Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Human Factors Evaluation of Advanced Electric Power Grid Visualization Tools

This report describes initial human factors evaluation of four visualization tools (Graphical Contingency Analysis, Force Directed Graphs, Phasor State Estimator and Mode Meter/ Mode Shapes) developed by PNNL, and proposed test plans that may be implemented to evaluate their utility in scenario-based experiments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Contingency maneuver strategies for the Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP)

The Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP) is a polar-orbiting spacecraft designed to measure total ozone levels in the Earth's atmosphere. The nominal mission orbit is a 955-kilometer circular Sun-synchronous orbit with an ascending node mean local crossing time (MLT) between 11:02 a.m. and 11:25 a.m. These two mean local ascending node times constitute the boundaries of the MLT box for this mission. The MLT boundaries were chosen to maintain the Sun-to-Earth-to-vehicle orbit-normal (SVN) angle within a preselected set of seasonally independent boundaries. Because the SVN angle is seasonally dependent, but the MLT is not, contingency options for correcting the MLT of orbital states that fall outside of the required MLT range become time dependent. This paper focuses on contingency orbit adjustment strategies developed at the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) during the mission planning phase of TOMS-EP. Time-dependent delta-V strategies are presented for correcting mission orbit states lying outside of the MLT range. Typically, passive control of the MLT drift rate can be used to restore the orbit state to the required MLT before a seasonal violation of SVN angle constraints can occur. Passive control of the MLT drift rate is obtained through adjustment of the semimajor axis and/or the inclination. The time between initial arrival on orbit at an 'out-of-the box' MLT state and violation of the SVN angle constraints is always less than or equal to 1 year. The choice of which parameter(s) to adjust is dictated by the duration of this time period, the desired mission lifetime, the delta-V cost, and operational constraints.

Kestler, James↗

Optimal Energy Storage System and Smart Switch Placement in Dynamic Microgrids With Applications to Marine Energy Integration

Here this paper studies a dynamic microgrid (DMG) planning problem that places energy storage systems (ESSs) and smart switches (SSWs) optimally in the system. We apply the proposed methodology to applications concerning marine renewable energy (MRE). MRE is an emerging clean energy resource with enormous capacity but volatile and intermittent energy output profiles. Innovative grid-integration technologies designed to enhance the reliability of an MRE-integrated system are needed. However, there are still limited studies in this regard. Existing works have shown the promising prospect of using a dynamic microgrid (DMG) operational concept to accommodate renewable resources in distribution systems, but they usually assume fixed ESS and SSW installations. To further improve the operational flexibility of DMGs, we propose a DMG planning methodology that optimally places ESSs and SSWs so that a DMG with MRE is warranted with proper resource adequacy and topological flexibility in both the contingency and normal operations. We use realistic case studies based on a real-world distribution network and the U.S. Department of Energy's MRE dataset to verify the value and validity of the proposed work.

25 ENERGY STORAGE↗

Automated control of hierarchical systems using value-driven methods

An introduction is given to the Value-driven methodology, which has been successfully applied to solve a variety of difficult decision, control, and optimization problems. Many real-world decision processes (e.g., those encountered in scheduling, allocation, and command and control) involve a hierarchy of complex planning considerations. For such problems it is virtually impossible to define a fixed set of rules that will operate satisfactorily over the full range of probable contingencies. Decision Science Applications' value-driven methodology offers a systematic way of automating the intuitive, common-sense approach used by human planners. The inherent responsiveness of value-driven systems to user-controlled priorities makes them particularly suitable for semi-automated applications in which the user must remain in command of the systems operation. Three examples of the practical application of the approach in the automation of hierarchical decision processes are discussed: the TAC Brawler air-to-air combat simulation is a four-level computerized hierarchy; the autonomous underwater vehicle mission planning system is a three-level control system; and the Space Station Freedom electrical power control and scheduling system is designed as a two-level hierarchy. The methodology is compared with rule-based systems and with other more widely-known optimization techniques.

Pugh, George E.↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Manual Crew Override of Vehicle Landings Following G-Transitions

