Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

A multi-scale spatial approach to address environmental effects of small hydropower development

Hydropower development continues to grow worldwide in developed and developing countries. While the ecological and physical responses to dam construction have been well documented, translating this information into planning for hydropower development is extremely difficult. Very few studies have conducted environmental assessments to guide site-specific or widespread hydropower development. Herein, we propose a spatial approach for estimating environmental effects of hydropower development at multiple scales, as opposed to individual site-by-site assessments (e.g., environmental impact assessment). Because the complex, process-driven effects of future hydropower development may be uncertain or, at best, limited by available information, we invested considerable effort in describing novel approaches to represent environmental concerns using spatial data and in developing the spatial footprint of hydropower infrastructure. Furthermore, we then use two case studies in the US, one at the scale of the conterminous US and another within two adjoining rivers basins, to examine how environmental concerns can be identified and related to areas of varying energy capacity. We use combinations of reserve-design planning and multi-metric ranking to visualize tradeoffs among environmental concerns and potential energy capacity. Spatial frameworks, like the one presented, are not meant to replace more in-depth environmental assessments, but to identify information gaps and measure the sustainability of multi-development scenarios as to inform policy decisions at the basin or national level. Most importantly, the approach should foster discussions among environmental scientists and stakeholders regarding solutions to optimize energy development and environmental sustainability.

13 HYDRO ENERGY↗

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Potential Large Decadal Missions Enabled by Nasas Space Launch System

Large space telescope missions have always been limited by their launch vehicle's mass and volume capacities. The Hubble Space Telescope (HST) was specifically designed to fit inside the Space Shuttle and the James Webb Space Telescope (JWST) is specifically designed to fit inside an Ariane 5. Astrophysicists desire even larger space telescopes. NASA's "Enduring Quests Daring Visions" report calls for an 8- to 16-m Large UV-Optical-IR (LUVOIR) Surveyor mission to enable ultra-high-contrast spectroscopy and coronagraphy. AURA's "From Cosmic Birth to Living Earth" report calls for a 12-m class High-Definition Space Telescope to pursue transformational scientific discoveries. NASA's "Planning for the 2020 Decadal Survey" calls for a Habitable Exoplanet Imaging (HabEx) and a LUVOIR as well as Far-IR and an X-Ray Surveyor missions. Packaging larger space telescopes into existing launch vehicles is a significant engineering complexity challenge that drives cost and risk. NASA's planned Space Launch System (SLS), with its 8 or 10-m diameter fairings and ability to deliver 35 to 45-mt of payload to Sun-Earth-Lagrange-2, mitigates this challenge by fundamentally changing the design paradigm for large space telescopes. This paper reviews the mass and volume capacities of the planned SLS, discusses potential implications of these capacities for designing large space telescope missions, and gives three specific mission concept implementation examples: a 4-m monolithic off-axis telescope, an 8-m monolithic on-axis telescope and a 12-m segmented on-axis telescope.

Technology↗

Integrated Assessment Modeling of Grid Resilience: GCAM-to-PCM Scoping

Deep decarbonization towards a net-zero emissions future and the associated growth in power demand, renewables, and changes in water availability will require significant evolution in grid planning. Many obstacles threaten the viability of near-term generation capacity build out, including the need for large-scale transmission expansion. Current very-long term planning tools do not adequately model physical representations of economic dispatch and system topology down to inter- and intra-regional transmission and distribution infrastructure. This project attempts to fill that gap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advancing Understanding of Geothermal Representation in the Power Sector to Accelerate Deployment

Driven mostly by decarbonization goals, geothermal interest in the US power sector has grown considerably, gradually evolving from being considered a niche technology, to being recognized as a viable source of clean, baseload, grid-balancing power, and renewable electric power generation. Furthermore, recent technical advances that could greatly accelerate deployment in the near future, and US federal incentives for low-carbon generation technologies, including geothermal, can enable opportunities for integrating geothermal into utilities resource planning portfolios. However, in general, utilities do not have in-house expertise to evaluate geothermal technologies and its potential role in helping decarbonize the grid as well as help them achieve their individual decarbonization goals. To date, geothermal is rarely included in Capacity Expansion Models (CEM) which utilities use in their planning activities and resource/technologies prioritization. To this end, EPRI and NREL are working together in a DOE-GTO funded research project to improve geothermal understanding (opportunities, value, risks) among the power industry to help accelerate geothermal deployment. In the present paper we describe the approach and preliminary findings of this work, focused on two topics: 1) Expand the degree of understanding on the value, opportunity, and risk of geothermal technologies among utilities and related companies/groups, specifically around geothermal for power generation. 2) Improve representation of geothermal power technologies in capacity expansion models (CEM).

