Search NASA⌕ Search

SEARCH · Search NASA

Results for “Costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Cost decomposition of linear systems with application to model reduction

A means is provided to assess the value or 'cst' of each component of a large scale system, when the total cost is a quadratic function. Such a 'cost decomposition' of the system has several important uses. When the components represent physical subsystems which can fail, the 'component cost' is useful in failure mode analysis. When the components represent mathematical equations which may be truncated, the 'component cost' becomes a criterion for model truncation. In this latter event component costs provide a mechanism by which the specific control objectives dictate which components should be retained in the model reduction process. This information can be valuable in model reduction and decentralized control problems.

Skelton, R. E.↗

Antenna optimization and cost consideration for the Solar Power Satellite microwave system

The sizing, criteria, cost analysis, and optimized taper of the Solar Power Satellite (SPS) transmitting antenna are discussed. The sizing parameters considered were a thermal limit of 23 kW/sq m in the antenna, a peak power density of 23 mW/sq cm in the ionosphere, and cost effectiveness. Cost schedules and equations are presented for the SPS, and four antenna tapers are analyzed and compared, including the reference 10 dB Gaussian taper. An even powered quadratic series is formulated to minimize electricity cost and stay within thermal and ionospheric power level limits. The optimized Johnson Space Center taper is found to display the lowest energy costs, 4% below the 10 dB Gaussian, and can deliver 5.69 GW at 45.4 mills/kWh to the grid. Further studies are indicated for the optimal antenna and rectenna sizes

Kerwin, E. M.↗

KSC Construction Cost Index

Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

Brown, J. A.↗

Cost estimation model for advanced planetary programs, fourth edition

The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

Spadoni, D. J.↗

Computer analysis of effects of altering jet fuel properties on refinery costs and yields

This study was undertaken to evaluate the adequacy of future U.S. jet fuel supplies, the potential for large increases in the cost of jet fuel, and to what extent a relaxation in jet fuel properties would remedy these potential problems. The results of the study indicate that refiners should be able to meet jet fuel output requirements in all regions of the country within the current Jet A specifications during the 1990-2010 period. The results also indicate that it will be more difficult to meet Jet A specifications on the West Coast, because the feedstock quality is worse and the required jet fuel yield (jet fuel/crude refined) is higher than in the East. The results show that jet fuel production costs could be reduced by relaxing fuel properties. Potential cost savings in the East (PADDs I-IV) through property relaxation were found to be about 1.3 cents/liter (5 cents/gallon) in January 1, 1981 dollars between 1990 and 2010. However, the savings from property relaxation were all obtained within the range of current Jet A specifications, so there is no financial incentive to relax Jet A fuel specifications in the East. In the West (PADD V) the potential cost savings from lowering fuel quality were considerably greater than in the East. Cost savings from 2.7 to 3.7 cents/liter (10-14 cents/gallon) were found. In contrast to the East, on the West Coast a significant part of the savings was obtained through relaxation of the current Jet A fuel specifications.

Breton, T.↗

Excimer laser annealing to fabricate low cost solar cells

The objective is to show whether or not pulsed excimer laser annealing (PELA) of ion-implanted junctions is a cost effective replacement for diffused junctions in fabricating crystalline silicon solar cells. The preliminary economic analysis completed shows that the use of PELA to fabricate both the front junction and back surface field (BSF) would cost approximately 35 cents per peak watt (Wp), compared to a cost of 15 cents/Wp for diffusion, aluminum BSF and an extra cleaning step in the baseline process. The cost advantage of the PELA process depends on improving the average cell efficiency from 14% to 16%, which would lower the overall cost of the module by about 15 cents/Wp. An optimized PELA process compatible with commercial production is to be developed, and increased cell efficiency with sufficient product for adequate statistical analysis demonstrated. An excimer laser annealing station was set-up and made operational. The first experiment used 248 nm radiation to anneal phosphorus implants in polished and texture-etched silicon.

