Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Human factors requirements for telerobotic command and control: The European Space Agency experimental programme

Space Telerobotics research, performed under contract to the European Space Agency (ESA), concerning the execution of human factors experiments, and ultimately leading to the development of a telerobotics test bed, has been carried out since 1985 by a British Consortium consisting of British Aerospace, the United Kingdom Atomic Energy Authority and, more recently, the UK National Advanced Robotics Research Centre. The principal aim of the first study of the series was to derive preliminary requirements for a teleoperation servicing system, with reference to two mission model scenarios. The first scenario introduced the problem of communications time delays, and their likely effect on the ground-based operator in control of a manipulator system on board an unmanned servicing vehicle in Low Earth Orbit. In the second scenario, the operator was located on the NASA Orbiter aft flight deck, supervising the control of a prototype manipulator in the 'servicing' of an experimental payload in the cargo bay area. Human factors analyses centered on defining the requirements for the teleoperator workstation, such as identifying basic ergonomic requirements for workstation and panel layouts, defining teleoperation strategies, developing alphanumeric and graphic screen formats for the supervision or direct control of the manipulator, and the potential applications of expert system technology. The second study for ESA involved an experimental appraisal of some of the important issues highlighted in the first study, for which relevant human factors data did not exist. Of central importance during the second study was the issue of communications time delays and their effect on the manual control of a teleoperated manipulator from a ground-based command and control station.

Stone, Robert J.↗

An operations and command systems for the extreme ultraviolet explorer

About 40% of the budget of a scientific spacecraft mission is usually consumed by Mission Operations & Data Analysis (MO&DA) with MO driving these costs. In the current practice, MO is separated from spacecraft design and comes in focus relatively late in the mission life cycle. As a result, spacecraft may be designed that are very difficult to operate. NASA centers have extensive MO expertise but often lessons learned in one mission are not exploited for other parallel or future missions. A significant reduction of MO costs is essential to ensure a continuing and growing access to space for the scientific community. We are addressing some of these issues with a highly automated payload operations and command system for an existing mission, the Extreme Ultraviolet Explorer (EUVE). EUVE is currently operated jointly by the Goddard Space Flight Center (GSFC), responsible for spacecraft operations, and the Center for Extreme Ultraviolet Astrophysics (CEA) of the University of California, Berkeley, which controls the telescopes and scientific instruments aboard the satellite. The new automated system is being developed by a team including personnel from the NASA Ames Research Center (ARC), the Jet Propulsion Laboratory (JPL) and the Center for EUV Astrophysics (CEA). An important goal of the project is to provide AI-based technology that can be easily operated by nonspecialists in AI. Another important goal is the reusability of the techniques for other missions. Models of the EUVE spacecraft need to be built both for planning/scheduling and for monitoring. In both cases, our modeling tools allow the assembly of a spacecraft model from separate sub-models of the various spacecraft subsystems. These sub-models are reusable; therefore, building mission operations systems for another small satellite mission will require choosing pre-existing modules, reparametrizing them with respect to the actual satellite telemetry information, and reassembling them in a new model. We briefly describe the EUVE mission and indicate why it is particularly suitable for the task. Then we briefly outline our current work in mission planning/scheduling and spacecraft and instrument health monitoring.

Muscettola, Nicola↗

Development of the command data system and ground software for the SEDSAT-1 microsatellite

SEDSAT-1 is designed to be a low cost scientific satellite which is to be used to perform a minimum of five tasks which include: (1) the acquisition of a number of important parameters associated with the tethering processes from the payloads perspective (such as accelerations incurred and imaging data of the tether during deployment), (2) to act as a remote sensing platform for making measurements of the Earth's Atmosphere (allowing research to be performed in such areas as vertical lightning observation, visible light spectrography, and cloud cover studies, (3) to act as a general purpose amateur radio communication satellite relaying information back to earth, (4) to demonstrate the feasibility of the deployment in low earth orbit of advanced technology such as the Gallium Arsenide Solar Cells, Nickel Metal Hydride batteries, and multi-chip module technology and, (5) to support student's active participation in applying the disciplines of engineering and science to space-based hardware platforms. The project includes the Three-axis Accelerometer System, TAS, Experiment which is designed to report the accelerations that the satellite undergoes during the tethering operations and during the second phase of the mission when the free floating satellite comes in contact with orbit debris. The SEASIS (SEDS Earth, Atmosphere, and Space Imaging System) is another SEDSAT experiment designed to provide images of the tether during its deployment and the earth during the second phase of the mission. To control these experiments and virtually all other satellite operations the Command Data System, CDS is employed. This system utilizes a moderate complexity micro-controller controlled by tasks operating under a real-time operating system to dynamically monitor and control the satellite. The scope of this researchers efforts has been in the general area of coordinating and assisting the student researchers with the development of the CDS and ground station interfaces. This included the low level CDS hardware design and the formulization of a general software plan and schedule for both the CDS and ground station portions of the project.

