Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOMESTIC SUPPLIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Recovery and Blend-Down Uranium for Beneficial use in Commercial Reactors - 13373

In April 2001 the Department of Energy (DOE) and the Tennessee Valley Authority (TVA) signed an Interagency Agreement to transfer approximately 33 MT of off-specification (off-spec) highly enriched uranium (HEU) from DOE to TVA for conversion to commercial reactor fuel. Since that time additional surplus off-spec HEU material has been added to the program, making the total approximately 46 MT off-spec HEU. The disposition path for approximately half (23 MT) of this 46 MT of surplus HEU material, was down blending through the H-canyon facility at the Savannah River Site (SRS). The HEU is purified through the H-canyon processes, and then blended with natural uranium (NU) to form low enriched uranium (LEU) solution with a 4.95% U-235 isotopic content. This material was then transported to a TVA subcontractor who converted the solution to uranium oxide and then fabricated into commercial light water reactor (LWR) fuel. This fuel is now powering TVA reactors and supplying electricity to approximately 1 million households in the TVA region. There is still in excess of approximately 10 to 14 MT of off-spec HEU throughout the DOE complex or future foreign and domestic research reactor returns that could be recovered and down blended for use in either currently designed light water reactors, ∼5% enriched LEU, or be made available for use in subsequent advanced 'fast' reactor fuel designs, ∼19% LEU. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗

Material For Harsh Environments : 2020 Virtual Workshop Summary Report

This report identifies seven high-priority, crosscutting research directions for energy-producing and energy-intensive industries in which harsh service environments are experienced. Electrical power-generating technologies that could benefit include nuclear, renewable (e.g., wind, solar thermal, geothermal, and hydro), and combustion processes (e.g., hydrogen, natural gas, biomass, and coal). Investment in these research areas could drive deployment of new materials and manufacturing innovations that would, in turn, enable widespread implementation of advanced materials into the energy production and manufacturing sectors, leading to step-changes in materials systems’ performance and manufacturing efficiency. Those technological step-change advancements would stimulate and reinvigorate domestic manufacturing, improve U.S. manufacturing competitiveness, markedly improve energy efficiency in targeted energy-intensive manufacturing processes, and enable practice of technologies that reduce the carbon footprint across a broad swath of manufacturing and electricity production supply chains.

36 MATERIALS SCIENCE↗

Analysis of Energy-Efficiency Opportunities for the Cement Industry in Shandong Province, China

China's cement industry, which produced 1,388 million metric tons (Mt) of cement in 2008, accounts for almost half of the world's total cement production. Nearly 40% of China's cement production is from relatively obsolete vertical shaft kiln (VSK) cement plants, with the remainder from more modern rotary kiln cement plants, including plants equipped with new suspension pre-heater and pre-calciner (NSP) kilns. Shandong Province is the largest cement-producing Province in China, producing 10% of China's total cement output in 2008. This report documents an analysis of the potential to improve the energy efficiency of NSP kiln cement plants in Shandong Province. Sixteen NSP kiln cement plants were surveyed regarding their cement production, energy consumption, and current adoption of 34 energy-efficient technologies and measures. Plant energy use was compared to both domestic (Chinese) and international best practice using the Benchmarking and Energy Saving Tool for Cement (BEST-Cement). This benchmarking exercise indicated an average technical potential primary energy savings of 12% would be possible if the surveyed plants operated at domestic best practice levels in terms of energy use per ton of cement produced. Average technical potential primary energy savings of 23% would be realized if the plants operated at international best practice levels. Energy conservation supply curves for both fuel and electricity savings were then constructed for the 16 surveyed plants. Using the bottom-up electricity conservation supply curve model, the cost-effective electricity efficiency potential for the studied cement plants in 2008 is estimated to be 373 gigawatt hours (GWh), which accounts for 16% of total electricity use in the 16 surveyed cement plants in 2008. Total technical electricity-saving potential is 915 GWh, which accounts for 40% of total electricity use in the studied plants in 2008. The fuel conservation supply curve model shows the total technical fuel efficiency potential equal to 7,949 terajoules (TJ), accounting for 8% of total fuel used in the studied cement plants in 2008. All the fuel efficiency potential is shown to be cost effective. Carbon dioxide (CO{sub 2}) emission reduction potential associated with cost-effective electricity saving is 383 kiloton (kt) CO{sub 2}, while total technical potential for CO{sub 2} emission reduction from electricity-saving is 940 ktCO{sub 2}. The CO{sub 2} emission reduction potentials associated with fuel-saving potentials is 950 ktCO{sub 2}.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