BACKGROUND Manual control during exploration spaceflight consists of both planned automated supervisory control and unplanned crew override. This crew override capability is critical to enable overall mission success during landing contingencies. However, the introduction of manual override capabilities must be implemented to enable crews to mitigate risks introduced by human error. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. While training and landing aids enable successful landing through disorientation, these adaptive changes may increase cognitive demand that needs to be accounted for in the manual control strategy. It is important to characterize these effects as soon as possible following the G-transition to develop appropriate countermeasures. METHODS In this study, we will examine operational piloting tasks following International Space Station (ISS) missions in a simulated lunar landing using a six-degree-of-freedom (6DOF) motion base. The motion-based simulation will be implemented in our laboratory at the Johnson Space Center (JSC) and will be available within hours following the return from commercial crew landings. The primary goals of this study are (1) to understand the impact of spaceflight on crew ability to perform manual crew override tasks, (2) to examine how adaptive changes in vestibular and cognitive function relate to changes in manual crew override proficiency, and (3) compare performance during late “just-in-time” on-board training with early post-flight crew performance. The impact of spaceflight on piloting capability will be assessed from pre- versus post-flight changes in crewmembers assigned to either short duration (< 30 day) or long duration (~6- month) missions to the International Space Station (ISS). Individual differences in post-flight vestibular and cognitive changes include motion sickness reports, measures of tilt motion perception accuracy and precision, and dual-task tracking. During the 6DOF lunar simulation, the crew will manually takeover attitude and rate-of-descent to the nominal or re-designated landing aim point during the approach phase. The outcome measures for the lunar crew override tasks will be the percent time maintaining actual vehicle states, e.g., attitude and rate-of-descent, within recommended guidance during the landing approach, number and maximum deviation outside limits, and root mean square error (RMSE). Given that “just-in-time” (JIT) training is an operational expectation for the Human Landing System (HLS) program, all participants will perform late inflight JIT training for each manual crew override task in which they will participate. Crew proficiency will be captured inflight during JIT training that will be implemented on a laptop with hand controllers to allow the crewmember to practice the landing task procedures like the approach implemented for JIT training with Shuttle landing and ISS telerobotic tasks. COUNTERMEASURE UPDATES The lunar lander simulation has been implemented onto a two-laptop display system where subjects select from alternative landing points, based upon avoiding hazards that the on-board system identifies during the landing. The subject makes inputs using a rotational hand controller (i.e., joystick) and a translational hand controller, which are processed by simulated vehicle dynamics to update the vehicle attitude and rate of descent. Subjects will utilize a combination of flight, situation, and status displays to monitor the state of the simulated vehicle. The simulation exports tilt and translation movements to a 6DOF motion base synced to visual movements and provides representative vestibular cues to the subject while performing the task inside an enclosed cabin featuring a simulated lunar out-the-window view and a heads-down lander cockpit view. RELEVANCE This project will deliver an operational demonstration of crew override capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew override performance will help better characterize the manual control risks associated with sensorimotor alterations. The inclusion of “just-in-time” on-board training will ensure we are characterizing changes in override proficiency with this expected countermeasure in place. ACKNOWLEDGEMENTS: The authors acknowledge contributions from Draper, HLS Joint Test Panel, Crew HLS Interfaces for Piloting Working Group, and Dynamic Skills Trainer (DST) Lab toward the development of the lunar landing simulation. This project is funded by the Human Health Countermeasures Element.

Austin M Bollinger↗

Manual Crew Override of Vehicle Landings Following G-Transitions

BACKGROUND Manual control during exploration spaceflight consists of both planned automated supervisory control and unplanned crew override. This crew override capability is critical to enable overall mission success during landing contingencies. However, the introduction of manual override capabilities must be implemented to enable crews to mitigate risks introduced by human error. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. While training and landing aids enable successful landing through disorientation, these adaptive changes may increase cognitive demand that needs to be accounted for in the manual control strategy. It is important to characterize these effects as soon as possible following the G-transition to develop appropriate countermeasures. METHODS The following study seeks to inform the risk associated with altered sensorimotor and vestibular function impacting critical mission tasks. We aim to characterize the effects of short and long-duration weightlessness on manual control following G-transitions using simulated lunar landing on a six-degree-of-freedom (6DOF) motion base, a fixed base simulation, and a supervisory control tablet task. The primary goal is to understand the impact of spaceflight on crew ability to perform manual crew override and supervisory control. This aim will be assessed by comparing pre- versus postflight simulation performance in crewmembers assigned to either short duration (< 30 day) or long duration (~6- month) missions to the International Space Station (ISS). We hypothesize there will be postflight increases in the percent time that pilots are outside of the acceptable range for recommended vehicle state parameters and the reaction time for secondary cognitive tasks. Ground-based control subjects, who are demographically matched to the crew considering age (± 5 years) and gender, will undergo the same testing schedule as the crew to examine the effects of flight phase independent of microgravity exposure. The second aim is to examine how adaptive changes in vestibular and cognitive function relate to changes in manual crew override proficiency. Crew performance for a sensorimotor perceptual test battery will evaluate motion perception tracking, roll nulling, and/or vection sensitivity using the 6DOF motion base. We hypothesize that a higher severity of vestibular alterations will be associated with increased percent time outside of guidance limits. Motion sickness severity and sleepiness will also be evaluated. To determine the impact of “just-in-time” training, the third aim seeks to compare performance during on-board lunar landing tasks conducted late in-flight to early postflight. We hypothesize that proficiency on the “just-in-time” laptop trainer late in mission will be positively correlated with early postflight proficiency on the same task. The final aim will establish assessments of performance, training protocols, and the learning progression in a ground-control cohort of first-time users. RESULTS The assessment of the learning progression associated with the piloting task on the motion base system with thirty ground subjects will be reported. Learning curves will be established across four distinct sessions and within session considering trial difficulty. The difficulty of the landing task can be modulated with the landing divert distance and cross or downrange difficulty. Results may include changes in performance across multiple trials of a multi-attribute lunar tablet supervisory control task. Preliminary investigations of eighteen subjects who completed vestibular threshold and motion perception tasks offer expected performance ranges for upcoming preflight crew evaluations. The results yielded an average roll threshold of 0.46 ± 0.30 deg/s and an average roll nulling root mean square error performance of 2.52 ± 0.52 deg/s. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the manual control risks associated with sensorimotor alterations. Ground testing will evaluate learning progression, refine training protocols, and serve as a control cohort for comparisons to crew performance. ACKNOWLEDGEMENTS: The authors acknowledge contributions from Draper, the Dynamic Skills Trainer (DST) Lab, and the Software, Robotics, and Simulation Division toward the development of the lunar landing simulation platforms. This project is funded by the Human Health Countermeasures Element.