Wells, B. Earl↗

Automation of Command and Data Entry in a Glovebox Work Volume: An Evaluation of Data Entry Devices

The present study was designed to examine the human-computer interface for data entry while performing experimental procedures within a glovebox work volume in order to make a recommendation to the Space Station Biological Research Project for a data entry system to be used within the Life Sciences Glovebox. Test subjects entered data using either a manual keypad, similar to a standard computer numerical keypad located within the glovebox work volume, or a voice input system using a speech recognition program with a microphone headset. Numerical input and commands were programmed in an identical manner between the two systems. With both electronic systems, a small trackball was available within the work volume for cursor control. Data, such as sample vial identification numbers, sample tissue weights, and health check parameters of the specimen, were entered directly into procedures that were electronically displayed on a video monitor within the glovebox. A pen and paper system with a 'flip-chart' format for procedure display, similar to that currently in use on the Space Shuttle, was used as a baseline data entry condition. Procedures were performed by a single operator; eight test subjects were used in the study. The electronic systems were tested under both a 'nominal' or 'anomalous' condition. The anomalous condition was introduced into the experimental procedure to increase the probability of finding limitations or problems with human interactions with the electronic systems. Each subject performed five test runs during a test day: two procedures each with voice and keypad, one with and one without anomalies, and one pen and paper procedure. The data collected were both quantitative (times, errors) and qualitative (subjective ratings of the subjects).

Steele, Marianne K.↗

Tools for automating spacecraft ground systems: The Intelligent Command and Control (ICC) approach

The practical application of scripting languages and World Wide Web tools to the support of spacecraft ground system automation, is reported on. The mission activities and the automation tools used at the Goddard Space Flight Center (MD) are reviewed. The use of the Tool Command Language (TCL) and the Practical Extraction and Report Language (PERL) scripting tools for automating mission operations is discussed together with the application of different tools for the Compton Gamma Ray Observatory ground system.

Stoffel, A. William↗

Satellite Telemetry and Command using Big LEO Mobile Telecommunications Systems

Various issues associated with satellite telemetry and command using Big LEO mobile telecommunications systems are presented in viewgraph form. Specific topics include: 1) Commercial Satellite system overviews: Globalstar, ICO, and Iridium; 2) System capabilities and cost reduction; 3) Satellite constellations and contact limitations; 4) Capabilities of Globalstar, ICO and Iridium with emphasis on Globalstar; and 5) Flight transceiver issues and security.

Huegel, Fred↗

Autonomous Satellite Command and Control Through the World Wide Web

The Automated Space System Experimental Testbed (ASSET) system is a simple yet comprehensive real-world operations network being developed. Phase 3 of the ASSET Project was January-December 1997 and is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer. (2) Support prioritized handling of multiple (PIs) Principle Investigators as well as associated payload experimenters. (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft. (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware. (5) Implement a beacon monitoring test. (6) Implement an experimental blackboard controller for space system management. (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals are examined. Significant sections of this report were also published as a conference paper. Several publications produced in support of this grant are included as attachments. Titles include: 1) Experimental Initiatives in Space System Operations; 2) The ASSET Client Interface: Balancing High Level Specification with Low Level Control; 3) Specifying Spacecraft Operations At The Product/Service Level; 4) The Design of a Highly Configurable, Reusable Operating System for Testbed Satellites; 5) Automated Health Operations For The Sapphire Spacecraft; 6) Engineering Data Summaries for Space Missions; and 7) Experiments In Automated Health Assessment And Notification For The Sapphire Microsatellite.

Cantwell, Brian↗

Effects of Command and Control Vehicle (C2V) Operational Environment on Soldier Health and Performance

The purpose of this project was to use NASA technology to assist the US Army in the assessment of motion sickness and performance of soldiers in the Command and Control Vehicle (C2V). Three different vehicle configurations were tested: oblique, (3 seats at a 20-degree angle from the direction of travel); perpendicular, (3 seats at a 90 degree angle); and 4-forward, (all seats faced forward). In all vehicles, the front seat faced forward. Sixteen men and eight women participated for 15 days: 2 days of classroom instruction; 12 days of field tests in the C2V, and 15 minutes of post-field test performance measures. Conditions for field tests were: an initial Park; four Moves (i.e., travel over a mixed terrain); and four Short-halts following movement. NASA task batteries, mood and symptom scales, and physiological data were collected during field tests. Motion sickness symptoms ranging from slight to severe were reported for all subjects. Conclusions were: (1) there was no difference between vehicle configurations; (2) there was a negative impact on crew performance and health when subjects attended to visual screens during vehicle movement; and (3) symptoms and performance degradation were not mitigated by intermittent short-halts.

