Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Distortion of homogeneous turbulence by axisymmetric strain and dilatation

Rapid distortion theory is applied to study distortion of homogeneous turbulence subject to two different axisymmetric strain modes: the axisymmetric contraction (AC, nozzle-type flow), and the axisymmetric expansion (AE, diffuser-type flow). The paper explores the differences in effects of the two axisymmetric strain modes on the anisotropy of correlations and structures of turbulence; examines the effect of dilatation on the distortion of turbulence; and provides a theoretical background for turbulence model development. It is found that velocity and vorticity fluctuations are enhanced more efficiently by contraction than by expansion; contraction produces much higher anisotropy in velocity and vorticity than expansion; root-mean-square pressure is slightly reduced during contraction, whereas it increases rapidly during expansion; and vortical structures of rodlike shape develop in a contraction flow, while disklike structures develop in an expansion flow. A simple model that reflects the dependence of turbulence evolution on structural parameters such as the Reynolds-stress anisotropy and total strain is proposed, and is shown to outperform all other models for all cases examined, regardless of the mean strain rate.

Lee, Moon Joo↗

Numerical investigations in three-dimensional internal flows

The flow in the transonic test facility was investigated using the three dimensional computational fluid dynamics techniques. The application of the full Navier-Stokes three dimensional code to the flow qualities in the contraction section of transonic wind tunnel is discussed. Initially, two dimensional solutions indicated the possibility for large secondary flow to exist as a result of the asymmetries involved in the contraction section as it is constructed. The results of a full three dimensional solution indicate that only minor pressure variations actually occur in the contraction section within any given cross flow plane. Further analysis of the three dimensional solution indicated that these slight lateral pressure gradients lead to negligible secondary flows, except within a small region in the corners within the boundary layer. On the basis of present solution, it would not be expected that any flow asymmetries and/or secondary flow present within contraction section are associated with the methods by which the contraction is implemented in its present configuration.

Rose, William C.↗

Intramuscular pressure and electromyography as indexes of force during isokinetic exercise

A direct method for measuring force production of specific muscles during dynamic exercise is presently unavailable. Previous studies indicate that both intramuscular pressure (IMP) and electromyography (EMG) correlate linearly with muscle contraction force during isometric exercise. The objective of this study was to compare IMP and EMG as linear assessors of muscle contraction force during dynamic exercise. IMP and surface EMG activity were recorded during concentric and eccentric isokinetic plantarflexion and dorsiflexion of the ankle joint from the tibialis anterior (TA) and soleus (SOL) muscles of nine male volunteers. Ankle torque was measured using a dynamometer, and IMP was measured via catheterization. IMP exhibited better linear correlation than EMG with ankle joint torque during concentric contractions of the SOL and the TA, as well as during eccentric contractions. IMP provides a better index of muscle contraction force than EMG during concentric and eccentric exercise through the entire range of torque. IMP reflects intrinsic mechanical properties of individual muscles, such as length-tension relationships, which EMG is unable to assess.

Aratow, M.↗

Determination of coronal magnetic fields from vector magnetograms

This report covers technical progress during the second year of the contract entitled 'Determination of Coronal Magnetic Fields from Vector Magnetograms,' NASW-4728, between NASA and Science Applications International Corporation, and covers the period January 1, 1993 to December 31, 1993. Under this contract SAIC has conducted research into the determination of coronal magnetic fields from vector magnetograms, including the development and application of algorithms to determine force-free coronal fields above selected observations of active regions. The contract began on June 30, 1992 and has a completion date of December 31, 1994. This contract is a continuation of work started in a previous contract, NASW-4571, which covered the period November 15, 1990 to December 14, 1991. During this second year we have concentrated on studying additional active regions and in using the estimated coronal magnetic fields to compare to coronal features inferred from observations.

Mikic, Zoran↗

NASA FAR Supplement: The NASA Supplement to the Federal Acquistion Regulation

This supplement to the Federal Acquisition Regulation (FAR) is divided into the following sections: General, Competition and Acquisition Planning, Contracting Methods and Contract Types, Socioeconomic Programs, General Contracting Requirements, Special Categories of Contracting, Contract Management, Clauses and Forms, and Agency Supplementary Regulations.

