Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Testing of a High Level Waste Slurry Sampling Technique to Support Hanford Waste Processing - 17164

The Hanford Tank Operations Contractor must demonstrate the capability to adequately sample staged high-level waste feed. The sampler employed must have accuracy and precision performance that allow the Tank Operations Contractor (TOC) to meet the Waste Treatment and Immobilization Plant (WTP) Waste Acceptance Criteria Data Quality Objectives (DQO). A full-scale sampling loop was used at a test facility to develop and demonstrate sampler capability. This paper will discuss the modifications to a sampler configuration previously tested - modifications focused on the improvement of the accuracy of test results. This work targets one of the remaining technical issues with the high-level waste treatment mission at Hanford. The sampling method employed must support both Tank Operations and Waste Treatment and Immobilization Plant requirements. To facilitate information transfer between the two facilities the mixing and sampling demonstrations are led by the TOC's Chief Technology Office in conjunction with the One System Integrated Project Team. Results of the testing showed that performance of the Isolok{sup R} sampler, chosen for implementation, can be greatly improved by modifying the systems configuration to provide accurate, repeatable results for Hanford's simulated high level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Liquid Waste Operations Lifecycle Savings through a Lean Business System at the Savannah River Site - 17245

Savannah River Remediation (SRR) was contracted by the U.S. Department of Energy (DOE) to manage its liquid waste project at the Savannah River Site. The liquid waste project is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51 one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for lower radioactive decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. At SRR, a Lean business management system was adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. With yearly escalation and flat budgets, continuous improvement is taking on a larger role - improving the work accomplished for each dollar. This paper focuses on the program results achieved to date, including the lifecycle savings identified through the Rapid Improvement Event (RIE) process. The RIE process is a Lean tool which creates a cross-functional team to analyze, develop and implement improvements for a given process. DOE-EM has recently emphasized the value of contractor's continuous improvement programs through their implementation of Plan of Action and Milestone (POAM): Goal 2 (Increase Efficiency/Improve Performance) Reduce EM Operations Cost in FY16. POAM Goal 2 was a FY 16 effort to achieve 5% cost savings across most programs. This past year's cost savings initiatives will likely become a trend as DOE and its contractors look to do more with less. In support of our own business objectives, as well as, DOE's motivation to improve efficiencies, SRR has held over one hundred formal Lean events and dozens of 5S events that have driven improvement across the Project, including tank closure and production facilities. These improvements have significantly reduced the time required to process material and achieve the overall goal of hazard reduction and tank closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing the Shift Technical Engineer Pipeline to Develop the Next Generation of Engineers - 17354

As the liquid waste contractor for the U.S. Department of Energy's (DOE) Savannah River Site (SRS), Savannah River Remediation (SRR) is responsible for safely treating and dispositioning approximately 35 million gallons of liquid waste stored at SRS. To achieve this mission, SRR manages and operates several complex nuclear facilities. These nuclear facilities include the H and F Tank Farms, the Defense Waste Processing Facility (DWPF), and the Saltstone Processing and Disposal Facility. To support the operations of these complex nuclear facilities, a Shift Technical Engineer (STE) is stationed for every shift. The STE is the sole Engineering Organization representative on-shift and serves as a direct technical resource for operations, including safety basis interpretation, process monitoring and prompt troubleshooting support. The training and qualification for an STE is more intensive than for typical technical staff personnel at SRR, involving additional classes, under-instruction watches, demonstration of practical factors, and culminating in an intense oral board examination. Like many other contractors in the DOE complex, SRR faces the challenge of preparing a significant number of new generation engineers to take the place of an aging workforce. Beyond the traditional training to establish minimum technical qualifications, SRR has established a number of initiatives aimed at accelerating the process of preparing early career engineers to replace experienced senior engineers. These initiatives include an internal rotational program, technical exchange activities with companies at other DOE sites, and an STE pipeline. The STE role provides a unique mechanism for select, early career engineers to gain in-depth knowledge and significant responsibility normally not achieved until much later in their careers. Once qualification is complete, the engineers perform the STE duties, providing technical support for nuclear facility operations. In addition, creating an STE pipeline, where promising young engineers are continually being qualified to replace the on-shift STEs, provides the company with a source of experienced engineers with in-depth technical knowledge as well as valuable experience interfacing with operations and other facility support groups. This paper will discuss the STE position, the qualification process, and how SRR is using the STE qualification pipeline to benefit both the company and the individual engineer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving high level waste solids mobilization and transfer through Hanford double-shell tanks - 15099