Source record↗

Manual of phosphoric acid fuel cell power plant cost model and computer program

Cost analysis of phosphoric acid fuel cell power plant includes two parts: a method for estimation of system capital costs, and an economic analysis which determines the levelized annual cost of operating the system used in the capital cost estimation. A FORTRAN computer has been developed for this cost analysis.

Lu, C. Y.↗

Space Transportatioin System (STS) propellant scavenging system study. Volume 3: Cost and work breakdown structure-dictionary

Fundamentally, the volumes of the oxidizer and fuel propellant scavenged from the orbiter and external tank determine the size and weight of the scavenging system. The optimization of system dimensions and weights is stimulated by the requirement to minimize the use of partial length of the orbiter payload bay. Thus, the cost estimates begin with weights established for the optimum design. Both the design, development, test, and evaluation and theoretical first unit hardware production costs are estimated from parametric cost weight scaling relations for four subsystems. For cryogenic propellants, the widely differing characteristics of the oxidizer and the fuel lead to two separate tank subsystems, in addition to the electrical and instrumentation subsystems. Hardwares costs also involve quantity, as an independent variable, since the number of production scavenging systems is not firm. For storable propellants, since the tankage volume of the oxidizer and fuel are equal, the hardware production costs for developing these systems are lower than for cryogenic propellants.

Source record↗

Practical aspects of photovoltaic technology, applications and cost (revised)

The purpose of this text is to provide the reader with the background, understanding, and computational tools needed to master the practical aspects of photovoltaic (PV) technology, application, and cost. The focus is on stand-alone, silicon solar cell, flat-plate systems in the range of 1 to 25 kWh/day output. Technology topics covered include operation and performance of each of the major system components (e.g., modules, array, battery, regulators, controls, and instrumentation), safety, installation, operation and maintenance, and electrical loads. Application experience and trends are presented. Indices of electrical service performance - reliability, availability, and voltage control - are discussed, and the known service performance of central station electric grid, diesel-generator, and PV stand-alone systems are compared. PV system sizing methods are reviewed and compared, and a procedure for rapid sizing is described and illustrated by the use of several sample cases. The rapid sizing procedure yields an array and battery size that corresponds to a minimum cost system for a given load requirement, insulation condition, and desired level of service performance. PV system capital cost and levelized energy cost are derived as functions of service performance and insulation. Estimates of future trends in PV system costs are made.

Rosenblum, L.↗

Using a life-cycle-cost criterion for multi-disciplinary design studies for the Manned Space Station

A life-cycle-cost measure for the Manned Space Station is suggested which considers the mass, initial cost, aerodynamic drag, electrical power, moment, required ground support, and expected life of subsystems or components. It is proposed that this life-cycle-cost measure be considered as a criterion for design trade-off studies involving controls and structures. Calculating the related sensitivities in the optimization process is discussed and then applied to specific examples. In the first example, the reaction control system is analyzed with regard to the design of its supporting structure and selection of rocket type. Values of support beam length, structural material selection, and rocket propellant selection are determined which minimize life-cycle-cost. In the second example, the alignment of solar arrays are analyzed for efficiency with regard to generating power, their drag, and their aerodynamic moment. Alignment angles are determined which again minimize life cycle cost. It seems clear from these and other examples that the proposed criterion has value for multi-disciplinary design studies for the Manned Space Station.

Taylor, L. W.↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5). Volume 3: Cost estimates and work breakdown structure/dictionary, phase 1 and 2

Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. A narrative summary of the cost estimates and work breakdown structure/dictionary for both study phases is presented. Costs were estimated using the Grumman Space Programs Algorithm for Cost Estimating (SPACE) computer program and results are given for four AOTV configurations. The work breakdown structure follows the standard of the joint government/industry Space Systems Cost Analysis Group (SSCAG). A table is provided which shows cost estimates for each work breakdown structure element.

