Design of a shipping fixture for a compact cryomodule hermetic assembly

Two conduction-cooled 915 MHz superconducting radio frequency hermetic assemblies must be safely transported from the Jefferson Lab in Newport News, VA to General Atomics in San Diego, CA for perfor-mance testing in a custom horizontal test cryostat. One hermetic assembly consists of a 2-cell 915 MHz cavity, a coaxial fundamental power coupler, and the warm-to-cold transition beam tubes. The second hermetic assembly consists of a 2-cell 915 MHz cavity only. The assemblies will be transported on a flatbed air-ride trailer over the approximate 4000 km distance. Design requirements included adequate attenuation of 4g vertical axis, 5g beamline axis, and 1.5g lateral axis shock events. The isolation system was designed using helical wire-rope isolators with modal and transient finite element analysis performed in Ansys. Results show shock attenuation of a 10 ms half-sine pulse input to < 1g in the vertical axis, < 1.5g in the beam-line axis, and < 0.5g in the lateral axis for both assem-blies at the specified design loads and all structural stresses are kept below the material yield limits. Addi-tionally, the natural frequencies of both isolation sys-tems adequately attenuate the fundamental modes of the critical structures.

Accelerator Physics↗

Application of an Embedded Fracture and Borehole Modeling Approach to the Understanding of EGS Collab Experiment 1

EGS Collab is a series of meso-scale experiments and associated numerical simulation activities being funded by the United States Department of Energy, Geothermal Technologies Office (GTO) to investigate enhanced geothermal system processes under in-situ stress and slightly elevated temperature conditions. This project is designed to provide scientists and engineers with immediate access to impermeable rock at scales larger than possible in the laboratory, but generally smaller than those for commercial production. Immediate access to rock is provided via the existing drifts of the former Homestake Gold Mine, now operated as the Sanford Underground Research Facility in Lead, South Dakota. The objectives of the EGS Collab project are to develop well controlled fracture networks between injector and producer boreholes using normal and shear stimulation for permeability enhancement. The first experimental site was located off the West Access drift on the 4850 Level (4850 feet below ground surface) in phyllite of the Precambrian Poorman formation, and involved the creation of a fracture network comprising a combination of hydraulic and natural fractures. A second experimental site is now being considered near the battery alcove on the 4100 Level in amphibolite and rhyolite of the Yates Unit. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO’s flagship EGS research effort. Experiment 1 has comprised a series of successful tests, including a long-term chilled-water circulation test, but the testbed has two atypical EGS elements. Active ventilation in the adjacent drift over a 50-year period cooled the testbed rock mass and hydraulic fracturing intersected monitoring boreholes making them conduits for fluid flow. Numerical simulations executed in support of the design of the EGS Collab Experiment 1, computed a radial temperature distribution and stress gradient orthogonal to the drift axis, resulting in the forecast of an oblong hydraulic fracture geometry, extended in the direction of the drift from the stimulation borehole. This paper describes the numerical simulation of long-term chilled-water circulation test with an embedded fracture and borehole modeling approach. The principal objective of the simulation work is show agreement between experimental observations in terms of production fluid temperatures, monitoring borehole temperatures, injection and production pressures, and tracer recoveries using a single conceptual model for the fracture network, using characterization and monitoring data generally available for EGS. A secondary objective is to improve the numerical simulation result comparisons with additional data available from the broader monitoring equipment within the testbed versus deeper, hotter, and more remote EGS. One complicating factor for comparisons between the numerical simulation results and experimental observations, is the Joule-Thomson heating associated with large pressure drops across the fracture network.

numerical simulation, embedded fractures and boreh↗

Effects of break geometry and orientation on helium-air mixing in simulated reactor cavities of high temperature gas reactors

