Search NASA⌕ Search

SEARCH · Search NASA

Results for “Demonstration Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

08 HYDROGEN↗

Illitization in the Mt. Simon Sandstone, Illinois Basin, USA: Implications for carbon dioxide storage

Clay mineral cementation is one of the most important controls on sandstone reservoir properties. Here, in this paper, the diagenetic history of the Mt. Simon reservoir complex is studied to reveal the origin, timing, and controls of illitization. Samples of sandstone and shale from Mt. Simon reservoir complex were acquired from the Illinois Basin–Decatur Project (IBDP), a CO 2 storage demonstration project in the central Illinois Basin. Petrographic, SEM, TEM, XRD analyses and K/Ar age dating were completed to identify the major detrital and diagenetic components of the samples and reveal illite to be the major clay component in all samples. Illitic clay coatings in the lower Mt. Simon reservoir are identified as a major control on reservoir properties by inhibiting major precipitation of authigenic quartz during illitization, resulting in highly permeable sandstone, essential for CO 2 storage. The coating box-work morphology and mineralogy are indicative of a detrital smectite origin with subsequent illite growth associated with feldspar dissolution and kaolinite alteration. The mineralogy of bulk material and separate grain size fractions (2–0.6 μm; 0.6–0.2 μm; < 0.2 μm) with illite polytypes 2M 1 , 1M, and 1M d were quantified and age dated via 40 K- 40 Ar methods. The shales or reservoir seals contain the highest proportions of detrital illite with illite in the lower Mt. Simon Sandstone reservoir identified as solely diagenetic. Two major events of illitization are identified throughout the Mt. Simon with more porous reservoir rock exhibiting the older event from approximately 360 to 315 Ma and tighter sandstone units with reservoir properties too low to be considered reservoir exhibiting illite dates from 250 to 220 Ma. This partitioning of illitization is attributed to varied mineralogy controlled by depositional changes and evolution of the greater basin.

58 GEOSCIENCES↗

Predictive Solar-Integrated Commercial Building Load Control

This report is the final technical report for the Department of Energy SunShot award number EE0007180 to EdgePower Inc., for the project entitled “Predictive Solar-Integrated Commercial Building Load Control.” The goal of this project was to successfully prove that the integration of solar forecasting and building load control can reduce demand charge costs for commercial building owners with solar PV. This proof of concept Tier 0 project demonstrated its value through a pilot project at a commercial building. This final report contains a summary of the work completed through he duration of the project. Clean Power Research was a sub-recipient on the award.

14 SOLAR ENERGY↗

FY2020 Technology Integration Annual Progress Report

The 2020 Technology Integration Annual Progress Report covers 46 multi-year projects funded by the Vehicle Technologies Office. The report includes information on competitively awarded projects, ranging from rural shared mobility demonstration projects to medium- and heavy-duty electric vehicle deployment to statewide alternative fuel resiliency planning. It also includes projects conducted by several of the Vehicle Technologies Office’s (VTO) National Laboratory partners, Argonne National Laboratory, Oak Ridge National Laboratory and the National Renewable Energy Laboratory. These projects range from a Technical Assistance project for business, industry, government and individuals, to the EcoCar Advanced Vehicle Technology Competition, and the Fuel Economy Information Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Panel Session 120: Roundtable: Waste Management - Energy Facilities Contractor Operating Group (EFCOG WM)

This Roundtable focused on the WM EFCOG working group as they met to discuss a variety of issues of importance to US DOE waste management operations. The purpose of the WM EFCOG is to seek out and promote the best management and operating practices, cost effective technologies and disposal options for all waste streams generated at US DOE facilities whether destined for US DOE or commercial facilities. Each site representative provided a radioactive waste management lessons learned briefing. Panelists with presentations: Savannah River Site (SRS) Solid Waste Program Update (Kerri Crawford); Idaho Clean-up Project Status (Frederick Hughes); West Valley Demonstration Project Update - EFCOG Waste Management Working Group (John Rendall); Key Project Challenges and Successes (Kalli Shupe); EFCOG WMWG Challenging Waste Subgroup Update (Tammy Monday); CH TRU Difficult Waste Stream Processing Challenges (Daniel Pancake); Argonne Building 350 Clean-up Success Using Effective Work Control (Daniel Dilday); Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring↗