Source record↗

Selected Tether Applications Cost Model

Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.

Keeley, Michael G.↗

STS propellant scavenging systems study. Part 2, volume 2: Cost and WBS/dictionary

Presented are the results of the cost analysis performed to update and refine the program phase C/D cost estimates for a Shuttle Derived Vehicle (SDV) tanker. The SDV tanker concept is an unmanned cargo vehicle incorporating a set of propellant tanks in the vehicle's payload module. The tanker will be used to meet the demand for a cryogenic propellant supply in orbit. The propellant tanks are delivered to a low Earth orbit or to an orbit in the vicinity of the Space Station. The intent of the economic analysis is to provide NASA with economic justification for the propellant scavenging concept that minimizes the total Space Transportation System life cycle cost. The detailed costs supporting the concept selection process are presented with descriptive text to aid in forecasting the phase C/D project and program planning. Included are all propellant scavenging costs as well as all SDV, STS and Orbital Maneuvering Vehicle charges to deliver the propellants to the Space Station.

Williams, Frank L.↗

Cost estimating methods for advanced space systems

Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.

Cyr, Kelley↗

Minimizing life cycle cost for subsonic commercial aircraft

A methodology is presented which facilitates the identification of that aircraft design concept which will incur the lowest life-cycle costs (LCCs) while meeting mission requirements. The methodology consists of an LCC module whose constituent elements calculate the costs associated with R&D, testing, evaluation, and production, as well as direct and indirect operating costs, in conjunction with the 'Flight Optimization System' conceptual design/analysis code. Provision is made in the methodology for sensitivities to advanced technologies for the subsonic commercial aircraft in question, which are optimized with respect to minimum gross weight, fuel consumption, acquisition cost, and direct operating cost.

Johnson, Vicki S.↗

Balancing reliability and cost to choose the best power subsystem

A mathematical model is presented for computing total (spacecraft) subsystem cost including both the basic subsystem cost and the expected cost due to the failure of the subsystem. This model is then used to determine power subsystem cost as a function of reliability and redundancy. Minimum cost and maximum reliability and/or redundancy are not generally equivalent. Two example cases are presented. One is a small satellite, and the other is an interplanetary spacecraft.

Suich, Ronald C.↗

Influence of eccentric actions on the metabolic cost of resistance exercise

The contributions of concentric (con) and eccentric (ecc) muscle actions are evaluated with respect to increasing the metabolic cost of resistance exercise. Male subjects perform leg exercise with either con and ecc actions or only con actions while the net energy cost of the exercise is measured by oxygen consumption data. In both groups, the con actions require 290 J/kg body weight of total work, with an energy cost of 0.003 cal/J. The energy costs for the con/ecc actions of the second group is increased by 14 percent. The metabolic cost of leg exercise is concluded to be primarily generated by the con leg actions, and ecc leg actions increase the resistance with only a slight increase in required energy. The findings are significant for practical applications that emphasize the conservation of energy expenditure during exercise in spacecraft environments.

Dudley, Gary A.↗

Cost and quality planning for large NASA programs

The Software Cost and Quality Engineering methodology developed over the last two decades at IBM Federal Sector Div. is used to plan the NASA Space Station Data Management System (DMS). An ongoing project to capture this methodology, which is built on a foundation of experiences and lessons learned, has resulted in the development of a PC-based tool that integrates cost and quality forecasting methodologies and data in a consistent manner. This tool, Software Cost and Quality Engineering Starter Set (SCQESS), is being used to assist in the DMS costing exercises. At the same time, DMS planning serves as a forcing function and provides a platform for the continuing, iterative development, calibration, and validation and verification of SCQESS. The data that forms the cost and quality engineering data base is derived from more than 17 years of development of NASA Space Shuttle software, ranging from low criticality, low complexity support tools to highly complex and highly critical onboard software.

Rone, Kyle Y.↗