Here, this study experimentally examined the spatial and temporal variations in air and helium concentrations and temperature fields within simulated reactor cavities of a High Temperature Gas Reactor (HTGR) following helium discharge into an initially air-filled reactor cavity system. Detailed temperature maps were generated using a combination of fiber optics temperature sensor and multiple thermocouple probes within the simulated reactor cavities. The research scenario involved a hypothetical small pipe break in the Reactor Pressure Vessel, resulting in the release of high-temperature helium into the surrounding cavity. A scaled multi-compartment experimental facility, modeled after the General Atomics Modular High Temperature Gas Reactor (GA-MHTGR) design, was constructed for helium and air mixing experiments. Oxygen sensors and thermocouple probes were installed in all five cavities to measure the concentrations of oxygen (or helium) and the temperature distributions of the gas mixture. The experimental findings highlighted the significant impact of the injected helium jet velocity on the gas mixing process and demonstrated how the direction of the helium jet influences the air-helium temperature profiles within the cavities.

Air-ingress↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scalable, low-cost ink-based processing of high-performance silver selenide thermoelectrics

The growing global energy demand and its accelerating contribution to climate change emphasize the urgent need for sustainable energy conversion/harvesting technologies. Thermoelectric (TE) devices offer a compelling route to directly convert waste heat into electricity and enable solid-state cooling without moving parts or harmful refrigerants. Achieving their full potential requires not only higher TE performance (zT) but also scalable, low-cost manufacturing processes. Here, we introduce a transformative ink-based processing approach for scalable manufacturing of high-performance silver selenide-based TE materials and devices. Using a simple, high-throughput ink-mixing and blade coating strategy, our Ag 2 Se-based materials under the optimized composition and processing conditions yield an ultrahigh room-temperature power factor of 2.8 mW m −1 K −2 , over 100% higher than baseline samples and a reproducible figure of merit zT of 1 at room temperature. A thermoelectric generator (TEG) achieves a very competitive power density of 112 mW cm −2 at a 90 °C temperature difference between the hot and cold sides of the device, which is among the highest reported for silver selenide-based TE devices to date. This facile, scalable ink-based processing establishes a practical pathway toward industrial-scale manufacturing and widespread adoption of thermoelectric devices, advancing sustainable energy technologies.