capacity expansion models↗

Equipment Qualification Report Environmental Qualification of GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah100G33 Battery Rack Assembly (24590-QL-POA-EDB0-00001-11-00002_00A)

Greenberry Environmental Qualification Report 550001.001-35.0.5 provides basis for assignment of qualified life for: GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah 100G33 Battery Rack Assembly in accordance with the requirements specified 24590-WTP-3PS-G000-T0015 (Rev 2) and Environmental Qualification Plan 550001.001-35.0.1 (Rev. 3). The equipment qualification basis represents the most conservative capability of the equipment. The analysis performed for the qualification is not less conservative than the bounding environmental conditions detailed in contract documents issued to Greenberry in contract 24509-QL-POA-EDB0-00001 Rev.0. The qualified life of 10 years has been established based upon an end-condition objective of the equipment condition indicators that correlate to the ability of equipment to perform its safety function. The VRLA Battery Cell Assembly was aged by 10 years (minimum) in accordance with conditions specified by Bechtel Equipment Qualification Datasheet 24590-LAW-EUQ-UPE 00003 Rev. 3 and the process conditions specified by the Instrument Data Sheet 24590-LAW EUD-UPE-00009 Rev. 2. Greenberry Industrial has contracted with GNB Industrial Battery Co located at 4115 S Zero St, Fort Smith, AR 72908 to perform age conditioning, monitoring, and capacity testing in accordance with Environmental Qualification Plan 550001.001-35.0.1 Rev. 1. The required process at the stated conditions set by the parameters established by the plan were completed satisfactorily. The details of the of the test process observed by Greenberry is detailed in the attached Seismic Test Log 550001.001-7.0.3, including examples of the objective evidence collected during the qualification process.

54 ENVIRONMENTAL SCIENCES↗

Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

Public and private funding for end-use energy efficiency actions is expected to increase significantly in the United States over the next decade. For example, Barbose et al (2009) estimate that spending on ratepayer-funded energy efficiency programs in the U.S. could increase from $3.1 billion in 2008 to $7.5 and 12.4 billion by 2020 under their medium and high scenarios. This increase in spending could yield annual electric energy savings ranging from 0.58% - 0.93% of total U.S. retail sales in 2020, up from 0.34% of retail sales in 2008. Interest in and support for energy efficiency has broadened among national and state policymakers. Prominent examples include {approx}$18 billion in new funding for energy efficiency programs (e.g., State Energy Program, Weatherization, and Energy Efficiency and Conservation Block Grants) in the 2009 American Recovery and Reinvestment Act (ARRA). Increased funding for energy efficiency should result in more benefits as well as more scrutiny of these results. As energy efficiency becomes a more prominent component of the U.S. national energy strategy and policies, assessing the effectiveness and energy saving impacts of energy efficiency programs is likely to become increasingly important for policymakers and private and public funders of efficiency actions. Thus, it is critical that evaluation, measurement, and verification (EM&V) is carried out effectively and efficiently, which implies that: (1) Effective program evaluation, measurement, and verification (EM&V) methodologies and tools are available to key stakeholders (e.g., regulatory agencies, program administrators, consumers, and evaluation consultants); and (2) Capacity (people and infrastructure resources) is available to conduct EM&V activities and report results in ways that support program improvement and provide data that reliably compares achieved results against goals and similar programs in other jurisdictions (benchmarking). The National Action Plan for Energy Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources often with multiple program administrators and intended to meet multiple purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Challenges in Estimating the Capacity Value of Solar Photovoltaics

We examine the robustness of solar capacity-value estimates to three important data issues. The first is the sensitivity to using hourly averaged as opposed to subhourly solar-insolation data. The second is the sensitivity to errors in recording and interpreting load data. The third is the sensitivity to using modeled as opposed to measured solar-insolation data. We demonstrate that capacity-value estimates of solar are sensitive to all three of these factors, with potentially large errors in the capacity-value estimate in a particular year. If multiple years of data are available, the biases introduced by using hourly averaged solar-insolation can be smoothed out. Multiple years of data will not necessarily address the other data-related issues that we examine. Our analysis calls into question the accuracy of a number of solar capacity-value estimates relying exclusively on modeled solar-insolation data that are reported in the literature (including our own previous works). Our analysis also suggests that multiple years' historical data should be used for remunerating solar generators for their capacity value in organized wholesale electricity markets.