Cowings, Patricia S.↗

Intelligent Command and Control Systems for Satellite Ground Operations

This grant, Intelligent Command and Control Systems for Satellite Ground Operations, funded by NASA Goddard Space Flight Center, has spanned almost a decade. During this time, it has supported a broad range of research addressing the changing needs of NASA operations. It is important to note that many of NASA's evolving needs, for example, use of automation to drastically reduce (e.g., 70%) operations costs, are similar requirements in both government and private sectors. Initially the research addressed the appropriate use of emerging and inexpensive computational technologies, such as X Windows, graphics, and color, together with COTS (commercial-off-the-shelf) hardware and software such as standard Unix workstations to re-engineer satellite operations centers. The first phase of research supported by this grant explored the development of principled design methodologies to make effective use of emerging and inexpensive technologies. The ultimate performance measures for new designs were whether or not they increased system effectiveness while decreasing costs. GT-MOCA (The Georgia Tech Mission Operations Cooperative Associate) and GT-VITA (Georgia Tech Visual and Inspectable Tutor and Assistant), whose latter stages were supported by this research, explored model-based design of collaborative operations teams and the design of intelligent tutoring systems, respectively. Implemented in proof-of-concept form for satellite operations, empirical evaluations of both, using satellite operators for the former and personnel involved in satellite control operations for the latter, demonstrated unequivocally the feasibility and effectiveness of the proposed modeling and design strategy underlying both research efforts. The proof-of-concept implementation of GT-MOCA showed that the methodology could specify software requirements that enabled a human-computer operations team to perform without any significant performance differences from the standard two-person satellite operations team. GT-VITA, using the same underlying methodology, the operator function model (OFM), and its computational implementation, OFMspert, successfully taught satellite control knowledge required by flight operations team members. The tutor structured knowledge in three ways: declarative knowledge (e.g., What is this? What does it do?), procedural knowledge, and operational skill. Operational skill is essential in real-time operations. It combines the two former knowledge types, assisting a student to use them effectively in a dynamic, multi-tasking, real-time operations environment. A high-fidelity simulator of the operator interface to the ground control system, including an almost full replication of both the human-computer interface and human interaction with the dynamic system, was used in the GT-MOCA and GT-VITA evaluations. The GT-VITA empirical evaluation, conducted with a range of'novices' that included GSFC operations management, GSFC operations software developers, and new flight operations team members, demonstrated that GT-VITA effectively taught a wide range of knowledge in a succinct and engaging manner.

Mitchell, Christine M.↗

STS-63 Commander Wetherbee Explains Five Minute Window and Mir Rendezvous

In a preflight interview, Commander James B. Wetherbee of the STS-63 Discovery mission gives an overview of the upcoming rendezvous with Mir and the five minute window in which the rendezvous takes place. Computerized simulations show the docking of the Discovery Orbiter with Mir.

Source record↗

Future Nanotube Commercialization Opportunities at the NASA Marshall Space Flight Center and the US Army Aviation and Missile Command

Nanotube technology has broad applicability to programs at both the NASA Marshall Space Flight Center (MSFC) and the US Army Aviation and Missile Command (AMCOM). MSFC has interest in applications of nanotubes as sensors and high strength lightweight materials for propulsion system components, avionic systems, and scientific instruments. MSFC is currently pursuing internal programs to develop nanotube temperature sensors, heat pipes, and metal matrix composites. In support of these application areas MSFC is interested in growth of long nanotubes, growth of nanotubes in the microgravity environment, and nanotubes fabricated from high temperature materials such as Boron Nitride or Silicon Carbide. AMCOM is similarly interested in nanotube applications which take advantage of the nanotube thermal conductance properties, high strength, and lightweight. Applications of interest to AMCOM include rocket motor casing structures, rocket nozzles, and lightweight structure and aeronautic skins.

Watson, Michael↗

The Integration of COTS/GOTS within NASA's HST Command and Control System

NASA's mission critical Hubble Space Telescope (HST) command and control system has been re-engineered with commercial-off-the-shelf (COTS/GOTS) and minimal custom code. This paper focuses on the design of this new HST Control Center System (CCS) and the lessons learned throughout its development. CCS currently utilizes more than 30 COTS/GOTS products with an additional 1/2 million lines of custom glueware code; the new CCS exceeds the capabilities of the original system while significantly reducing the lines of custom code by more than 50%. The lifecycle of COTS/GOTS products will be examined including the package selection process, evaluation process, and integration process. The advantages, disadvantages, issues, concerns, and lessons learned for integrating COTS/GOTS into the NASA's mission critical HST CCS will be examined in detail. This paper will reveal the many hidden costs of COTS/GOTS solutions when compared to traditional custom code development efforts; this paper will show the high cost of COTS/GOTS solutions including training expenses, consulting fees, and long-term maintenance expenses.