Bappy, Md. Omarsany [University of Notre Dame, IN ↗

Nuclear Safety [Vol. 32, No. 4, October-December 1991]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 477 Report on the International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety—PSA '91, S. Chakraborty and M. Khatib-Rahbar; 488 Good Relationships Are Pivotal in Nuclear Data Bases, A. S. Heger and B. V. Koen; 494 Technical Note: The Interagency Nuclear Safety Review Panel's Evaluation of the Ulysses Space Mission, J. A. Sholtis, Jr., D. A. Huff, L. B. Gray, N. P. Klug, and R. O. Winchester; ACCIDENT ANALYSIS: 502 The Severe Accident Analysis Program for the Savannah River Nuclear Production Reactors, M. L. Hyder; CONTROL AND INSTRUMENTATION: 511 A Framework for Selecting Suitable Control Technologies for Nuclear Power Plant Systems, R. A. Kisner; DESIGN FEATURES: 521 Containments for Gas-Cooled Power Reactors History and Status, P.W. Williams; ENVIRONMENTAL EFFECTS: 537 Indoor Radon: A Natural Risk, N. H. Harley and J.H. Harley; On the Importance of the Atmospheric Parameters in the Fission Products Distribution of a Severe Reactor Accident, M. C. Barla and A. R. Bayulken; Book Review: Health Effects of Exposure to Low Levels of Ionizing Radiation BEIR V, C. R. Richmond; WASTE AND SPENT FUEL MANAGEMENT: 555 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver OPERATING EXPERIENCES: 567 Effects of Component Aging on the Westhinghouse Control Rod Drive System, K. Sullivan and W. Gunther; 577 Reactor Shutdown Experience, Compiled by J. W. Cletcher, 580 Selected Safety-Related Events, Compiled by G. A. Murphy; 582 Operating U 8 Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver, RECENT DEVELOPMENTS: 596 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 610 Reports, Standards, and Safety Guides, D. S. Queener; 614 Proposed Rule Changes as of June 30, 1991; ANNOUNCEMENTS: 520 Workshop on PC PRAISE: A Probabilistic Fracture Mechanics Personal Computer Code for Nuclear Power Plant Piping Reliability Assessment; 536 Fifth Workshop on Nuclear Power Plant Containment Integrity; 624 New OECD "International Information System on Occupational Exposure (ISOE)"; 625 Harvard School of Public Health Announces Short Courses; 625 Eighth Power Plant Dynamics, Control and Testing Symposium; 626 Second Training Course on Off-Site Emergency Planning and Response for Nuclear Accidents; 618 The Authors; 622 Reviewers of Nuclear Safety, Vol 32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nuclear Safety [Vol. 30, No. 1, January-March 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 International Conference on Thermal Reactor Safety: NUCSAFE 88 by A. P. Malinauskas and J. G. Pruett; ACCIDENT ANALYSIS: 18 Chernobyl Today: State of Research by A. Yu. Gagarinskii; CONTROL AND INSTRUMENTATION: 23 Problems Associated with Routine In-Plant Radioactive Effluent Monitoring Systems at U.S. Light-Water Reactors by Barry G. Wahlig, David M. Walker, Mahmoud R. Ghavi, and John M. Palms; DESIGN FEATURES: 34 Twentieth DOE/NRC Nuclear Air-Cleaning Conference by R. R. Bellamy, D. W. Moeller, and M. W. First, 46 Design Options for the Core Support Structure for Liquid-Metal-Cooled Reactor Plants by J. P. Burelbach, W. J. Kann, J. G. Saiveau, and R. W. Seidensticker; ENVIRONMENTAL EFFECTS: 53 The Radiological Consequences of the Chernobyl Accident by L. V. Konstantinov and A. J. González; WASTE AND SPENT FUEL MANAGEMENT: 70 Activities Related to Waste Management Compiled by E. G. Silver; OPERATING EXPERIENCES: 80 Fuel Performance Annual Report for 1986 by W. J. Bailey, 103 Safety Considerations Related to 12-Hour Shift Schedules by S. Gould, 105 Reactor Shutdown Experience Compiled by J. W. Cletcher, 108 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 130 General Administrative Activities Compiled by E. G. Silver, 140 Reports, Standards, and Safety Guides by D. S. Queener, 145 Status of Power-Reactor Licensing Activities Compiled by E. G. Silver, 153 Proposed Rule Changes as of Sept. 30, 1988; ANNOUNCEMENTS: 69 Northwestern University Short Course on Radiation Safety, 79 International Seminar on Fission Product Transport Processes in Reactor Accidents, 129 Harvard School of Public Health Offers Short Courses, 152 MIT Offers Summer Short Courses on Reactor Safety and Nodal Analysis, 152 Seminar on Use of PCs in Probabilistic Safety Analysis, 157 The Authors, 160 Indexes to Nuclear Safety, Volume 29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimizing the Heisenberg Vortex Tube for Hydrogen Cooling (Final Technical Report)