14 SOLAR ENERGY↗

Cost and Performance Assumptions for Modeling Electricity Generation Technologies

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative practices are being implemented to evaluate system needs, hosting capacities, and system investments needed to accommodate DPV deployment. (7) Estimating avoided losses associated with DPV: A time-differentiated marginal loss rate provides the most comprehensive estimate of avoided losses due to DPV, but no studies appear to use it. (8) Considering changes in DPV's value with higher solar penetration: Innovative methods for addressing the value changes at high solar penetrations are lacking among the studies we evaluate. (9) Integrating DPV in planning across generation, transmission, and distribution: A few states and regions have started to develop more comprehensive processes that link planning forums, but there are still many issues to address.

14 SOLAR ENERGY↗

Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being implemented to evaluate system needs, hosting capacities, and system investments needed to accommodate DPV deployment. 7) Estimating avoided losses associated with DPV: A time-differentiated marginal loss rate provides the most comprehensive estimate of avoided losses due to DPV, but no studies appear to use it. 8) Considering changes in DPV’s value with higher solar penetration: Innovative methods for addressing the value changes at high solar penetrations are lacking among the studies we evaluate. 9) Integrating DPV in planning across generation, transmission, and distribution: A few states and regions have started to develop more comprehensive processes that link planning forums, but there are still many issues to address.

14 SOLAR ENERGY↗

Assessing the impact of nuclear retirements on the U.S. power sector

This work utilizes the Regional Energy Deployment System (ReEDS) model to analyze the impacts of four nuclear retirement scenarios of the U.S. electricity sector, from nuclear plant lifetimes of 50 to 80 years. The analysis finds that longer nuclear lifetimes decrease the amount of renewable and natural gas capacity. Longer nuclear lifetimes also resulted in lower cumulative and annual carbon emissions, lower transmission builds, and higher energy curtailment and water usage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Powered By: Transmission Planning

Presented as part of the NREL Grid Planning and Analysis Center's (GPAC) "Powered By" Series, this iteration focuses not on a specific tool but instead on a domain of expertise/capability being built out at NREL: transmission planning. Various sets of tools are integrated together in this presentation to present a combination of transmission focus areas, case studies, tools and future directions of transmission research.

capacity expansion↗

Toward a lean analysis for waste to support the decommissioning operation - 15321