Source record↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗

Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development: Technical Results - Volume 2

Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

Source record↗

Development and Applications of a Self-Contained, Non-Invasive EVA Joint Angle and Muscle Fatigue Sensor System

The University of Maryland Space Systems Laboratory, as a participant in NASA's INSTEP program, is developing a non-invasive, self-contained sensor system which can provide quantitative measurements of joint angles and muscle fatigue in the hand and forearm. The goal of this project is to develop a system with which hand/forearm motion and fatigue metrics can be determined in various terrestrial and zero-G work environments. A preliminary study of the prototype sensor systems and data reduction techniques for the fatigue measurement system are presented. The sensor systems evaluated include fiberoptics, used to measure joint angle, surface electrodes, which measure the electrical signals created in muscle as it contracts; microphones, which measure the noise made by contracting muscle; and accelerometers, which measure the lateral muscle acceleration during contraction. The prototype sensor systems were used to monitor joint motion of the metacarpophalangeal joint and muscle fatigue in flexor digitorum superficialis and flexor carpi ulnaris in subjects performing gripping tasks. Subjects were asked to sustain a 60-second constant-contraction (isometric) exercise and subsequently to perform a repetitive handgripping task to failure. Comparison of the electrical and mechanical signals of the muscles during the different tasks will be used to evaluate the applicability of muscle signal measurement techniques developed for isometric contraction tasks to fatigue prediction in quasi-dynamic exercises. Potential data reduction schemes are presented.

Ranniger, C. U.↗

A Wind Tunnel Investigation of Three NACA 1-Series Inlets at Mach Numbers up to 0.92

Pressure distributions on three NACA 1-series inlets have been obtained in the Langley 16-Foot Transonic Tunnel. The cowl diameter ratio (ratio of cowl highlight diameter to cowl maximum diameter) was 0.85 for all three inlets. The cowl length ratio (ratio of cowl length to cowl maximum diameter) was 1.0 for two of the inlets (NACA 1-85-100) and 0.439 for the other (NACA 1-85-43.9) inlet. One of the inlets with a cowl length ratio of 1.0 had an internal contraction ratio (ratio of highlight area to throat area) of 1.009 and the other had a contraction ratio of 1.250. The inlet with a cowl length ratio of 0.439 also had an internal contraction ratio of 1.250. All three inlets had longitudinal rows of static pressure orifices on the top and bottom external cowl surfaces. The inlet with a contraction ratio of 1.009 also had a row of static pressure orifices on the side of the cowl (external surface). The two inlets with a contraction ratio of 1.250 had a longitudinal row of static pressure orifices on the diffuser surface.

Re, Richard J.↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

The Structure and Dynamics of the Solar Corona

This report covers technical progress during the third year of the NASA Space Physics Theory contract "The Structure and Dynamics of the Solar Corona," between NASA and Science Applications International Corporation, and covers the period June 16, 1998 to August 15, 1999. This is also the final report for this contract. Under this contract SAIC, the University of California, Irvine (UCI), and the Jet Propulsion Laboratory (JPL), have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model. During the three-year duration of this contract we have published 49 articles in the scientific literature. These publications are listed in Section 3 of this report. In the Appendix we have attached reprints of selected articles. We summarize our progress during the third year of the contract. Full descriptions of our work can be found in the cited publications, a few of which are attached to this report.

Mikic, Zoran↗

Grid Stiffened Structure Analysis Tool

The Grid Stiffened Analysis Tool contract is contract performed by Boeing under NASA purchase order H30249D. The contract calls for a "best effort" study comprised of two tasks: (1) Create documentation for a composite grid-stiffened structure analysis tool, in the form of a Microsoft EXCEL spread sheet, that was developed by originally at Stanford University and later further developed by the Air Force, and (2) Write a program that functions as a NASTRAN pre-processor to generate an FEM code for grid-stiffened structure. In performing this contract, Task 1 was given higher priority because it enables NASA to make efficient use of a unique tool they already have; Task 2 was proposed by Boeing because it also would be beneficial to the analysis of composite grid-stiffened structures, specifically in generating models for preliminary design studies. The contract is now complete, this package includes copies of the user's documentation for Task 1 and a CD ROM & diskette with an electronic copy of the user's documentation and an updated version of the "GRID 99" spreadsheet.