Hydrogen utilization at Plug Power sites ranges between 70-93% with the remainder vented and lost to the atmosphere. The goal of this project was to improve hydrogen utilization at Plug Power fulfillment centers via the patented Heisenberg vortex tube (HVT). The HVT combines conventional counterflow vortex tubes with para-orthohydrogen conversion catalyst to allow the cooling of hydrogen flows with no moving parts or external energy inputs. In year 1 of this project the HVT was evaluated to improve hydrogen utilization via the following concepts: 1) increasing liquid hydrogen pump volumetric efficiency by 20% through vapor separation and subcooling of the liquid, 2) reducing liquid hydrogen storage tank boil-off losses by 20% through thermal vapor shielding (TVS), and 3) increase isentropic efficiency of supercritical hydrogen expansion at 40-50 K, from 31% to over 40%. The TVS concept was selected as the most favorable application for further development. While the conceptual analysis was underway, the cryocatalysis hydrogen experiment facility (CHEF) was retrofitted with a new cryocooler, higher pressure condenser tanks, and in-situ fiber-optic Raman probes for ortho-parahydrogen composition analysis at the inlets and outlets of the HVT. To our knowledge this is the first in-situ implementation of cryogenic Raman probes for ortho-parahydrogen analysis. Subsequent testing of catalyzed and non-catalyzed HVT identified a low flow rate, high-conversion efficacy regime well suited for TVS development. Computational fluid dynamics (CFD), Reduced order modeling (ROM), and quantum Monte Carlo atomistic simulations were applied to optimize the design of the HVT implemented for TVS. The simulations and analysis identified a ruthenium-based catalyst as the most optimal for high conversion with little pressure losses and was matched to experimental measurements. These results indicated the design could achieve the 20% boil-off reduction target. An HVT field-trial was designed and constructed by Plug Power and implemented at a customer site. However, budget limitations reduced the amount of catalyst that could be applied to the HVT. With the reduced amount of catalyst, CFD analysis estimated about 3% reduction in boil-off. A similar amount of boil-off reduction was observed during preliminary measurements during tank commissioning. However, the results have a large margin for error and were operated at relatively low tank temperatures when the HVT has the lowest potential for improvement. This project demonstrated the use of para-orthohydrogen catalysis for reducing liquid hydrogen tank boil-off losses. The field trial system is anticipated to provide long-term experimental measurements on tank operational performance that will allow Plug Power to instrument additional tanks in the future. Recommendations for future work include the development of higher activity, lower cost para-orthohydrogen conversion catalyst for use in the HVT. Tank process optimizations could maximize the efficacy of the HVT and further improve hydrogen utilization.

08 HYDROGEN↗

Defining a compact dry cooler design to reduce LCOE contribution in a CSP facility

Concentrating solar power (CSP), when coupled with a supercritical carbon dioxide (sCO 2 ) power cycle and sensible heat storage, presents a renewable and clean alternative for utility-scale power generation. However, in order to be competitive in the current and future markets, CSP facilities must limit their levelized cost of electricity (LCOE) by minimizing capital costs and reducing operating costs over the lifetime of the plant. Targeting this goal, this study investigates the LCOE impact of the power cycle pre-cooler. This study considers a compact dry cooler with micro-channel technology on the CO 2 side and formed fin geometry on the air side, using directly-coupled centrifugal fans and a transition duct to improve air distribution across the fins as well as protect the fins from contaminants which may cause blockage, soiling, fouling, and damage. In an effort to better understand the dry cooler impact on LCOE, a sensitivity study was conducted using various combinations of end-to-end approach temperatures, air-side pressure drop values, CO 2 -side pressure drop values, fan types, cooler turndown control schemes, cooler module sizes, and design-point ambient temperatures. Furthemore, off-design cycle performance data was calculated for each dry cooler design using NPSS simulation software; cycle performance data were then input to System Advisor Model (SAM) along with the associated capital costs for LCOE prediction of a 100 MW system over a 30 year plant lifetime. Results of this study show the LCOE is most sensitive to air-side performance, followed by heat transfer effectiveness and capital cost. It was found that a power cycle with a mid- to high-performance dry cooler will produce the most competitive power-production costs. Designing at the extreme ends for approach temperature (or effectiveness), design-point ambient temperature, and compactness (footprint) produce higher LCOE values; mid-range values for these parameters balance performance, operating costs, and associated capital cost to optimize LCOE.

