Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Flashline Mars Arctic Research Station (FMARS) 2009 Expedition Crew Perspectives

The Flashline Mars Arctic Research Station (FMARS), located on the rim of the Haughton Crater on Devon Island in the Canadian Arctic, is a simulated Mars habitat that provides operational constraints similar to those which will be faced by future human explorers on Mars. In July 2009, a six-member crew inhabited the isolated habitation module and conducted the twelfth FMARS mission. The crew members conducted frequent EVA operations wearing mock space suits to conduct field experiments under realistic Mars-like conditions. Their scientific campaign spanned a wide range of disciplines and included many firsts for Mars analog research. Among these are the first use of a Class IV medical laser during a Mars simulation, helping to relieve crew stress injuries during the mission. Also employed for the first time in a Mars simulation at FMARS, a UAV (Unmanned Aerial Vehicle) was used by the space-suited explorers, aiding them in their search for mineral resources. Sites identified by the UAV were then visited by geologists who conducted physical geologic sampling. For the first time, explorers in spacesuits deployed passive seismic equipment to monitor earthquake activity and characterize the planet's interior. They also conducted the first geophysical electromagnetic survey as analog Mars pioneers to search for water and characterize geological features under the surface. The crew collected hydrated minerals and attempted to produce drinkable water from the rocks. A variety of equipment was field tested as well, including new cameras that automatically geotag photos, data-recording GPS units, a tele-presence rover (operated from Florida), as well as MIT-developed mission planning software. As plans develop to return to the Moon and go on to Mars, analog facilities like FMARS can provide significant benefit to NASA and other organizations as they prepare for robust human space exploration. The authors will present preliminary results from these studies as well as their perspectives on topics including human factors, logistics, EVA operations, and the use of social media throughout the mission.

Cusack, Stacy↗

Liquid Oxygen/Liquid Methane Propulsion and Cryogenic Advanced Development

Exploration Systems Architecture Study conducted by NASA in 2005 identified the liquid oxygen (LOx)/liquid methane (LCH4) propellant combination as a prime candidate for the Crew Exploration Vehicle Service Module propulsion and for later use for ascent stage propulsion of the lunar lander. Both the Crew Exploration Vehicle and Lunar Lander were part the Constellation architecture, which had the objective to provide global sustained lunar human exploration capability. From late 2005 through the end of 2010, NASA and industry matured advanced development designs for many components that could be employed in relatively high thrust, high delta velocity, pressure fed propulsion systems for these two applications. The major investments were in main engines, reaction control engines, and the devices needed for cryogenic fluid management such as screens, propellant management devices, thermodynamic vents, and mass gauges. Engine and thruster developments also included advanced high reliability low mass igniters. Extensive tests were successfully conducted for all of these elements. For the thrusters and engines, testing included sea level and altitude conditions. This advanced development provides a mature technology base for future liquid oxygen/liquid methane pressure fed space propulsion systems. This paper documents the design and test efforts along with resulting hardware and test results.

Klem, Mark D.↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

Hardware Heritage Schedule limitations and budget constraints drove the need for extensive use of heritage hardware designs. In some cases (OMS and TVC) flight hardware reuse (from Shuttle) was required,and will be delta-qualified for use on Orion Primary sources of heritage: ATV Shuttle Orion CM PSS Ariane 5 EPS Targeted Development Testing Component development testing was performed to address the highest risk areas of heritage design compliance with Orion requirements Assembly level development testing was performed to understand complex assemblies and component interactions Heritage Direct re-use of assets from Shuttle Orbiters, all assets have varying flight history. Orion Use Used by Orion to gimbal the main engine during major translational maneuvers Development Testing Random vibration on controller box (lead to card retention design mod) Design Changes (only as required) Circuit board retention in controller box (single instance from Shuttle flight history) New, longer harnesses Basic Specs(8) fixed position engines Thrust: 105 lbf Nozzle area ratio: 164:1 Orion Use Nominally used for separation maneuvers and mid-course correction maneuvers In contingency scenario (failed main engine), used for major translational maneuvers Drives the need for long continuous duration firing Drives the need for off-pulsing (to steer) Control authority requires 50 duty cycle Development Testing Random Vibration (added vibration isolation bracket) Hot fire, duty cycle (changed MR)