All over the world, several nuclear facilities have been shut down few years ago and are now under dismantling or will be dismantled in the future. - Dismantling project takes place according to three major phases: - Study and definition of the dismantling scenario - Dismantling site operations - Decommissioning and final state characterization. Each step is lead in agreement with safety, security and waste management. This requires analytical tools appropriate to the radiological environment and aims. In the field of security, fissile products, explosives... will be researched and quantified while occupational safety requires quantification of radiological, carcinogenic, mutagenic and reprotoxic elements such as As, Se, Cr(IV)... or even asbestos in order to follow more and more strengthened rules. For waste management, radiological and chemical quantification are necessary but must be completed by determining physical and chemical properties such as reactivity, stability or dissolution of the waste... Required level of knowledge, analytical deadline, uncertainties, limits of detection and matrix varieties depend on the decommissioning phase. Setting up a dismantling scenario requires the most possible accurate knowledge of the initial source term present in the facility, in order to establish waste management flow-sheets, define dismantling intervention modes, and prepare the associated safety demonstrations. As history is often not sufficient, in-situ investigations and off-site laboratories are necessary to assign an initial waste and radiological inventory and propose some strategy operations. When a first scenario is chosen, more detailed samplings and analyses are required to fully prepare estimates of waste volumes and categories, and define and validate the waste recovery system that would be used during the dismantling operation. As the definition of the dismantling plan takes shape, data must be more and more accurate and reliable in order to define the waste outlet. The scaling factors for the waste must be defined in order to assure the refunding of the waste. This includes complete characterizations of various matrixes, with high precision, low detection limit in a limited time of few months, as sketchy data could lead to fix inappropriate plan Once site operations begin, it is necessary to control the safety operational conditions and waste production. Measurements requirement is under the safety threshold. Matrixes are often limited to filter. The most important factor is deadline, because operations delay is costly. Finally at the end of dismantling operations, analyses must be performed to demonstrate the successful clean-up of the work site. Analytical methods with low detection limit are required. Thus, characterization appears as a graded and iterative process and is a key issue for decommissioning and dismantling operations in term of efficiency and cost. In order to face this huge analytical demand, a strategy for sampling and characterization must be developed regarding the real needs. On site measurements are usually performed with existing hand-held instruments. A basic first level of knowledge is obtained without delay, feeding the dismantling scenario. On these bases, a sampling strategy permits to select some representative specimens to be more precise, and accurate analysis is performed on off-site laboratories introducing an additional difficulty: the sampling on the site and sub-sampling in the laboratory itself. Whatever the level of sampling, aliquots are small considering the dimension of the dismantling area. This step is crucial. Sampling strategy must be optimized according to objectives (scaling factors measurement, waste level). But in the particular case of high radioactive level waste, due to security manipulation constraints, the number and mass of samples collected are limited. At the opposite for low level waste, large number of samples is collected meaning that large analytical method capacity is necessary. Optimization of the analytical plan is critical. The analytical strategy (including control of sub-sampling, analysis sequence according to analytical capability and performances, especially for pure beta emitters) developed for real case will be detailed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grid Expansion Planning for Carbon Emissions Reduction

There is a need to upgrade and expand electric power transmission and generation to meet specified renewable energy targets and simultaneously minimize construction cost and carbon emissions. Some challenges are: (1) Renewable energy sources have variable production capacity; (2) Deficiency of transmission capacity at desirable renewable generation locations; (3) Need to incorporate models of operations into planning studies; and (4) Prevent undesirable operational outcomes such as negative dispatch prices or curtailment of carbon neutral generation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Policy and Regulatory Environment for Utility-Scale Energy Storage: Bangladesh

Bangladesh has experienced significant economic growth and poverty reduction over the past several decades. Recognizing the central role electricity plays in economic development, the Government of Bangladesh (GOB) has established policies to accelerate the growth of the electric power sector. The Bangladesh power grid is transforming into one marked by declining reliance on domestic natural gas reserves and oil-based rental power plants, increasing renewable energy contribution, and shifting demand patterns. The GOB is now reconsidering its prior plans to increase the share of coal capacity in the generation mix to meet demand, shifting its focus instead to electricity imports from neighboring countries, nuclear generation, liquified natural gas imports, and domestic renewable resources such as wind and solar. However, investments in the transmission and distribution system, as well as ancillary services, have not kept pace with investments in generation resources over the past decade. Thus, Bangladesh electricity consumers still experience outages and poor power quality despite adequate installed capacity. On the demand side, population growth and industrialization have fueled steady growth in electricity consumption as efforts to expand access to electricity enabled near-universal electricity access by mid-2020. The combined changes in the mix of generation resources and patterns of electricity demand present new challenges and opportunities in operating and maintaining a reliable power system. Energy storage has the potential to help meet these challenges and accelerate Bangladesh’s energy transition. Declining costs for some energy storage technologies make them increasingly cost-effective solutions to provide a wide range of grid services. Previous analyses of energy storage in the region have identified several potential applications for storage at the bulk system level, including energy arbitrage, ancillary services, and transmission network support. The potential for storage to meet these needs depends on many factors, including physical characteristics of the power system and the policy and regulatory environments in which these energy storage assets would operate. This report applies an Energy Storage Readiness Assessment the National Renewable Energy Laboratory developed for policy makers and regulators to identify priority areas of focus as they continue to develop the appropriate suite of policies, programs, and regulations to enable storage deployment. This assessment uses a simple evaluation scheme to identify the barriers and opportunities for utility-scale energy storage within Bangladesh’s policy and regulatory environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