A Corrosion Test Station for Improved Characterization and Examination Capabilities of Advanced Nuclear Reactor Fuels and Materials
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
A high burnup commercial spent fuel segment was re-fabricated into a pressurized test train for fuel safety testing in the Irradiated Fuels and Examination Laboratory (IFEL) hot cell facility at Oak Ridge National Laboratory. Descriptions of the in-cell re-fabrication capabilities and assembly of the loss-of-coolant-accident (LOCA) test train are provided. An in-cell integral LOCA test was performed in the Severe Accident Test Station (SATS) by subjecting the fuel segment to a steam environment, internal pressure, temperatures up to 1200 ºC, and water quench.
The purpose of this work was to assess the performance of high temperature membranes and observe the impact of different parameters, such as water-to-carbon ratio, carbon formation, hydrogen formation, efficiencies, methane formation, fuel and oxidant utilization, sulfur reduction, and the thermal efficiency/electrical efficiency relationship, on fuel cell performance. A 250 KW PEM fuel cell model was simulated [in conjunction with Argonne National Laboratory (ANL) with the help of the fuel cell computer software model (GCtool)] which would be used to produce power of 250 kW and also produce steam at 120oC that can be used for industrial applications. The performance of the system was examined by estimating the various electrical and thermal efficiencies achievable, and by assessing the effect of supply water temperature, process water temperature, and pressure on thermal performance. It was concluded that increasing the fuel utilization increases the electrical efficiency but decreases the thermal efficiency. The electrical and thermal efficiencies are optimum at ~85% fuel utilization. The low temperature membrane (70oC) is unsuitable for generating high-grade heat suitable for useful cogeneration. The high temperature fuel cells are capable of producing steam through 280oC that can be utilized for industrial applications. Increasing the supply water temperature reduces the efficiency of the radiator. Increasing the supply water temperature beyond the dew point temperature decreases the thermal efficiency with the corresponding decrease in high-grade heat utilization. Increasing the steam pressure decreases the thermal efficiency. The environmental impacts of fuel cell use depend upon the source of the hydrogen rich fuel used. By using pure hydrogen, fuel cells have virtually no emissions except water. Hydrogen is rarely used due to problems with storage and transportation, but in the future, the growth of a “solar hydrogen economy” has been projected. Photovoltaic cells convert sunlight into electricity. This electricity can be used to split water (electrolysis) into hydrogen and oxygen, to store the sun's energy as hydrogen fuel. In this scenario, fuel cell powered vehicles or generating stations have no real emissions of greenhouse or acid gases, or any other pollutants. It is predominantly during the fuel processing stage that atmospheric emissions are released by a fuel cell power plant. When methanol from biomass is used as a fuel, fuel cells have no net emissions of carbon dioxide (CO2, a greenhouse gas) because any carbon released was recently taken from the atmosphere by photosynthetic plants. Any high temperature combustion, such as that which would take place in a spark ignition engine fueled by methanol, produces nitrous oxides (NOx), gases which contribute to acid rain. Fuel cells virtually eliminate NOx emissions because of the lower temperatures of their chemical reactions. Fuel cells, using processed fossil fuels, have emissions of CO2 and sulfur dioxide (SO2) but these emissions are much lower than those from traditional thermal power plants or spark ignition engines due to the higher efficiency of fuel cell power plants. Higher efficiencies result in less fuel being consumed to produce a given amount of electricity or to travel a given distance. This corresponds to lower CO2 and SO2 emissions. Fuel cell power plants also have longer life expectancies and lower maintenance costs than their alternatives.
This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.
The widescale consumer adoption of hydrogen fuel cell electric vehicles (HFCEVs) is currently hindered by the high cost of small-scale hydrogen generation and the lack of extensive hydrogen refueling infrastructure. Natural gas-based hydrogen is cheaper when produced in large volumes but is also associated with high CO 2 emissions. To counter these challenges, we propose a hybrid approach where both natural gas and renewables are integrated in a synergistic manner using a dynamic process intensification technology that can be deployed on-site for meeting local demands of refueling stations. The technology is based on sorption enhanced steam methane reforming (SE-SMR) that utilizes a combination of reaction with in-situ CO 2 adsorption for enhancing process modularity, productivity and efficiency thereby outperforming conventional SMR at small scale. We develop a mixed integer linear programming (MILP)-based optimization framework for simultaneous design and scheduling of the SE-SMR process. The simultaneous optimization provides a synergistic combination whereby the renewables allow sustainable hydrogen manufacturing and the dynamic SE-SMR allows optimal use of the intermittency of the renewables. The U.S. nationwide analysis indicates that for futuristic renewable prices and a hydrogen production capacity of 2 ton/day, hydrogen can be produced at 50% less cost compared to the current cost of small-scale hydrogen generation. Finally, the city-wise analysis with varying hydrogen demand shows that even with just 5% HFCEV market penetration level, hydrogen production cost less than $3/kg can be obtained at small scales across the United States with even cheaper hydrogen for large cities.