pressure fed↗

Apollo Soyuz, mission evaluation report

The Apollo Soyuz mission was the first manned space flight to be conducted jointly by two nations - the United States and the Union of Soviet Socialist Republics. The primary purpose of the mission was to test systems for rendezvous and docking of manned spacecraft that would be suitable for use as a standard international system, and to demonstrate crew transfer between spacecraft. The secondary purpose was to conduct a program of scientific and applications experimentation. With minor modifications, the Apollo and Soyuz spacecraft were like those flown on previous missions. However, a new module was built specifically for this mission - the docking module. It served as an airlock for crew transfer and as a structural base for the docking mechanism that interfaced with a similar mechanism on the Soyuz orbital module. The postflight evaluation of the performance of the docking system and docking module, as well as the overall performance of the Apollo spacecraft and experiments is presented. In addition, the mission is evaluated from the viewpoints of the flight crew, ground support operations, and biomedical operations. Descriptions of the docking mechanism, docking module, crew equipment and experiment hardware are given.

Source record↗

Implementation of the Orbital Maneuvering Systems Engine and Thrust Vector Control for the European Service Module

The European Space Agency (ESA) has entered into a partnership with the National Aeronautics and Space Administration (NASA) to develop and provide the Service Module (SM) for the Orion Multipurpose Crew Vehicle (MPCV) Program. The European Service Module (ESM) will provide main engine thrust by utilizing the Space Shuttle Program Orbital Maneuvering System Engine (OMS-E). Thrust Vector Control (TVC) of the OMS-E will be provided by the Orbital Maneuvering System (OMS) TVC, also used during the Space Shuttle Program. NASA will be providing the OMS-E and OMS TVC to ESA as Government Furnished Equipment (GFE) to integrate into the ESM. This presentation will describe the OMS-E and OMS TVC and discuss the implementation of the hardware for the ESM.

Orbital Maneuvering System↗

STS-102 Crew Activity Report/Flight Day 8 Highlights

On this eighth day of the STS-102 mission, Discovery Pilot James Kelly and Mission Specialist Andrew Thomas are seen in the Leonardo Module. The Expedition 2 crew (James Voss, Susan Helms, and Yuriy Usachev) work to set up the robotic workstations for the robotic arm. STS-102 Commander Jim Weatherbee, Pilot Kelly, and the Expedition 1 crew (William M. Shepherd, Yuri P. Gidzenko, and Sergei K. Krikalev) answer questions about the mission in an in-flight interview.

Source record↗

International Space Station General Resource Reel

The construction and evolution of the International Space Station (ISS) is seen through various clips. Live footage shows the following: (1) the Zarya Module under construction and during launch preparations; (2) the Unity Module under construction, during launch preparations, and being lowered into the payload canister; (3) STS-88 Mission Specialists Jerry Ross and Jim Newman during training for their spacewalks, including activities in the Neutral Buoyancy Laboratory (NBL); (4) Zarya and Unity docking to the Service Module; (5) the Expedition 1 crew (William Shepherd, Yuri Gidzenko, and Sergei Krikalev) during emergency escape training in the Black Sea and during water survival training at Johnson Space Center; (6) the X-38 Crew Return Vehicle Drop Test; and (7) the US Destiny Laboratory Module, Pressurized Mating Adapter (PMA), Service Module, Italian Multi-Purpose Logistics Module, US Airlock, and US Habitation Module under construction. Computerized animations show the following: (1) an ISS fly-around; (2) the STS-88 Space Shuttle as it docks with Zarya and attaches Zarya to the Unity Module; (3) the Space Shuttle as it docks with ISS and installs the Z1 truss segment and PMA; (4) the Soyuz spacecraft as it docks with ISS; (5) interior and exterior views of the Columbus Attached Pressurized Module; and (6) a Transhab animation showing the interior and exterior and marking the components.