American Made Energy Infrastructure - Evolution of Federal Incentives and Requirements

This presentation, "Evolution of Federal Incentives and Requirements," explores the development and impact of federal cybersecurity regulations, tax credits, and domestic content requirements on the energy sector. It covers key legislation such as the ARRA of 2009, IIJA, and IRA, and their implications for grid modernization, manufacturing, and deployment of energy technologies. The presentation also addresses definitions and restrictions related to Foreign Entities of Concern (FEOC) and their impact on federal procurement. Additionally, it introduces the DOE's cybersecurity framework for energy supply chains and practical actions for compliance planning.

25 - ENERGY STORAGE↗

Status of the ITER Ion Cyclotron H&CD

The ITER Ion Cyclotron Heating and Current Drive system (IC H&CD) is designed to deliver 20MW to a broad range of plasma scenarios between 40 and 55MHz, during very long pulses. It consists of two broadband equatorial port plug antennas, their pre-matching and matching systems, transmission lines, Radio Frequency (RF) Sources and High Voltage Power Supplies. The overall project schedule has been revised and agreed by ITER Council; it re-integrates the second antenna and its power supplies in construction baseline and sets the dates for progressive installation with DT phase planned in 2035. Recent progress on ICRF subsystems is reported, covering design evolution, qualification of test articles and specific R&D results in domestic agencies, suppliers, associated laboratories and IO.

Agarwal, Rohit↗

2018 Offshore Wind Technologies (Market Report)

The 2018 Offshore Wind Technologies Market Report is intended to provide offshore wind policymakers, regulators, developers, researchers, engineers, financiers, supply chain participants, and other stakeholders with up-to-date quantitative information about the offshore wind market, technology, and cost trends in the United States and worldwide. This report is especially intended to provide detailed information on the domestic offshore wind industry to provide a U.S. context and help navigate technical and market barriers and opportunities.

17 WIND ENERGY↗

Estimating Potential Tritium and Plutonium Production in North Korea’s Experimental Light Water Reactor

Our work explores North Korea's 100 MW-th Experimental Light Water Reactor (ELWR) and its potential contributions to the country's nuclear weapons program. Built at the Yongbyon Nuclear Research Center, the ELWR began operations in October 2023 and represents North Korea's first attempts at a light-water reactor using domestically-enriched, ceramic fuel. Our study examines possible configurations for energy, tritium, and tritium-plutonium co-production. Assuming a single-batch core, the ELWR can be used to annually produce 48-82 grams of tritium, which can supply 2-4 new boosted warheads each year, up to a maximum arsenal of 88-150 warheads total. Concurrent production of tritium and weapon-grade plutonium is also possible but requires reprocessing of spent ceramic fuel. Furthermore, these findings underscore how North Korea's nuclear capabilities may be advanced through the ELWR's dual-use potential.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Biofuel Production and Greenhouse Gas Reduction Potential

Under two biomass supply scenarios presented in this study, between 56 and 81 B GGE/year of biofuel could be produced. The corresponding GHG reduction potential is between to 410 million 635 billion Mt CO2e/year. This volume of biofuel is sufficient to replace a majority of fuel demand in hard-to-electrify aviation, marine, rail and off-road transportation by 2050. Through pathway selection and process design, sufficient sustainable aviation fuel (SAF) could be produced to exceed the projected 35 B gpy of domestic aviation fuel demand by 2050. The external hydrogen required to produce this volume of fuel is estimated to be between 3.5 to 5.2 Mt/year.

09 BIOMASS FUELS↗

Wind power manufacturing and supply chain summit USA.