14 SOLAR ENERGY↗

Code Benchmark of Depressurized Conduction Cooldown Transient in the High Temperature Test Facility

This paper presents results from modeling of a depressurized conduction cooldown (DCC) transient at the High Temperature Test Facility (HTTF) as part of the OECD-NEA Thermal Hydraulics Code Validation Benchmark for High-Temperature Gas-Cooled Reactors using HTTF Data . This paper briefly describes the benchmark and the models being used. It then presents a comparison of steady state and transient results based on the Problem 2 Exercise 1A and 1B definitions. We compare block and helium temperature distributions, mass flow distribution, and energy balance in steady state. All models show comparable mass flow distributions and energy balances. The temperatures within the core and outer regions are comparable in all models too, but inner reflector temperatures can vary significantly. Despite that, we find that the models are in good agreement for the full-power steady state. In the DCC, we look at block temperature at the core midplane and RCCS water exit temperature. The INL and ANL models are found to be in excellent agreement with one another on block temperature over time, while the agreement when the KAERI and NRG models are added into consideration is good. Differences in the transient heat removal from the RCCS cause the differences in block temperature over time in these models. The CNL models show similar trends to the INL, ANL, KAERI, and NRG models, but the temperatures are high because the volumes used in calculating the average temperature include the heater rods in the CNL models only. The HUN-REN model shows results that suggest significantly lower heat removal in the RCCS which merit further investigation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fuel-Cladding Eutectic Study of Legacy Fast Flux Test Facility (FFTF) MFF HT9/U-10Zr Metallic Fuel

This report presents the first systematic investigation of fuel-cladding eutectic interaction (FCEI) in irradiated HT9/U-10Zr metallic fuel from the Fast Flux Test Facility (FFTF) Materials Fuels Form (MFF) program, using differential scanning calorimetry (DSC) coupled with scanning electron microscopy (SEM) and energy dispersive X-ray spectroscopy (EDS). Two irradiated fuel cross-sections, MNT07H (9.5 at% burnup, x/L = 0.78) and MNT08H (7.0 at% burnup, x/L = 0.93), were subjected to three successive isothermal annealing rounds (R1–R3) at 820°C for 20 minutes each, yielding a cumulative transient duration of one hour. This study directly addresses a recognized gap in the existing FCEI database, which previously lacked irradiated HT9/U-10Zr data at burnup levels above 8 at%. Two principal findings emerge from the study. First, for both samples, FCEI remained spatially confined within the pre-existing fuel-cladding chemical interaction (FCCI) zone boundaries after R3, with no measurable eutectic penetration into unaffected cladding beyond the original FCCI layer. This self-limiting behavior is consistent with historical Fuel Behavior Test Apparatus (FBTA) results and is attributed to the near-eutectic phase composition of the FCCI zone, which rapidly absorb the available eutectic-forming constituents and then stall penetration once the FCCI zone is consumed. A comparison with unirradiated surrogate data further supports this mechanism: whereas a U–34 at.% Fe sample would be expected to show ~176 µm of iron penetration under comparable conditions, the irradiated samples exhibited only ~20 µm, a discrepancy attributed to irradiation-induced interfacial porosity and pre-existing FCCI composition gradients. Second, for MNT08H, FCEI was observed exclusively on the half of the cladding circumference where pre-existing steady-state FCCI was present, with no detectable FCEI on the opposite half. Three hypotheses are proposed to explain this asymmetry: the inhibiting role of a zirconium-rich rind at the fuel-cladding interface; the chemical sequestration of iron by redistributed zirconium within the fuel matrix; and the persistence of fuel-cladding gaps on the FCEI-free half that preclude direct contact. All three hypotheses require further experimental investigation. The results extend the empirical FCEI database into higher-burnup territory and demonstrate the viability of DSC-based testing as a substitute for the no-longer-available FBTA apparatus. Future work will include additional cross-section testing, compilation of the full FCEI dataset, model evaluation, and DSC testing of ternary fuel compositions to broaden the experimental basis for safety assessment of sodium-cooled fast reactor systems.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

X-ray imaging and electron temperature evolution in laser-driven magnetic reconnection experiments at the national ignition facility