Source record↗

Modification of the International Space Station USOS to Support Installation and Activation of the Node 3 Element

The International Space Station (ISS) program is nearing an assembly complete configuration with the addition of the final resource node module in early 2010. The Node 3 module will provide critical functionality in support of permanent long duration crews aboard ISS. The new module will permanently house the regenerative Environment Control and Life Support Systems (ECLSS) and will also provide important habitability functions such as waste management and exercise facilities. The ISS program has selected the Port side of the Node 1 "Unity" module as the permanent location for Node 3 which will necessitate architecture changes to provide the required interfaces. The USOS ECLSS fluid and ventilation systems, Internal Thermal Control Systems, and Avionics Systems require significant modifications in order to support Node 3 interfaces at the Node 1 Port location since it was not initially designed for that configuration. This paper outlines the design, development, certification, and implementation of these changes in support of ISS assembly complete.

Link, Dwight E., Jr.↗

Robotics

Lunar robotic functions include: 1. Transport of crew and payloads on the surface of the moon; 2. Offloading payloads from a lunar lander; 3. Handling the deployment of surface systems; with 4. Human commanding of these functions from inside a lunar vehicle, habitat, or extravehicular (space walk), with Earth-based supervision. The systems that will perform these functions may not look like robots from science fiction. In fact, robotic functions may be automated trucks, cranes and winches. Use of this equipment prior to the crew s arrival or in the potentially long periods without crews on the surface, will require that these systems be computer controlled machines. The public release of NASA's Exploration plans at the 2nd Space Exploration Conference (Houston, December 2006) included a lunar outpost with as many as four unique mobility chassis designs. The sequence of lander offloading tasks involved as many as ten payloads, each with a unique set of geometry, mass and interface requirements. This plan was refined during a second phase study concluded in August 2007. Among the many improvements to the exploration plan were a reduction in the number of unique mobility chassis designs and a reduction in unique payload specifications. As the lunar surface system payloads have matured, so have the mobility and offloading functional requirements. While the architecture work continues, the community can expect to see functional requirements in the areas of surface mobility, surface handling, and human-systems interaction as follows: Surface Mobility 1. Transport crew on the lunar surface, accelerating construction tasks, expanding the crew s sphere of influence for scientific exploration, and providing a rapid return to an ascent module in an emergency. The crew transport can be with an un-pressurized rover, a small pressurized rover, or a larger mobile habitat. 2. Transport Extra-Vehicular Activity (EVA) equipment and construction payloads. 3. Transport habitats and power modules over long distances, pre-positioning them for the arrival of crew on a subsequent lander. Surface Handling 1. Offload surface system payloads from the lander, breaking launch restraints and power/data connections. Payloads may be offloaded to a wheeled vehicle for transport. 2. Deploy payloads from a wheeled vehicle at a field site, placing the payloads in their final use site on the ground or mating them with existing surface systems. 3. Support regolith collection, site preparation, berm construction, or other civil engineering tasks using tools and implements attached to rovers. Human-Systems Interaction 1. Provide a safe command and control interface for suited EVA to ride on and drive the vehicles, making sure that the systems are also safe for working near dismounted crew. 2. Provide an effective control system for IV crew to tele-operate vehicles, cranes and other equipment from inside the surface habitats with evolving independence from Earth. .. Provide a supervisory system that allows machines to be commanded from the ground, working across the Earth-Lunar time delays on the order of 5-10 seconds (round trip) to support operations when crew are not resident on the surface. Technology Development Needs 1. Surface vehicles that can dock, align and mate with outpost equipment such as landers, habitats and fluid/power interfaces. 2. Long life motors, drive trains, seals, motor electronics, sensors, processors, cable harnesses, and dash board displays. 3. Active suspension control, localization, high speed obstacle avoidance, and safety systems for operating near dismounted crew. 4. High specific energy and specific power batteries that are safe, rechargeable, and long lived.