Pfarr, Thomas↗

Pilot Non-Conformance to Alerting System Commands

Instances of pilot non-conformance to alerting system commands have been identified in previous studies. Pilot non-conformance changes the final behavior of the system, and therefore may reduce actual performance from that anticipated. A simulator study has examined pilot non-conformance, using the task of collision avoidance during closely spaced parallel approaches as a case study. Consonance between the display and the alerting system was found to significantly improve subject agreement with automatic alerts. Based on these results, a more general discussion of the factors involved in pilot conformance is given, and design guidelines for alerting systems are given.

Pritchett, Amy R.↗

Pilot Non-Conformance to Alerting System Commands During Closely Spaced Parallel Approaches

Pilot non-conformance to alerting system commands has been noted in general and to a TCAS-like collision avoidance system in a previous experiment. This paper details two experiments studying collision avoidance during closely-spaced parallel approaches in instrument meteorological conditions (IMC), and specifically examining possible causal factors of, and design solutions to, pilot non-conformance.

Pritchett, Amy R.↗

STS-113 Crew Interviews: Jim Wetherbee, Commander

STS-113 Commander Jim Wetherbee is seen during this preflight interview where he gives a quick overview of the mission before answering questions about his inspiration to become an astronaut and his career path. Wetherbee outlines his role in the mission, what his responsibilities will be, what the crew exchange will be like (transferring the Expedition 6 crew in place of the Expedition 5 crew on the International Space Station (ISS)) and what the importance of the primary payload (the P1 truss) will be. He also provides a detailed account of the three planned extravehicular activities (EVAs) and additional transfer duties. He ends by offering his thoughts on the success of the ISS as the second anniversary of continuous human occupation of the ISS approaches.

Source record↗

STS-107 Crew Interviews: Rick D. Husband, Commander

STS-107 Commander Rick Husband is seen during this preflight interview, where he gives a quick overview of the mission before answering questions about his inspiration to become an astronaut and his career path. Husband outlines what his role in the mission will be, what training the crew received, what crew member responsibilities will be, particularly during launch and reentry, what day to day life will be like on an extended duration mission, and what science experiments are going to be conducted onboard. He discusses the following science experiments and instruments in detail: MEIDEX (Mediterranean Israeli Dust Experiment), SOLSE (Shuttle Ozone Limb Sounding Experiment, FREESTAR (Fast Reaction Enabling Science Technology and Research) and various student projects. Husband also touches on the importance of space research, the value of international cooperation, the reason for dual crew shifts on the mission and the role of crew members as research subjects.

Source record↗

STS-111 Crew Interviews: Ken Cockrell, Commander

STS-111 Mission Commander Ken Cockrell is seen during this preflight interview, answering questions about his inspiration in becoming an astronaut and provides an overview of the mission. He discusses the following topics: the docking of the Endeavour Orbiter to the International Space Station (ISS), the delivery of the Mobile Base System (MBS) to the ISS, the crew transfer activities (the Expedition 5 crew is replacing the Expedition 4 crew on the ISS), the planned extravehicular activities (EVAs), and the installation of the MBS onto the ISS. Cockrell provides a detailed description of the MBS and its significance for the ISS. He also describes prelaunch activities, mission training and international cooperation during the mission.

Source record↗

Applying Model-Based Reasoning to the FDIR of the Command and Data Handling Subsystem of the International Space Station

All of the International Space Station (ISS) systems which require computer control depend upon the hardware and software of the Command and Data Handling System (C&DH) system, currently a network of over 30 386-class computers called Multiplexor/Dimultiplexors (MDMs)[18]. The Caution and Warning System (C&W)[7], a set of software tasks that runs on the MDMs, is responsible for detecting, classifying, and reporting errors in all ISS subsystems including the C&DH. Fault Detection, Isolation and Recovery (FDIR) of these errors is typically handled with a combination of automatic and human effort. We are developing an Advanced Diagnostic System (ADS) to augment the C&W system with decision support tools to aid in root cause analysis as well as resolve differing human and machine C&DH state estimates. These tools which draw from sources in model-based reasoning[ 16,291, will improve the speed and accuracy of flight controllers by reducing the uncertainty in C&DH state estimation, allowing for a more complete assessment of risk. We have run tests with ISS telemetry and focus on those C&W events which relate to the C&DH system itself. This paper describes our initial results and subsequent plans.

Robinson, Peter↗