Source record↗

Supersonic Wind Tunnel Tests of a Half-axisymmetric 12 Deg-spike Inlet to a Rocket-based Combined-cycle Propulsion System

Results of an isolated inlet test for NASA's GTX air-breathing launch vehicle concept are presented. The GTX is a Vertical Take-off/ Horizontal Landing reusable single-stage-to-orbit system powered by a rocket-based combined-cycle propulsion system. Tests were conducted in the NASA Glenn 1- by 1-Foot Supersonic Wind Tunnel during two entries in October 1998 and February 1999. Tests were run from Mach 2.8 to 6. Integrated performance parameters and static pressure distributions are reported. The maximum contraction ratios achieved in the tests were lower than predicted by axisymmetric Reynolds-averaged Navier-Stokes computational fluid dynamics (CFD). At Mach 6, the maximum contraction ratio was roughly one-half of the CFD value of 16. The addition of either boundary-layer trip strips or vortex generators had a negligible effect on the maximum contraction ratio. A shock boundary-layer interaction was also evident on the end-walls that terminate the annular flowpath cross section. Cut-back end-walls, designed to reduce the boundary-layer growth upstream of the shock and minimize the interaction, also had negligible effect on the maximum contraction ratio. Both the excessive turning of low-momentum comer flows and local over-contraction due to asymmetric end-walls were identified as possible reasons for the discrepancy between the CFD predictions and the experiment. It is recommended that the centerbody spike and throat angles be reduced in order to lessen the induced pressure rise. The addition of a step on the cowl surface, and planar end-walls more closely approximating a plane of symmetry are also recommended. Provisions for end-wall boundary-layer bleed should be incorporated.

DeBonis, J. R.↗

Simulated microgravity upregulates an endothelial vasoconstrictor prostaglandin

Endothelial nitric oxide contributes to the vascular hyporesponsiveness to norepinephrine (NE) observed in carotid arteries from rats exposed to simulated microgravity. The goal of the present study was to determine whether a cyclooxygenase product of arachidonic acid also influences vascular responsiveness in this setting. Microgravity was simulated in rats by hindlimb unweighting (HU). After 20 days of HU, carotid arteries were isolated from control and HU-treated rats, and vascular rings were mounted in tissue baths for the measurement of isometric contraction. Two cyclooxygenase inhibitors, indomethacin and ibuprofen, and the selective thromboxane A(2) prostanoid-receptor antagonist, SQ-29548, had no effect on the contraction to NE in control vessels but markedly reduced contraction to NE in HU vessels. When the endothelium was removed, indomethacin no longer had any effect on the NE-induced contraction in HU vessels. In endothelium-intact vessels in the presence of indomethacin, the addition of the nitric oxide synthase inhibitor, N(G)-L-nitro-arginine methyl ester, to the medium bathing HU vessels increased the contraction to NE to the level of that of the control vessels. These results indicate that HU treatment induced two endothelial changes in carotid artery that opposed each other. Nitric oxide activity was increased and was responsible for the vascular hyporesponsiveness to NE. The activity of a vasoconstrictor prostaglandin was also increased, and attenuated the vasodilating effect of nitric oxide.