Ambrose, Robert O.↗

Spacecraft Escape Capsule

A report discusses the Gumdrop capsule a conceptual spacecraft that would enable the crew to escape safely in the event of a major equipment failure at any time from launch through atmospheric re-entry. The scaleable Gumdrop capsule would comprise a command module (CM), a service module (SM), and a crew escape system (CES). The CM would contain a pressurized crew environment that would include avionic, life-support, thermal control, propulsive attitude control, and recovery systems. The SM would provide the primary propulsion and would also supply electrical power, life-support resources, and active thermal control to the CM. The CES would include a solid rocket motor, embedded within the SM, for pushing the CM away from the SM in the event of a critical thermal-protection-system failure or loss of control. The CM and SM would normally remain integrated with each other from launch through recovery, but could be separated using the CES, if necessary, to enable the safe recovery of the crew in the CM. The crew escape motor could be used, alternatively, as a redundant means of de-orbit propulsion for the CM in the event of a major system failure in the SM.

Robertson, Edward A.↗

Crew Time Requirements in Future Space Greenhouses - What Can We Infer from Current Analog and Space Missions?

Efficient crop production will be required to advance humanity’s presence in space, and for this, accurate predictions of crew time in future space greenhouse modules will be crucial to design and operate these plant growth systems, and schedule crop production. Crew time estimates will also be critical for deciding priorities of automating different aspects of space crop production. Because it is difficult to capture in operational environments, crew time for plant cultivation has only been sporadically recorded in past analog and space missions. We propose a methodology for efficient categorizing and reporting of crew time in space plant growth systems: first identify the different tasks needed to operate the greenhouse module, second define a representative time period for data collection, third accurately report crew time for individual tasks - and their occurrence, and fourth use collected data to improve greenhouse modules and plant growth system designs. Using data from various analog facilities and from the Veggie hardware on ISS, and assumptions for different mission scenarios, we discuss how crew time for plant cultivation can be reduced with adequate choices of crops, automation, artificial intelligence (AI) and virtual assistants, and sufficient crew training. This has major implications for the design of future space greenhouse modules. For example, missions on future space stations or during interplanetary travel would save significant crew time by including leafy greens and microgreens for astronaut’s diet supplement, with automated watering, health and environmental checks, as well as AI managing maintenance schedules, and a virtual assistant for repair activities. This work was funded by NASA Space Biology through NASA postdoctoral program / USRA, by NASA’s Space Biology and Human Research Programs, and by the European Union Horizon 2020 program via the COMPET-07-2014 - Space exploration – Life-support subprogram (reference number: 636501).

Lucie Poulet↗

Crew Time Requirements in Future Space Greenhouses: What Can We Infer from Current Analog and Space Missions?

Efficient crop production will be required to advance humanity’s presence in space, and for this, accurate predictions of crew time in future space greenhouse modules will be crucial to design and operate these plant growth systems, and schedule crop production. Crew time estimates will also be critical for deciding priorities of automating different aspects of space crop production. Because it is difficult to capture in operational environments, crew time for plant cultivation has only been sporadically recorded in past analog and space missions. We propose a methodology for efficient categorizing and reporting of crew time in space plant growth systems: first identify the different tasks needed to operate the greenhouse module, second define a representative time period for data collection, third accurately report crew time for individual tasks - and their occurrence, and fourth use collected data to improve greenhouse modules and plant growth system designs. Using data from various analog facilities and from the Veggie hardware on ISS, and assumptions for different mission scenarios, we discuss how crew time for plant cultivation can be reduced with adequate choices of crops, automation, artificial intelligence (AI) and virtual assistants, and sufficient crew training. This has major implications for the design of future space greenhouse modules. For example, missions on future space stations or during interplanetary travel would save significant crew time by including leafy greens and microgreens for astronaut’s diet supplement, with automated watering, health and environmental checks, as well as AI managing maintenance schedules, and a virtual assistant for repair activities. This work was funded by NASA Space Biology through NASA postdoctoral program / USRA, by NASA’s Space Biology and Human Research Programs, and by the European Union Horizon 2020 program via the COMPET-07-2014 - Space exploration – Life-support subprogram (reference number: 636501).