The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. Efficient and effective handling of solid radioactive waste is essential to the successful completion of River Protection Project (RPP) mission and the Department of Energy's Hanford site. The TOC ust transfer over 416 million liters (110 million gallons) of HLW slurry through a complex system of 28 double shell tanks (DSTs) of approximately 3.8 million liters (1 million gallons) each as it is staged and delivered to the WTP. Through the use of scaled tanks and non-radioactive simulants, the TOC has identified operational methodologies for mixer pumps that enhance the movement of the solids through the DST system which will minimize the amount of solids remaining for final tank closeout. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The container database? life-cycle management of container inventories at the Hanford site - 15131

Since 2011 the Department of Energy (DOE) Richland Operations Office (DOE-RL) and their contractor CH2M HILL Plateau Remediation Company (CH2M HILL) have worked together to develop a database that provides life-cycle management and control of all CH2M HILL-managed Department of Transportation (DOT) Type A and Industrial Packaging (IP) container assets at the Hanford Site. This powerful tool provides CH2M HILL with the capability to centrally manage container procurement specifications; maintenance requirements; certificates of conformance; certification and test reports; as-built drawings; and information on container status, location, and ownership; and any special characteristics of container assets. The database was originally developed to provide ready access to Type A and IP container supplier and manufacturer Certificates of Conformance (CoCs) and related certification documentation to support onsite shipments in compliance with the Hanford Site Wide Transportation Safety Document (TSD), DOE/RL-2001-0036, as well as regulatory or other requirements. The information is accessed through active links to these documents within the database itself. The database has grown to include links to external supplementary information to support onsite shipments, such as links to authorized tie downs for each package type, approved packaging and transportation commodities, and approved shipping authorizations, and packaging management procedures and checklists. The database is a living databank that is easily tailored to meet user- and site-specific needs as they are identified. It is currently being expanded to include the inventories of all Hanford contractors, as well as other packaging assets, such as specialty drums and packaging commodities. Each upgrade brings efficiencies and cost savings, not only in container inventory management, but also in the areas of work control, waste packaging, waste transportation, and regulatory compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inspection Technology Advancements for Hanford Double Shell Tank Integrity Verification - 16150

The Hanford double-shell tanks (DSTs) were constructed in southeastern Washington State between 1968 and 1986 to store nuclear waste. Most of the tank waste came from the Hanford nuclear weapons program, which has been stopped for more than 25 years. The tanks will be needed for many years to come until suitable vitrification and permanent storage solutions are developed. These tanks are nominally 45 ft. deep from the dome peak to the floor. The inner tank is nominally 75 ft. dia. and the outer tank is nominally 80 ft. dia., leaving a 2.5 ft. annulus between the two side tank walls. The waste management program (under direction of Washington River Protection Solutions, WRPS) manages inspections of these DSTs from the annulus to justify their continued safe service and to avoid the high cost of new replacement tanks. Over time, the Hanford Tank Farm contractors, currently WRPS, have increased their ultrasound inspections of these tanks. Pacific Northwest National Laboratory has worked with the Hanford Tank Farm contractors for more than 15 years to advance applicable tank nondestructive inspection technology for improved performance and cost reduction. Past, present, and planned technology advancements are addressed in this paper, including tank wall ultrasonic testing examination, extreme value statistical analysis, phased array for the tank wall, transmit/receive tandem synthetic aperture focusing technique knuckle examination, and electromagnetic acoustic transducer screening of the tank wall including mill-scale compensation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Readiness Activities for the Direct Feed Low Activity Waste (DFLAW) Program - 16221

The WTP is a one-of-a-kind nuclear waste treatment facility being designed and constructed for the DOE by Bechtel National, Inc. (BNI) and principal subcontractor URS-AECOM, to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), has the responsibility to retrieve, stage, pretreat, and deliver the pretreated feed directly to the WTP Low-Activity Waste Vitrification Facility, scope referred to as Direct Feed Low Activity Waste (DFLAW). Extensive planning is in progress under the auspices of One System, an effort with joint participation by WTP and TOC personnel. To support an integrated approach to readiness for the DFLAW Program, an Integrated Operational Readiness Committee (IORC) was established to contribute to a safe and effective operational readiness of the WTP. The IORC, an advisory committee, comprising representatives from BNI, WRPS, and the Hanford interfacing partners for WTP operations, Mission Support Alliance (MSA) and CH2M HILL Plateau Remediation Company (CHPRC). In addition, an Operational Readiness (OR) workshop was conducted with several objectives accomplished to support an integrated approach to readiness with specific focus on the management of interfaces between the various contractors and facilities. This culminated in the development of a readiness strategy document called the Operational Readiness Support Plan (ORSP). This ORSP describes the joint approach to WTP startup operating in the DFLAW configuration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Remediation Project at the DOE Bannister Site - 16280