We present results from x-ray imaging of high-aspect-ratio magnetic reconnection experiments driven at the National Ignition Facility. Two parallel, self-magnetized, elongated laser-driven plumes are produced by tiling 40 laser beams. A magnetic reconnection layer is formed by the collision of the plumes. A gated x-ray framing pinhole camera with micro-channel plate detector produces multiple images through various filters of the formation and evolution of both the plumes and current sheet. As the diagnostic integrates plasma self-emission along the line of sight, two-dimensional electron temperature maps ⟨Te⟩Y are constructed by taking the ratio of intensity of these images obtained with different filters. The plumes have a characteristic temperature ⟨Te⟩Y=240 ± 20 eV at 2 ns after the initial laser irradiation and exhibit a slow cooling up to 4 ns. The reconnection layer forms at 3 ns with a temperature ⟨Te⟩Y=280 ± 50 eV as the result of the collision of the plumes. The error bars of the plumes and current sheet temperatures separate at 4 ns, showing the heating of the current sheet from colder inflows. Using a semi-analytical model, we survey various heating mechanisms in the current sheet. We find that reconnection energy conversion would dominate at low density (ne≲7×1018 cm−3) and electron-ion collisional drag at high-density (≳1019 cm−3).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Ice Cryo-Encapsulation Balloon (Project ICEBall) Field Campaign Report

The Ice Cryo-Encapsulation Balloon (ICEBall) field campaign was designed to sample the ice crystals that compose high-altitude cirrus with a passive device. The campaign made use of a new instrument, ICEBall, which is a balloon-borne ice crystal sampling system. The ice crystal sounding system is capable of measuring ice crystal concentration, temperature, atmospheric pressure, ice crystal habit, aerosol particle morphology, and residual composition. The 3-kg instrument is carried upwards at 5 m s-1 by a high-altitude balloon. The instrument can be cut down from the balloon at any altitude up to 20 km, and the apparatus returns to the surface by parachute. Basic measurements such as temperature and pressure are recorded onboard, and high-frequency Global Positioning System (GPS) records altitude and latitude/longitude. Ice crystal concentrations are measured through the use of a high-resolution video camera mounted on the device. Ice crystals are collected through an open aperture leading to insulated collection chambers cooled with dry ice. Upon exiting the top of the cloud system, the chamber aperture is closed, and the ~1 mm3 sample cell is magnetically sealed and isolated at -78 °C, ensuring that ice particles do not sublimate or grow after collection. Once the crystals are returned to the surface, they are double-sealed and immersed at liquid nitrogen temperature in “dry-cryo shippers” before being transported back to the laboratory. Dr. Magee’s laboratory at The College of New Jersey contains a cryo-stage scanning electron microscope (SEM), which was used to interrogate the crystals and aerosol particles. The main purpose of this pilot field campaign was to provide an unprecedented level of detail on the crystal habits and ice surface complexity in mid-latitude cirrus, which may help resolve issues associated with habit identification and classification in cirrus. The ICEBall campaign was originally scheduled to run from March 28 to April 18 of 2021 at the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) Southern Great Plains observatory. The COVID-19 pandemic intervened and caused us to shift the dates of the experiment to October 16-November 6 of 2021. This period is also climatologically favorable for cirrus. The approximately six-month gap between our original field campaign dates and the actual dates afforded us the opportunity to build two new ICEBall payload instruments. These instruments were tested during an August 2021 trip to The College of New Jersey. During this field testing phase, we decided to launch the ICEBall payload upstream from the ARM SGP site with the goal of landing in the vicinity of the site. Our goal was to sample the ice crystals before the cirrus were advected over the remote-sensing instruments at the SGP site. The team assembled for the field campaign consisted of the Principle Investigator (PI) and Co-Principle Investigator (Co-PI) (Drs. Harrington and Magee), The Pennsylvania State University research scientist Dr. Alfred Moyle, and two graduate students (Ms. Marley Majetic and Gwenore Pokrifka). The team operated out of a house rented in Enid, Oklahoma. We successfully sampled seven cirrus cloud systems during the three-week field campaign (October 21, 23-26, 31, and November 1). This was a much higher success rate than either of the PIs anticipated (our goal was closer to sampling three or four cases). The balloon was typically launched from oil pads or farm fields northwest of Enid and the payload was typically retrieved somewhat north of the SGP site. We never landed directly at the SGP site, and so did not need regular access to the SGP facilities. Our greatest concern going into the field campaign was the longer-term storage of crystals in the -196°C cryo dry-shipper dewars and the subsequent transport across the country. We had tested storage and transport prior to the field campaign, but we had never stored crystals for a few weeks nor had we transported the dewars over long distances. To our great relief, the storage and transport worked flawlessly and we were able to image a large number of crystals from six of the seven cases. Working with the staff at the ARM SGP office was excellent. They not only helped us find the sources we needed for helium, liquid nitrogen, and other materials, but also helped with contacts within the Federal Aviation Administration (FAA) and Vance Air Force Base. One goal of our field project was to tie the in situ measurements of ice crystal habits to the radar signatures derived from the Ka-band ARM Zenith-pointing Radar (KAZR). Unfortunately KAZR was down for the duration of our experiment. However, the Ka-band Scanning ARM Cloud Radar (KASACR) was put into vertically pointing mode during the ICEBall campaign and those data, along with Doppler lidar measurements, have proved very useful.