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring↗

Supercharge NY

The Energy Program for Innovation Clusters (EPIC) Supercharge NY enabled The Clean Fight to execute an inaugural accelerator program focused on enabling world-class, growth-stage energy storage companies to successfully scale deployments and establish domestic manufacturing pathways in New York State. The Clean Fight has developed and tested a successful accelerator model designed to reduce the barriers growth-stage climate tech companies face by collapsing the sales cycle to scaling solutions at speed. The Clean Fight’s Supercharge NY project allowed for the exploration into the understanding of New York-focused energy storage opportunities, challenges, and methods for enabling successful projects. The Clean Fight’s Supercharge NY project enabled high-touch matchmaking with industry leading customer and capital partners, technical assistance to facilitate scaling supply chain and manufacturing capacity, and access to non-dilutive funding for first-of-a-kind or demonstration projects in New York State. The results of the program provide a public benefit by accelerating deployments of energy storage to provide value-added energy services and sustainability benefits to communities while boosting economic opportunity and job creation for all.

25 ENERGY STORAGE↗

SEARCHING FOR COMETS ON THE WORLD WIDE WEB: THE ORBIT OF 17P/HOLMES FROM THE BEHAVIOR OF PHOTOGRAPHERS

We performed an image search for 'Comet Holmes', using the Yahoo{exclamation_point} Web search engine, on 2010 April 1. Thousands of images were returned. We astrometrically calibrated-and therefore vetted-the images using the Astrometry.net system. The calibrated image pointings form a set of data points to which we can fit a test-particle orbit in the solar system, marginalizing over image dates and detecting outliers. The approach is Bayesian and the model is, in essence, a model of how comet astrophotographers point their instruments. In this work, we do not measure the position of the comet within each image, but rather use the celestial position of the whole image to infer the orbit. We find very strong probabilistic constraints on the orbit, although slightly off the Jet Propulsion Lab ephemeris, probably due to limitations of our model. Hyperparameters of the model constrain the reliability of date meta-data and where in the image astrophotographers place the comet; we find that {approx}70% of the meta-data are correct and that the comet typically appears in the central third of the image footprint. This project demonstrates that discoveries and measurements can be made using data of extreme heterogeneity and unknown provenance. As the size and diversity of astronomical data sets continues to grow, approaches like ours will become more essential. This project also demonstrates that the Web is an enormous repository of astronomical information, and that if an object has been given a name and photographed thousands of times by observers who post their images on the Web, we can (re-)discover it and infer its dynamical properties.

79 ASTRONOMY AND ASTROPHYSICS↗

Learning Demonstration Interim Progress Report -- July 2010

This report discusses key results based on data through December 2009 from the U.S. Department of Energy's (DOE) Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project, also referred to as the National Fuel Cell Electric Vehicle (FCEV) Learning Demonstration. The report serves to help transfer knowledge and lessons learned within various parts of DOE's hydrogen program, as well as externally to other stakeholders. It is the fourth such report in a series, with previous reports being published in July 2007, November 2007, and April 2008.

08 HYDROGEN↗

RD&D Cooperation for the Development of Fuel Cell, Hybrid and Electric Vehicles within the International Energy Agency: Preprint

Annex XIII on 'Fuel Cell Vehicles' of the Implementing Agreement Hybrid and Electric Vehicles of the International Energy Agency has been operating since 2006, complementing the ongoing activities on battery and hybrid electric vehicles within this group. This paper provides an overview of the Annex XIII final report for 2010, compiling an up-to-date, neutral, and comprehensive assessment ofcurrent trends in fuel cell vehicle technology and related policy. The technological description includes trends in system configuration as well as a review of the most relevant components including the fuel cell stack, batteries, and hydrogen storage. Results from fuel cell vehicle demonstration projects around the world and an overview of the successful implementation of fuel cells in specifictransport niche markets will also be discussed. The final section of this report provides a detailed description of national research, development, and demonstration (RD&D) efforts worldwide.