The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.
Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)
This report presents the results of a 10-year project conducted by Air Products and Chemicals, Inc. (Air Products) to determine the feasibility of coproducing hydrogen with electricity. The primary objective was to demonstrate the technical and economic viability of a hydrogen energy station using a high-temperature fuel cell designed to produce power and hydrogen. This four-phase project had intermediate go/no-go decisions and the following specific goals: Complete a technical assessment and economic analysis of the use of high-temperature fuel cells, including solid oxide and molten carbonate, for the co-production of power and hydrogen (energy park concept).
Key design issues of the regenerative fuel cell system concept were studied and a design definition of an alkaline electrolyte based engineering model system or low Earth orbit missions was completed. Definition of key design issues for a regenerative fuel cell system include gaseous reactant storage, shared heat exchangers and high pressure pumps. A power flow diagram for the 75 kW initial space station and the impact of different regenerative fuel cell modular sizes on the total 5 year to orbit weight and volume are determined. System characteristics, an isometric drawing, component sizes and mass and energy balances are determined for the 10 kW engineering model system. An open loop regenerative fuel cell concept is considered for integration of the energy storage system with the life support system of the space station. Technical problems and their solutions, pacing technologies and required developments and demonstrations for the regenerative fuel cell system are defined.
On March 11, 2011, the Fukushima Daiichi Nuclear Power Plant, owned by Tokyo Electric Power Company, encountered a beyond design basis earthquake/tsunami and the flood crippled the on-site emergency power and electric transmission systems. The ELAP (Extended Loss of Alternating Current Power) and LUHS (Loss of Ultimate Heat Sink) events severely damaged the core cooling systems and the safety functions of the containment. As a result, three reactor cores were damaged. Also, the cooling capability of nuclear spent fuel pools was lost due to loss of AC and DC power. Existing Station Blackout (SBO) analyses have demonstrated that even with leakage from Reactor Coolant Pump (RCP) seals, the core could maintain coolable only when heat transfer exists between primary loop and secondary loop. Depend on the availability of DC power in different plant designs, the SBO coping times were shown to be 4 to 16 hours. According to INPO event report, it is necessary to analyze the consequences if current coping times are extended with increased core water inventory loss from pump seals. In an ELAP scenario, all active system including Emergency Core Cooling System (ECCS) and motor driven AFW were out of power supply, results in degradation of core cooling capability. Moreover, the fuel exposed risk would increase due to continuously Reactor Coolant System (RCS) inventory loss through pump seals. Therefore, mitigation strategy must be applied prior to core uncovering to prevent its damage and assure plant safety. This research utilized a fast running NPP safety simulation code, PCTRAN, to assess reactor performances in the situations of ELAP of Maanshan PWR. Also, the sensitivity study of injection flow rates and effectiveness of mitigation strategy were demonstrated. (authors)
In Fukushima Daiichi Nuclear Power Station, before retrieval of molten fuel debris inside PCV, the operation such as decontamination, survey, repair and taking sample of fuel debris are implemented step by step. In case of investigation inside primary containment vessel (PCV), some remotely operated robots have been used for because human can't access to high radiation environment. Because a radiation dose is very high in PCV, therefore it is necessary to prevent the leak of radiation from PCV when a robot is inserted in PCV. Then a pipe of 100 mm inside diameter was let go through by the PCV wall, and the seal box which was completely sealed up attached to the end of pipe. The robot is put in the seal box beforehand and is inserted inside PCV through the pipe. So it is necessary for the robot to be small. In addition, it is necessary to be stable movement on rough plane inside PCV. Therefore shape change type robot 'PMORPH' was developed. This robot consists of three parts of the slim main body and two crawlers attached to the both ends of main body. When this robot is passed in the pipe, three parts lie in a straight line like 'I' shape. And when the robot moves on a rough plane, three parts are formed like 'U' shape. We minimized the use of electric parts in the main body against high radiation environment. And this robot carries a winch to let a sensor unit descend to basement floor. And we carried out the basement floor investigation (B2 investigation) using the robot to obtain information of fuel debris condition in March, 2017. As a result, some information of basement floor condition was acquired. In this paper, it is described the outline of the shape change robot and summary of the B2 investigation. (authors)
Not Available
Hydrogen stations today serve the emerging market of light duty fuel cell vehicles, primarily in California with over 30 public retail locations. There has been a steady increase in the number of stations open and hydrogen dispensed, especially in the last two years. From 2015 to 2016, the annual amount of hydrogen dispensed increased from 27,400 kg to 109,200 kg, a nearly fourfold increase in just one year. One station dispensed nearly 12,000 kg in the second quarter of 2017. Despite the significant progress, gaps exist between current infrastructure capabilities and future requirements. For example, fuel cell vehicle applications such as buses, medium-duty, and heavy-duty trucks will gain market share and this must be considered as future customers at hydrogen stations. The expected number of light duty fuel cell vehicles in California alone are expected to grow from approximately 4,000 to over 13,000 by 2020, and 37,000 by 2023. To serve the multiple mobile fuel cell technologies and increased demand, hydrogen stations will have to increase output, decrease cost, and improve reliability. To address these challenges, the project team will demonstrate a hydrogen-focused integrated renewable energy production, storage, and transportation fuel distribution/retailing system. The proposed R&D tasks address key challenges related to light duty station/component reliability and development and validation of high flow rate system models for new applications like medium and heavy-duty truck fueling.