The Department of Energy Kansas City office has operated the Bannister site with a variety of contractors since the late 1940's. This facility has had a number of missions, some of which included using natural and depleted uranium. In order to prepare for the demolition of the site, ANTECH was contracted to perform radiometric surveys of the areas where these uranium operations took place. In the process of performing these surveys, areas with low levels of fixed radioactive contamination were identified; ANTECH then remediated these areas using a variety of techniques. In all areas surveyed, the only radioactive contaminant of interest was uranium and members of its decay chain. In no cases were other radionuclides found. The detection equipment used for the surveys included a Ludlum model 239- 1F Floor Monitor, a Ludlum 2360 Alpha Beta Data Logger Scaler/Ratemeter, and an ORTEC IDM-200-V High Purity Germanium Detector. The Ludlum instruments were used for bulk surveys and the ORTEC instrument was used to determine an accurate radioactive background spectra and subsequent spectra for areas where radioactive contamination was identified. Contamination was located on concrete floors and columns, cinder block walls, steel beams, inside ductwork and in floor drain piping. After these areas were identified, a number of methods were used to remove the contamination for disposal including scabbling, core drilling and wholesale removal. Extensive use of Pentek scabbling equipment on the concrete sections proved to be very effective at removing the contaminated layer. Upon completion, the waste materials were consolidated and packaged in a strong tight sea land container and shipped to the Energy Solutions waste facility in Utah. The completed work at the Bannister site serves as an example and demonstration of an effective and comprehensive decommissioning project. It involved the integration of a variety of decommissioning activities all executed and managed by a single contractor. These included radiometric measurement surveying using a variety of detection technologies to identify and locate uranium contamination, decontamination and removal of low level radioactive waste including some deconstruction activities and finally the management of low level radioactive waste including packaging, consignment and shipping of waste to a remediation site. The effective and efficient identification and removal of radioactive contamination at the Bannister site has contributed to the overall goal of returning the site to unrestricted use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Nuclear Legacy Liabilities Program - Ten Years of Progress and Achievements - 16456

Nuclear legacy liabilities have resulted from more than 60 years of nuclear research and development carried out on behalf of Canada. The liabilities are located at Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories in Ontario and Whiteshell Laboratories in Manitoba, as well as three shutdown prototype reactors in Ontario and Quebec that are being maintained in a safe storage state. Estimated at about $10.6 billion (B) (current day Canadian dollars), these liabilities consist of disused nuclear facilities and associated infrastructure, a wide variety of buried and stored waste, and contaminated lands. The Government of Canada established the Nuclear Legacy Liabilities Program (NLLP) in 2006 to implement a long-term strategy to safely and cost-effectively reduce risks and liabilities, and invested approximately $1.4 B over the 10-year duration of the Program to implement the strategy. Risks and liabilities were reduced through projects and activities that decommissioned and removed out-dated facilities, remediated lands affected by past practices, and improved the management of legacy radioactive waste. The NLLP formally ended in September 2015 when the restructuring of AECL's Nuclear Laboratories was completed, and a Government-owned Contractor-operated (GoCo) management model came into effect. The nuclear decommissioning and waste management work that was previously carried out under the NLLP was transitioned into the new GoCo contract. Over the 10-year duration of the NLLP, the Program achieved good progress in addressing health, safety and environmental priorities, reducing liabilities, and providing the studies, plans and facilities that will be needed to enable subsequent phases of the strategy. The NLLP provided a strong basis for the GoCo contractor to accelerate risk and liability reduction at AECL sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Workforce for the Nuclear Industry - 16513