Hannah M. Weiss↗

High-Performance Computing for Advanced Smart Grid Applications

The power grid is becoming far more complex as a result of the grid evolution meeting an information revolution. Due to the penetration of smart grid technologies, the grid is evolving as an unprecedented speed and the information infrastructure is fundamentally improved with a large number of smart meters and sensors that produce several orders of magnitude larger amounts of data. How to pull data in, perform analysis, and put information out in a real-time manner is a fundamental challenge in smart grid operation and planning. The future power grid requires high performance computing to be one of the foundational technologies in developing the algorithms and tools for the significantly increased complexity. New techniques and computational capabilities are required to meet the demands for higher reliability and better asset utilization, including advanced algorithms and computing hardware for large-scale modeling, simulation, and analysis. This chapter summarizes the computational challenges in smart grid and the need for high performance computing, and present examples of how high performance computing might be used for future smart grid operation and planning.

computational challenges↗

Autonomous Medical Care for Exploration

The goal of Autonomous Medical Care (AMC) is to ensure a healthy, well-performing crew which is a primary need for exploration. The end result of this effort will be the requirements and design for medical systems for the CEV, lunar operations, and Martian operations as well as a ground-based crew health optimization plan. Without such systems, we increase the risk of medical events occurring during a mission and we risk being unable to deal with contingencies of illness and injury, potentially threatening mission success. AMC has two major components: 1) pre-flight crew health optimization and 2) in-flight medical care. The goal of pre-flight crew health optimization is to reduce the risk of illness occurring during a mission by primary prevention and prophylactic measures. In-flight autonomous medical care is the capability to provide medical care during a mission with little or no real-time support from Earth. Crew medical officers or other crew members provide routine medical care as well as medical care to ill or injured crew members using resources available in their location. Ground support becomes telemedical consultation on-board systems/people collect relevant data for ground support to review. The AMC system provides capabilities to incorporate new procedures and training and advice as required. The on-board resources in an autonomous system should be as intelligent and integrated as is feasible, but autonomous does not mean that no human will be involved. The medical field is changing rapidly, and so a challenge is to determine which items to pursue now, which to leverage other efforts (e.g. military), and which to wait for commercial forces to mature. Given that what is used for the CEV or the Moon will likely be updated before going to Mars, a critical piece of the system design will be an architecture that provides for easy incorporation of new technologies into the system. Another challenge is to determine the level of care to provide for each mission type. The level of care refers to the amount and type of care one will render based on perceived need and ability. This is in contrast to the standard of care which is the benchmark by which that care is provided. There are certainly some devices and procedures that have unique microgravity or partial gravity requirements such that terrestrial methods will not work. For example, performing CPR on Mars cannot be done in exactly the same way as on Earth because the reduced gravity causes too large a reduction in the forces available for effective compression of the chest. Likewise, fluid behavior in microgravity may require a specialized water filtration and mixing system for the creation of intravenous fluids. This paper will outline the drivers for the design of the medical care systems, prioritization and planning techniques, key system components, and long term goals.