Non-NASA Center↗

Prolonged lobar hypoxia in vivo enhances the responsivity of isolated pulmonary veins to hypoxia

The hypoxic response of pulmonary vessels isolated from eight sheep whose right apical lobes (RAL) had inspired 100% N2 for 20 h was studied. The RAL of these conscious sheep inspired hypoxic gas and the remainder of the lung inspired air. During hypoxia, RAL perfusion was 33 +/- 3% of its air value, carotid arterial PO2 averaged 86 +/- 3 mm Hg and pulmonary perfusion pressure was not significantly different from the initial control period when the RAL inspired air. At the end of the hypoxic exposure, the sheep were killed, and pulmonary artery and vein rings (0.5 to 2 mm inner diameter) were isolated from both the RAL and the right cardiac lobe, which served as the control lobe (CL). Arteries from the RAL and CL did not contract in response to 6% O2/6% CO2/88% N2 (hypoxia). In contrast, RAL veins did contract vigorously in response to hypoxia, whereas CL veins did not contract or contracted only minimally. Rubbing of the endothelium or prior incubation of RAL veins with catalase (1,200 units/ml), indomethacin (10(-5) M), or the thromboxane A2/prostaglandin H2 (TxA2/PGH2) receptor antagonist, SQ 29,548 (3 X 10(-6) M) each significantly reduced the response to hypoxia. RAL veins were also found to be more reactive than CL veins to the prostaglandin endoperoxide analogue U46619. We conclude that prolonged lobar hypoxia in vivo increases the responsivity of isolated pulmonary veins to hypoxia. These contractions may result from an increase in reactive O2 species, which in turn modify production of, metabolism of, and/or tissue responsivity to TxA2/PGH2.

NASA Discipline Cardiopulmonary↗

Advanced Radioisotope Power Conversion Technology Research and Development

NASA's Radioisotope Power Conversion Technology program is developing next generation power conversion technologies that will enable future missions that have requirements that cannot be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power System (RPS) technology. Performance goals of advanced radioisotope power systems include improvement over the state-of-practice General Purpose Heat Source/Radioisotope Thermoelectric Generator by providing significantly higher efficiency to reduce the number of radioisotope fuel modules, and increase specific power (watts/kilogram). Other Advanced RPS goals include safety, long-life, reliability, scalability, multi-mission capability, resistance to radiation, and minimal interference with the scientific payload. NASA has awarded ten contracts in the technology areas of Brayton, Stirling, Thermoelectric, and Thermophotovoltaic power conversion including five development contracts that deal with more mature technologies and five research contracts. The Advanced RPS Systems Assessment Team includes members from NASA GRC, JPL, DOE and Orbital Sciences whose function is to review the technologies being developed under the ten Radioisotope Power Conversion Technology contracts and assess their relevance to NASA's future missions. Presented is an overview of the ten radioisotope power conversion technology contracts and NASA's Advanced RPS Systems Assessment Team.

Wong, Wayne A.↗

Meeting the Deadline: Why, When and How

A normative system is defined as any set of interacting agents whose behavior can usefully be regarded as norm-directed. Most organizations, and more specifically institutions, fall under this definition. Interactions in these normative systems are regulated by normative templates that describe desired behavior in terms of deontic concepts (obligations, prohibitions and permissions), deadlines, violations and sanctions. Agreements between agents, and between an agent and the society, can then be specified by means of contracts. Contracts provide flexible but verifiable means to integrate society requirements and agent autonomy. and are an adequate means for the explicit specification of interactions. From the society perspective, it is important that these contracts adhere to the specifications described in the model of the organization. If we want to automate such verifications, we have to formalize the languages used for contracts and for the specification of organizations. The logic LCR is based on deontic temporal logic. LCR is an expressive language for describing interaction in multi-agent systems, including obligations with deadlines. Deadlines are important norms in most interactions between agents. Intuitively, a deadline states that an agent should perform an action before a certain point in time. The obligation to perform the action starts at the moment the deadline becomes active. E.g. when a contract is signed or approved. If the action is not performed in time a violation of the deadline occurs. It can be specified independently what measure has to be taken in this case. In this paper we investigate the deadline concept in more detail. The paper is organized as follows. Section 2 defines the variant of CTL we use. In section 3, we discuss the basic intuitions of deadlines. Section 4 presents a first intuitive formalization for deadlines. In section 5, we look at a more complex model for deadlines trying to catch some more practical aspects. Finally, in section 6 we present issues for future work and our conciusions.

Dignum, Frank↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