch Length Measurement

A longitudinal-to-transverse mapping technique is proposed to measure the length and temporal profile of ultrashort electron bunches. In this scheme a special chicane and a radio-frequency deflecting cavity are used to transform the beam's longitudinal distribution into angular distribution which is further converted to transverse distribution after a parallel-to-point imaging beam line. With this technique, the temporal profile of the electron beam is exactly mapped to the transverse profile. This makes it possible to measure ultrashort electron bunch length with a resolution well beyond 1 femtosecond.

43 PARTICLE ACCELERATORS↗

HIGH CURRENT HIGH CHARGE MAGNETIZED AND BUNCHED ELEC-TRON BEAM FROM A DC PHOTOGUN FOR JLEIC COOLER

A high current, high charge magnetized electron beam-line was developed for fast and efficient cooling of ion beams for the proposed Jefferson Lab Electron Ion Col-lider (JLEIC). In this paper, we describe recent achieve-ments that include the generation of picosecond-bunch magnetized beams at average currents up to 28 mA with exceptionally long photocathode lifetime, and independent demonstrations of magnetized beam with high bunch charge up to 700 pC at 10s of kHz repetition rates. In addition, a detailed description of an extremely stable and reliable fiber-based drive laser system that employs a gain-switched master oscillator is presented. These ac-complishments mark important steps toward demonstrat-ing the feasibility of a technically challenging JLEIC cooler design using magnetized beams

Adderley, P.↗

Beam Position and Phase Monitor - Wire Mapping System

The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

43 PARTICLE ACCELERATORS↗

Mechanical design of ceramic beam tube braze joints for NOvA kicker magnets

The NO?A Experiment will construct a detector optimized for electron neutrino detection in the existing NuMI neutrino beam. The NuMI beam line is capable of operating at 400 kW of primary beam power and the upgrade will allow up to 700 kW. Ceramic beam tubes are utilized in numerous kicker magnets in different accelerator rings at Fermi National Accelerator Laboratory. Kovar flanges are brazed onto each beam tube end, since kovar and high alumina ceramic have similar expansion curves. The tube, kovar flange, end piece, and braze foil alloy brazing material are stacked in the furnace and then brazed. The most challenging aspect of fabricating kicker magnets in recent years have been making hermetic vacuum seals on the braze joints between the ceramic and flange. Numerous process variables can influence the robustness of conventional metal/ceramic brazing processes. The ceramic-filler metal interface is normally the weak layer when failure does not occur within the ceramic. Differences between active brazing filler metal and the moly-manganese process will be discussed along with the applicable results of these techniques used for Fermilab production kicker tubes.

43 PARTICLE ACCELERATORS↗

Absolute calibration of the DANCE thermal neutron beam using sodium activation

The calculation of the neutron capture cross section as a function of energy in the thermal range requires a precise knowledge of the absolute neutron flux. In this paper a method of calibrating a thermal neutron beam using the controlled activation of sodium is described. Here, the method is applied to the FP-14 Time Of Flight neutron beam line at the Los Alamos Neutron Science Center to calibrate the beam to an uncertainty level of ±5 %.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

BETSI, a new test bench for ion sources optimization at CEA SACLAY

In the framework of several International HPPA projects (such as IFMIF, IPHI, and Spiral2) the CEA handles the design and the developments of several electron cyclotron resonance (ECR) ion sources. For the IFMIF EVEDA demonstrator, a 140 mA cw extracted deuteron beam will be required for high yield of neutron production. For radioactive ion production in the Spiral2 project, several milliamperes of deuterons will be delivered with a permanent magnet source. The optimization of the beam quality at the entrance of the radio frequency quadropole (RFQ) accelerator system triggered the need of a new test bench for ion source optimization and beam qualification. The BETSI ion source test bench will operate up to 50 kV and ignite cw or pulsed hydrogen plasma with a 2.45 GHz magnetron. Great care has already been taken to design electrostatic optics of the extraction system to minimize the emittance growth. Plasma diagnostics will be inserted in the source chamber and several beam diagnostics (emittance and current measurements, beam species analysis) will also be implemented on the low energy beam line transport (LEBT). These diagnostics allow the simultaneous analysis of the beam quality with the plasma parameters of the source. Regional funding request will also be needed to improve the LEBT for space charge compensation measurements. The design of the present and upgraded test bench will be reported as well as the first extracted beam analysis.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