Johnson-Throop, Kathy A.↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Decomposition of Sources of Errors in Seasonal Streamflow Forecasting over the U.S. Sunbelt

Seasonal streamflow forecasts, contingent on climate information, can be utilized to ensure water supply for multiple uses including municipal demands, hydroelectric power generation, and for planning agricultural operations. However, uncertainties in the streamflow forecasts pose significant challenges in their utilization in real-time operations. In this study, we systematically decompose various sources of errors in developing seasonal streamflow forecasts from two Land Surface Models (LSMs) (Noah3.2 and CLM2), which are forced with downscaled and disaggregated climate forecasts. In particular, the study quantifies the relative contributions of the sources of errors from LSMs, climate forecasts, and downscaling/disaggregation techniques in developing seasonal streamflow forecast. For this purpose, three month ahead seasonal precipitation forecasts from the ECHAM4.5 general circulation model (GCM) were statistically downscaled from 2.8deg to 1/8deg spatial resolution using principal component regression (PCR) and then temporally disaggregated from monthly to daily time step using kernel-nearest neighbor (K-NN) approach. For other climatic forcings, excluding precipitation, we considered the North American Land Data Assimilation System version 2 (NLDAS-2) hourly climatology over the years 1979 to 2010. Then the selected LSMs were forced with precipitation forecasts and NLDAS-2 hourly climatology to develop retrospective seasonal streamflow forecasts over a period of 20 years (1991-2010). Finally, the performance of LSMs in forecasting streamflow under different schemes was analyzed to quantify the relative contribution of various sources of errors in developing seasonal streamflow forecast. Our results indicate that the most dominant source of errors during winter and fall seasons is the errors due to ECHAM4.5 precipitation forecasts, while temporal disaggregation scheme contributes to maximum errors during summer season.

Decomposition↗

Development of a verification program for deployable truss advanced technology

Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

Dyer, Jack E.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Entry Debris Field Estimation Methods and Application to Compton Gamma Ray Observatory Disposal

For public safety reasons, the Compton Gamma Ray Observatory (CGRO) was intentionally deorbited on June 4, 2000. This deorbit was NASA's first intentional controlled deorbit of a satellite, and more will come including the eventual deorbit of the International Space Station. To maximize public safety, satellite deorbit planning requires conservative estimates of the debris footprint size and location. These estimates are needed to properly design a deorbit sequence that places the debris footprint over unpopulated areas, including protection for deorbit contingencies. This paper details a method for estimating the length (range), width (crossrange), and location of entry and breakup debris footprints. This method utilizes a three degree-of-freedom Monte Carlo simulation incorporating uncertainties in all aspects of the problem, including vehicle and environment uncertainties. The method incorporates a range of debris characteristics based on historical data in addition to any vehicle-specific debris catalog information. This paper describes the method in detail, and presents results of its application as used in planning the deorbit of the CGRO.

Mrozinski, Richard B.↗

Servicing operations for the SIRTF Observatory at the Space Station

This paper describes the servicing requirements, plans, and proposed Space Station-based servicing operations for the Space Infrared Telescope Facility (SIRTF) Observatory. SIRTF is a cryogenically-cooled, long-life, one meter class space telescope which will be operated by NASA as a free-flying observatory for infrared astronomy, in the mid-1990's. To achieve its 5-year lifetime requirement (10 year goal), SIRTF must be replenished periodically with cryogenic helium and have its life-limited modular subsystems replaced; capability for contingency repair of warm components will also be provided in the Observatory design. A general description of the SIRTF Observatory is given, including options for the support systems (spacecraft). The overall servicing philosophy and plans are addressed with scheduling and needed support elements described. A proposed Space Station-based servicing scenario is described, including orbital transfer, servicing and checkout operations. A detailed description and timeline for liquid helium replenishment operations is provided, including a conceptual design and technology development program for the cryogenic helium transfer dewar (tanker). Finally, a preliminary SIRTF spares/logistics philosophy is outlined, including tradeoffs to be considered.

Wiltsee, Christopher B.↗

ARCADES: analysis of risk from cyberattack against defensive strategies for the power grid

In this study, the authors introduce ARCADES (Analysis of Risk from Cyberattack against DEfensive Strategy), a technique to systematically explore the cybersecurity defence strategies based on contingency rankings in power systems. While cybersecurity defensive standards exist, these approaches are primarily based on expert opinions, rather than systematic studies of risk. ARCADES presents an approach to identify improved cybersecurity defensive strategies based on a graph‐based cyber‐physical security model that is evaluated by resistance‐distance metrics and then prioritised based on contingency analysis studies of the system. This study also proposed a technique that identifies the most critical cybersecurity mechanisms to protect the power grid. Planning and operation: those two applications for cybersecurity on power grid mainly explored in this study. For planning, a systematic method is developed to verify the effectiveness of security strategies and for operation, prioritised the security mechanism for auditing and monitoring purpose. As a case study, they analyse the IEEE‐14 bus, IEEE‐30 bus, and IEEE‐118 bus systems, observe the defensive strategies, and calculate substation criticality ranking by using the authors’ proposed method.

Touhiduzzaman, Md↗