54 ENVIRONMENTAL SCIENCES↗

Identifying Challenges in Safeguards for Metallic Fuel Fabrication Facilities

As new advanced reactors gain popularity, there is an increasing interest in metallic fuel fabrication for fast reactors. While metallic fuels themselves are not a new idea, as many of the first reactors employed metallic fuels, new designs, compositions, and fabrication methods are appearing throughout the nuclear community. As the interest grows and facilities are constructed, both domestic and international safeguards will need to be heavily involved to support safeguards-by-design (SBD) measures from the start. This work compiles a review of historical and modern fuel types and fabrication methods, fabrication processes, safeguards gaps, and potential safeguards solutions. Metallic nuclear fuel types have been around for many decades and were included in some of the first reactors including the Experimental Breeder Reactor (EBR)-I and -II, the Fermi 1 reactor, the Integral Fast Reactor (IFR), and the Dounreay Fast Reactor (DFR). These reactors used various compositions including pure uranium (U) metal, U-zirconium (Zr) alloys, plutonium (Pu)-aluminum (Al) alloys, U-fissium (Fs) alloys, U-Pu-Zr alloys, and U-molybdenum (Mo) alloys [1, 2, 3, 4, 5]. These small alloying additions are included to improve the material properties of the pure U metal. The alpha-phase U (stable below 661C) suffers elongation in one direction causing grain boundary cracking and increasing creep rate due to irradiation growth, thermal cycling, and preferential crystal orientation. It is ideal to utilize the gamma-phase U (typically stable above 769C) by adding small amounts of alloying elements such as Zr or Mo to stabilize this phase down to room temperature [3]. Additionally, some research has been focused on U with transuranic (TRU) elements present, typically coming from the used fuel recycling process. Including these elements in fast reactor fuel can aid in the reduction of nuclear waste by burning minor long-lived actinides. However, the additions of TRU elements can cause concerns to arise when trying to fabrication or safeguard metallic fuels. A typical metallic fuel element is shown in Figure 1. Sodium is added into the cladding to create a thermal bond between the fuel slug and cladding wall. The fuel slug is then inserted and the end plug is welded on to the top of the fuel element. A gas plenum is left to create a headspace for gaseous fission products to escape rather than continue to build in the fuel itself [1, 5]. Other fuel element geometries exist as well, such as the Lightbridge twisted cruciform geometry shown in Figure 2 [6]. This design allows for better cooling performance and provides room for fuel rod swelling without impacting the fuel rod diameter. There are many different fabrication methods for metallic fuels, which is one of the many benefits of these fuel types. Many of these fabrication methods are relatively easy and cost-efficient. The most popular fabrication method is injection casting, sometimes called vacuum induction melting (VIM), shown in Figure 3 [4, 8, 9, 7, 10]. This method was largely used for EBR-II fuel fabrication. The injection casting system is contained inside of a vessel consisting of a Y2O3-coated graphite crucible surrounded by an induction coil with ZrO2-coated quartz molds suspended above the crucible. The fuel feedstock is placed inside of the graphite crucible and melted using the induction furnace. The induction furnace utilizes a dual frequency with the high frequency melting the feedstock and the low frequency causing stirring of the melted feedstock to form a homogeneous mixture. The mixture is heated to approximately 1600C in an argon environment. The vessel is evacuated and then the quartz molds are lowered into the graphite crucible containing the molten metal and the vessel is repressurized to inject the metal fuel upwards into the molds. The molds are removed and then shattered to release the fuel slugs. This fabrication method was used to fabricate 39,000 metallic fuel pins for EBR-II. While injection casting has been the most common metallic fuel fabrication method throughout the decades, many other methods have been explored including low-pressure gravity casting, microwave casting, continuous casting, centrifugal casting, coextrusion, and many others [11, 12, 8, 13, 14, 15]. Some of these methods aim to mitigate challenges that arise with americium (Am) volatilization during the casting process for TRU-containing fuel feedstocks, an issue with injection casting. Coextrusion is one of the methods explored at the Idaho National Laboratory (INL) and has been utilized for the initial fabrication tests of Lightbridge's unique fuels, as well as other metallic fuels with cladding coextruded. In this process, large billets are formed and machined and then inserted into a molten salt bath for approximately 30 minutes. The billets are then loaded into the extrusion press and extruded. This process can be seen in Figure 4 [15].