The US Department of Energy's Office of Environmental Management (DOE-EM) oversees one of the largest environmental restoration projects in the world. DOEEM's labor statistics show that 91% of EM employees are 40 years old or older and only 1% of its workforce is under 30 years old. In addition, it is estimated that within the next three years, DOE-EM will lose as much as 30-35% of its technical workforce due to retirement. DOE-EM is responding to the aging workforce problem by proactively partnering with universities to train and develop the new generation for the environmental restoration workforce. In 2007, DOE-EM and Florida International University's Applied Research Center (ARC) established the DOE-FIU Science and Technology Workforce Development Program. This is an innovative program designed to train and mentor FIU students in STEM (science, technology, engineering, and math) disciplines and provides them with career paths in environmental restoration and the nuclear industry. The selected students (called DOE Fellows) perform hands-on environmental remediation research and participate in internships at DOE Headquarters, DOE sites, national laboratories, and DOE contractors. Upon graduation and completion of the DOE fellowship, DOE Fellows pursue employment opportunities with DOE and its contractors. In addition, DOE-EM has also established a Minority Serving Institution STEM program targeting STEM students at Historically Black Colleges and Universities (HBCUs). Both programs have the purpose of enhancing educational and training opportunities to minority students. DOE Fellows support DOE-EM research at FIU's ARC. The Fellows work side by side with ARC's scientists and engineers in the research of technologies and methodologies in the areas of high level waste/waste disposal and treatment, soil and groundwater remediation and modeling, deactivation and decommissioning (D and D) technology test and evaluation, and engage in the development of information technology systems in support of the DOE-EM environmental remediation mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Safety Culture by Strengthening Leadership Skills - 16563

As a primary contractor for the U.S. Department of Energy (DOE), CH2M HILL Plateau Remediation Company (CH2M) is managing a team of approximately 1,400 employees at the Hanford Site in Southeast Washington. The work on this 10-year, $5.7 billion contract ranges from design and construction to decommissioning and cleanup. In 2013, CH2M began the second half of its contract and expanded its leadership development program to focus on succession planning and strengthening the leadership skills of its employees. The goal is to create and sustain qualified leaders to lead the Hanford cleanup mission today and into the future. CH2M launched the Leadership Impact Initiative, a training program modeled from best practices used at other CH2M projects, including the Idaho Cleanup Project. Based on the results of a CH2M HILL Plateau Remediation Company site-wide safety culture survey, the company developed an improvement strategy focused on leadership development with emphasis on the front-line leadership. The strategy stresses core leadership principles and skill development to help managers more effectively engage the workforce. The two-day workshop gives employees the opportunity to build leadership on the job in an audience of their peers. CH2M expanded the workshops to include employees from all levels of the organization, including bargaining unit employees. The workshops are reinforced at quarterly all-manager meetings, communications among team members and regular sharing of lessons learned and experiences in the field. The Leadership Impact Initiative advances CH2M's vision of quality leadership and project delivery anchored by health and safety performance excellence. Since 2013, CH2M hosted more than 25 Leadership Impact Initiative workshops, reaching approximately 500 participants. Meanwhile, the company achieved the best safety record since the start of its contract, and results from its 2015 safety culture survey show improvements in the safety climate. A DOE assessment of the CH2M worker health and safety culture for the Voluntary Protection Program (VPP) found the workshop was a contributing factor to the contractor achieving VPP Star and VPP Star of Excellence Status. This paper summarizes the strategy behind the leadership development program, the outcomes and its relevance for other companies, particularly those on DOE Environmental Management decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Backyards and Bedrooms: Challenges and Successes in Gaining Access to Homes for Radiological Testing - 18204

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale properties - primarily residential - in the Municipality of Port Hope for the presence or absence of historic low-level radioactive waste. The Property Radiological Survey began in 2012 and is being conducted in five campaigns with between 450 and 1,250 properties in each campaign. The survey begins with radon monitoring, followed by interior and exterior gamma radiation tests, and concludes with exterior borehole drilling/soil sampling. The full suite of tests take approximately 18 - 24 months to complete at each property. This paper will describe the communications strategy implemented to obtain consent from thousands of property owners for CNL's contractor to conduct radiological testing in private living spaces such as bathrooms, bedrooms and closets, as well as front yards, backyards and outbuildings. This strategy incorporates tactics used to secure consent from residents who are reluctant to participate in the survey for reasons including privacy issues, family situations, life events and misapprehensions about the survey and/or the PHAI in general. The paper will include information about how residents' concerns are addressed, the stepped approach to securing access from owners who do not respond to repeated attempts at contact, and the importance of close coordination with the contractor to ensure that all components of the investigations are aligned so that work is conducted in a safe, timely and systematic manner. The authors will also describe the process for keeping the regulator and the municipality informed of survey outreach efforts, challenges and successes, and will outline the process for notifying the approximately 800 owners of properties on which historic low-level radioactive waste is expected to be identified and transitioning those owners from the survey to the remediation phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