08 HYDROGEN↗

Integrated Thermal Energy Storage and Brayton Cycle Equipment Demonstration (Integrated TESTBED) Project Design Basis

The Integrated Thermal Energy Storage and Brayton cycle Equipment Demonstration (Integrated TESTBED) project seeks to retire commercial-scale risks associated with the design, integration,and operation of a supercritical carbon dioxide (sCO2) power cycle and concentrating solar power (CSP) thermal energy storage (TES) system. This requires an understanding of commercial-scale collector system transient impacts on the TES system, the dynamics of heat exchange from theTES to the power cycle, and the control and operation of the power cycle to accommodate various dispatch strategies. In order to retire these risks, Heliogen has proposed to construct a 5 MWe CSP demonstration facility based on directly heated particle and sCO2 technology. The receivers, primary heat exchanger, and power cycle will be deployed at a full commercial scale based on Heliogen’s modular plant architecture to ensure actual system integration risks are validated during design, construction, and operation. This work summarizes the design basis for the Integrated TESTBED project demonstration facility including a design target for capacity factor to support test operations, hours of storage, particle silo arrangement, centrifugal article receivers, a diffusion bonded particle-sCO2 heat exchanger, and a 5 MWe (net) integrally geared sCO2 recompression Brayton cycle.

14 SOLAR ENERGY↗

Plug Load Management System Field Study: Wireless Meter and Controls

This presentation offers background on GSA's Green Proving Ground (GPG) and DOE's High Impact Technology (HIT) Catalyst work, and a field study that assessed a plug load management (PLM) system in two commercial building applications. The Ibis InteliNetwork (TM) PLM system enables users to measure and analyze device energy use and identify opportunities for reduction of plug load energy use, and set times for individual devices (or groups of devices) to turn off when not in use. The presentation gives an overview of the PLM demonstration project, its results, and lessons learned.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Medial vestibular connections with the hypocretin (orexin) system

The mammalian medial vestibular nucleus (MVe) receives input from all vestibular endorgans and provides extensive projections to the central nervous system. Recent studies have demonstrated projections from the MVe to the circadian rhythm system. In addition, there are known projections from the MVe to regions considered to be involved in sleep and arousal. In this study, afferent and efferent subcortical connectivity of the medial vestibular nucleus of the golden hamster (Mesocricetus auratus) was evaluated using cholera toxin subunit-B (retrograde), Phaseolus vulgaris leucoagglutinin (anterograde), and pseudorabies virus (transneuronal retrograde) tract-tracing techniques. The results demonstrate MVe connections with regions mediating visuomotor and postural control, as previously observed in other mammals. The data also identify extensive projections from the MVe to regions mediating arousal and sleep-related functions, most of which receive immunohistochemically identified projections from the lateral hypothalamic hypocretin (orexin) neurons. These include the locus coeruleus, dorsal and pedunculopontine tegmental nuclei, dorsal raphe, and lateral preoptic area. The MVe itself receives a projection from hypocretin cells. CTB tracing demonstrated reciprocal connections between the MVe and most brain areas receiving MVe efferents. Virus tracing confirmed and extended the MVe afferent connections identified with CTB and additionally demonstrated transneuronal connectivity with the suprachiasmatic nucleus and the medial habenular nucleus. These anatomical data indicate that the vestibular system has access to a broad array of neural functions not typically associated with visuomotor, balance, or equilibrium, and that the MVe is likely to receive information from many of the same regions to which it projects.

Non-NASA Center↗

International Research Reactor Decommissioning Project

Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement to the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reedsport PB150 Deployment and Ocean Test Project

As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem was successfully integrated into the spar at the fabricator’s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.

16 TIDAL AND WAVE POWER↗

The Pine Ridge-Mayo National Aeronautics and Space Administration Telemedicine Project: Program Activities and Participant Reactions

OBJECTIVE: To determine the response of participants to the Pine Ridge-Mayo National Aeronautics and Space Administration telemedicine project. DESIGN: We describe a 3-month demonstration project of medical education and clinical consultations conducted by means of satellite transmission. Postparticipation questionnaires and a postproject survey were used to assess the success of the activity. MATERIAL AND METHODS: Patients and employees at the Pine Ridge Indian Health Service Hospital in southwestern South Dakota and employees at Mayo Clinic Rochester participated in a telemedicine project, after which they completed exit surveys and a postproject questionnaire to ascertain the acceptability of this mode of health care. RESULTS: Almost all Pine Ridge and Mayo Clinic participants viewed the project as beneficial. The educational sessions received favorable evaluations, and almost two-thirds of the patients who completed evaluations thought the consultation had contributed to their medical care. More than 90% of the respondents from Pine Ridge and more than 85% of the respondents from Mayo Clinic Rochester said that they would recommend participation in this project to others. More than 90% of respondents from Pine Ridge and 80% of Mayo respondents agreed with the statement that the project should continue. CONCLUSION: These data suggest that a program of clinical consultation services, professional education, and patient education available by telemedicine might be viewed as beneficial.

United States Indian Health Service↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