Veggie↗

The role of Environmental Health System air quality monitors in Space Station Contingency Operations

This paper describes the Space Station Freedom (SSF) Environmental Health System's air-quality monitoring strategy and instrumentation. A two-tier system has been developed, consisting of first-alert instruments that warn the crew of airborne contamination and a volatile organic analyzer that can identify volatile organic contaminants in near-real time. The strategy for air quality monitoring on SSF is designed to provide early detection so that the contamination can be confined to one module and so that crew health and safety can be protected throughout the contingency event. The use of air-quality monitors in fixed and portable modes will be presented as a means of following the progress of decontamination efforts and ensuring acceptable air quality in a module after an incident. The technology of each instrument will be reviewed briefly; the main focus of this paper, however, will be the use of air-quality monitors before, during, and after contingency incidents.

Limero, Thomas F.↗

Mir Mission Chronicle

Dockings, module additions, configuration changes, crew changes, and major mission events are tracked for Mir missions 17 through 21 (November 1994 through August 1996). The international aspects of these missions are presented, comprising joint missions with ESA and NASA, including three U.S. Space Shuttle dockings. New Mir modules described are Spektr, the Docking Module, and Priroda.

McDonald, Sue↗

Portable Fan Assembly for the International Space Station

NASA/ Marshall Space Flight Center (NASA/MSFC) is responsible for the design and fabrication of a Portable Fan Assembly (PFA) for the International Space Station (ISS). The PFA will be used to enhance ventilation inside the ISS modules as needed for crew comfort and for rack rotation. The PFA consists of the fan on-orbit replaceable unit (ORU) and two noise suppression packages (silencers). The fan ORU will have a mechanical interface with the Seat Track Equipment Anchor Assembly, in addition to the power supply module which includes a DC-DC converter, on/standby switch, speed control, power cable and connector. This paper provides a brief development history, including the criteria used for the fan, and a detailed description of the PFA operational configurations. Space Station requirements as well as fan performance characteristics are also discussed.

Jenkins, Arthur A.↗

Safety in earth orbit study. Volume 2: Analysis of hazardous payloads, docking, on-board survivability

Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.

Source record↗

Design concepts for the Centrifuge Facility Life Sciences Glovebox

The Life Sciences Glovebox will provide the bioisolated environment to support on-orbit operations involving non-human live specimens and samples for human life sceinces experiments. It will be part of the Centrifuge Facility, in which animal and plant specimens are housed in bioisolated Habitat modules and transported to the Glovebox as part of the experiment protocols supported by the crew. At the Glovebox, up to two crew members and two habitat modules must be accommodated to provide flexibility and support optimal operations. This paper will present several innovative design concepts that attempt to satisfy the basic Glovebox requirements. These concepts were evaluated for ergonomics and ease of operations using computer modeling and full-scale mockups. The more promising ideas were presented to scientists and astronauts for their evaluation. Their comments, and the results from other evaluations are presented. Based on the evaluations, the authors recommend designs and features that will help optimize crew performance and facilitate science accommodations, and specify problem areas that require further study.

Sun, Sidney C.↗

Evolution of the Space Station Freedom module pattern

A reanalysis of the evolution configuration module pattern for Space Station Freedom is presented. The module pattern is to consist of one habitation module, one airlock, one cupola, two Space Shuttle Orbiter pressurized docking adapters, one assured crew return vehicle, and one pressurized logistics module. Three laboratory modules are also included. A phased plan has been developed on the basis of utilization analysis being performed and derived through actual and projected user mission requirements for the growth of pressurized elements. The evolution requirement impacts to the module pattern are outlined. Application of the growth philosophy and the physical limitations resulted in a number of core element ground rules for module pattern growth. Nodes and modules are to be grown symmetrically in order to optimize poor flight control characteristics and maximize the capability for crew dual egress between elements. Core module pattern elements are not to be grown along Y-Y axis from nodes 1 or 2 due to physical clearance problems with the thermal control system radiators operational envelope.

Gould, Marston↗