The area of wind turbine component manufacturing represents a business opportunity in the wind energy industry. Modern wind turbines can provide large amounts of electricity, cleanly and reliably, at prices competitive with any other new electricity source. Over the next twenty years, the US market for wind power is expected to continue to grow, as is the domestic content of installed turbines, driving demand for American-made components. Between 2005 and 2009, components manufactured domestically grew eight-fold to reach 50 percent of the value of new wind turbines installed in the U.S. in 2009. While that growth is impressive, the industry expects domestic content to continue to grow, creating new opportunities for suppliers. In addition, ever-growing wind power markets around the world provide opportunities for new export markets.

17 WIND ENERGY↗

Characterization of Urbix Resources Natural Flake Graphite Material for Nuclear Applications (CRADA NFE-18-07340 Final Report)

Urbix Resources is a company specializing in graphite powder processing and purification. Urbix is looking to become the first domestic supplier of nuclear-grade graphite in the United States. This has led to a Cooperative Research and Development Agreement (CRADA) being established between the Oak Ridge National Laboratory (ORNL) and Urbix Resources, with the goal of characterizing a purified graphite feedstock supplied by Urbix Resources. The resulting data will then be used to determine the viability of a large-scale nuclear graphite production and qualification campaign. These characterization methods have been performed on the as-received graphite feedstock, a heat-treated batch of the feedstock, a milled batch of the feedstock, and a nuclear-grade graphite powder historically used in fuel production. The data from the heat-treated and milled feedstock will determine how different processing methods affect the powder’s physical properties, whereas the data from the nuclear grade graphite will provide information about the characteristics of a graphite previously accepted for nuclear applications. All of these powders have been characterized individually and as part of a resin-graphite blend (herein referred to as matrix) that has been used in past fuel experiments. The results of these experiments show that the Urbix powder and nuclear-grade graphite powder display notably different properties from one another in many cases, but this discrepancy may have been the result of the typical particle size of each powder. This hypothesis is supported by tests conducted on the milled powder, which showed a closer resemblance in properties to the nuclear-grade graphite than the as-received powder. The method for pressing the graphite matrix also had a noticeable effect on the measured properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Advanced Materials and Manufacturing Technologies Office

The Advanced Materials and Manufacturing Technologies Office (AMMTO) researches, develops, and demonstrates next-generation materials and manufacturing technologies needed to increase U.S. industrial competitiveness and to advance economy-wide decarbonization. AMMTO supports the national plan to revitalize American manufacturing, secure critical supply chains, and develop diverse innovation ecosystems leading to new manufacturing jobs and increased economic strength and security of the nation. AMMTO provides planning, management, and direction necessary for a balanced program of research, development, demonstration, technical assistance, and workforce development to support domestic manufacturing that is critical to achieving a clean, decarbonized economy.

Next Generation materials and processes, secure an↗

U.S. energy independence in 15 years

Establish U.S. energy independence within 15 years -- This is a enormous systems engineering challenge to thoroughly analyze the present mix of power generation, energy consumption in all sectors such as transportation, industrial, commercial and residential, and devise new technologies to assist the process to independence. At this level, all citizens will be affected, requiring not only effective technologies, but superior cost/benefit ratios and effective free market interactions. With U.S. energy independence, world markets will be influenced. It will be necessary to develop or modify new energy sources, possibly including storage, and adjust or modify energy consumption profiles. Figure 1 shows the expected transition from present-day energy consumption based on both domestic and imported energy. During the 15 year period, the U.S. transitions to energy independence, eliminating imports, and perhaps reduces total energy consumption due to increased efficiency. In the future, U.S. energy consumption is able to grow in accordance with national policies and enhanced domestic capabilities. At the present time, the primary energy import is hydrocarbon products -- primarily oil. Of that imported oil, most of it is used for transportation. In order to reduce the need for imported oil, the U.S. will need to revamp its energy supply and energy consumption mixes. This change in business and usage in the U.S. will require enonnous effort on the part of many organizations and individuals. Los Alamos National Laboratory (LANL) will take the technological lead on this grand challenge. Nearly all directorates, technical, planning and policy capabilities will be brought together and focused on this objective. A simplified chart of the interactions within LANL is shown in Figure 3. Given the enonnous undertaking of U.S. energy independence, the vast engineering, technological and science-based capabilities of LANL will work together performing systems engineering, applied research and development, while working with policy makers, taking into account environmental, free market, and climate issues and constraints.