The concept and performance of (SAMSI) Spacecraft Array for Michelson Spatial Interferometry, an orbiting spatial interferometer comprised of three free-flying spacecraft, two collector telescopes and a central mixing station are described. In the one-dimensional interferometry mode orbits exist which provide natural scanning of the baseline. These orbits place extremely small demands on thrusters and fuel consumption. Resolution of 0.00001 arcsecond and magnitude limits of mv = 15 to 20 are achievable in a single orbit. In the imaging mode, SAMSI could synthesize images equivalent to those produced by equal diameter filled apertures in space, making use of the fuel resupply capability of a space station. Simulations indicate that image reconstruction can be performed with milliarcsecond resolution to a visual magnitude 12 in 12 hr of spiral scanning integration time.
This paper describes a control system that uses small (0.1-N) hydrogen-fueled, high-expansion-ratio resistojets to control a Space Station's position and attitude. The number and size of the resistojets is calculated based on requirements for stationkeeping, compensation for steady-state gravity-gradient and aerodynamic torques, momentum loading due to mobile remote manipulator motion, Shuttle Orbiter docking, and translational evasive maneuvering. The all-resistojet control system performs continuous orbit maintenance while keeping the linear accelerations on the spacecraft lower than they would be without any control system operating.
Characterization of individual fuel rods using gamma spectroscopy is a standard part of the Post Irradiation Examinations performed on experimental fuel at the Halden Boiling Water Reactor. However, due to handling and radiological safety concerns, these measurements are presently carried out only at the end of life of the fuel, and not earlier than several days or weeks after its removal from the reactor core. In order to enhance the fuel characterization capabilities at the Halden facilities, a gamma tomography measurement system is now being constructed, capable of characterizing fuel assemblies on a rod-by-rod basis in a more timely and efficient manner. Gamma tomography for measuring nuclear fuel is based on gamma spectroscopy measurements and tomographic reconstruction techniques. The technique, previously demonstrated on irradiated commercial fuel assemblies, is capable of determining rod-by-rod information without the need to dismantle the fuel. The new gamma tomography system will be stationed close to the Halden reactor in order to limit the need for fuel transport, and it will significantly reduce the time required to perform fuel characterization measurements. Furthermore, it will allow rod-by-rod fuel characterization to occur between irradiation cycles, thus allowing for measurement of experimental fuel repeatedly during its irradiation lifetime. The development of the gamma tomography measurement system is a joint project between the Inst. for Energy Technology - OECD Halden Reactor Project, Westinghouse (Sweden), and Uppsala Univ.. (authors)
This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology.
Throughout its history, Cal State LA has been in the forefront of advanced energy and transportation technologies. The station is located at the intersection of two major highways in Los Angeles region and has a convenient access. It is capable of producing up to 60 kg/day and can fuel 15-20 vehicles per day. Cal State LA had partnered with DOE to establish a robust station operation and performance data collection program. This consisted of equipping the station with additional instrumentation and collecting fueling performance data for several years. The data was further furnished to NREL for processing and agglomeration with data from other stations. In addition to fueling, maintenance and failure events were shared as well as hydrogen purity reports. The station has also undergone several upgrades in fueling protocols and hardware for improved performance and code compliance.