99 GENERAL AND MISCELLANEOUS↗

Fall 2021 Solar Industry Update

Each quarter, the National Renewable Energy Laboratory (NREL) conducts the Quarterly Solar Industry Update, a presentation of technical trends within the solar industry, to the solar office staff. Each presentation focuses on global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

component↗

U.S. Pellet Industry Overview

The U.S. production of wood pellets has grown to over 8 million tons by 2015 (FAO 2016). The majority of the production capacity increase took place in the U.S. Southeast and is associated with industrial wood pellet production for export markets. In 2015, over 5 million tons were exported, 99% of which went to EU markets (84% to the UK alone) (EUROSTAT 2015, FAOSTAT 2016, USDA 2016). The production and consumption growth of U.S. residential wood pellets has been slow in comparison. The industrial and residential wood pellet markets are beginning to merge slowly, but production excess (e.g., in 2015 and 2016) in the industrial wood pellet segment could not be fully absorbed by domestic or oversea residential markets. The main growth path for U.S. wood pellet production is still seen to lie in oversea markets (Bingham 2016, Strauss 2016). Demand increases for industrial pellets are projected to occur within the next years in Europe (Netherlands, Denmark, UK, Belgium) and Asia (predominantly Japan). At the same time, subsidy schemes in Europe are also bound to be phased out within the next decade. U.S. suppliers will have to compete with other supply regions (e.g., Western Canada to Asia) in the long-term, and are already focusing on selling more and more into non-subsidized markets such as biochemicals, absorbents, and soil amendments (Keppler 2016). An outlook of U.S. industrial wood pellet production under a potential growth in U.S. biopower demand and a lack thereof shows a wood pellet oversupply of 9-10 million tons by 2030, equaling roughly 12.5 million tons of production capacity, 20-30 large-scale plants, or 15 million green tons of woody biomass. Once the U.S. production of wood pellets outgrows combustion market demand (which will plateau even with a domestic expansion of biopower) the industry will require additional outlets to avoid a structural decline and bankruptcy. This will create a resource push and cost reduction, driving the development of a U.S. cellulosic biofuels industry.

09 BIOMASS FUELS↗

Jointly Sponsored Research Program Energy Related Research

Cooperative Agreement, DE-FC26-98FT40323, Jointly Sponsored Research (JSR) Program at Western Research Institute (WRI) began in 1998. Over the course of the Program, a total of seventy-seven tasks were proposed utilizing a total of $23,202,579 in USDOE funds. Against this funding, cosponsors committed $26,557,649 in private funds to produce a program valued at $49,760,228. The goal of the Jointly Sponsored Research Program was to develop or assist in the development of innovative technology solutions that will: (1) Increase the production of United States energy resources - coal, natural gas, oil, and renewable energy resources; (2) Enhance the competitiveness of United States energy technologies in international markets and assist in technology transfer; (3) Reduce the nation's dependence on foreign energy supplies and strengthen both the United States and regional economies; and (4) Minimize environmental impacts of energy production and utilization. Under the JSR Program, energy-related tasks emphasized enhanced oil recovery, heavy oil upgrading and characterization, coal beneficiation and upgrading, coal combustion systems development including oxy-combustion, emissions monitoring and abatement, coal gasification technologies including gas clean-up and conditioning, hydrogen and liquid fuels production, coal-bed methane recovery, and the development of technologies for the utilization of renewable energy resources. Environmental-related activities emphasized cleaning contaminated soils and waters, processing of oily wastes, mitigating acid mine drainage, and demonstrating uses for solid waste from clean coal technologies, and other advanced coal-based systems. Technology enhancement activities included resource characterization studies, development of improved methods, monitors and sensors. In general the goals of the tasks proposed were to enhance competitiveness of U.S. technology, increase production of domestic resources, and reduce environmental impacts associated with energy production and utilization. This report summarizes the accomplishments of the JSR Program.

01 COAL, LIGNITE, AND PEAT↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

ARIES↗