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RELAP5-3D Modeling of High Temperature Test Facility (HTTF) Test PG-26

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a scaled integral effects experiment designed to investigate transient behavior in high-temperature gas-cooled nuclear reactors with prismatic fuel and reflector blocks. Several tests have been completed, and more are still planned to at the HTTF, including depressurized conduction cooldown (DCC) and pressurized conduction cooldown (PCC) transients. This report analyses test PG-26, a progression of the Double Ended Inlet-Outlet Crossover Duct Break transient that is referred to as a DCC. PG-26 has been performed at the HTTF between May 30 and June 30, 2019. Core initial conditions (i.e., before the DCC started) have been met using low power (<100 kW) and two of ten available electric heaters. The DCC transient was initiated during the 50 th hour of the test. The break valves were opened, and hot helium from the core and cold helium from the reactor cavity simulation tank (RCST) started mixing. The gases flowed in a countercurrent fashion, where the top half of the hot duct contained hot helium that flowed in one direction and cold helium that flowed in the other direction in the bottom half of the duct. After the pressure and density reached equilibrium, the event entered a diffusion mode. The onset of a reverse natural circulation was not observed during the DCC period of the test. Version 4.4.2ie of the RELAP5-3D computer code has been used to model the HTTF PG-26 test, and results have been compared to available high-quality measured data. The model used in this study is the quality-controlled HTTF RELAP5-3D model (HTTF base 2018-04-19 QA), originally developed by P. Bayless. The report includes RELAP5-3D results of the “base calculations” as well as some sensitivities to important uncertain model inputs, such as primary helium mass flow rate, core ceramic thermal properties, as well as heat evacuation and loop friction models. Using the base RELAP5-3D model predicts a countercurrent helium flow in the hot duct observed at the beginning of the DCC, but instead of going into a molecular diffusion mode, the model predicts the onset of natural convection. Increasing friction in the core and hot duct prevents the natural convection from happening in some of the simulations. Although some temperatures are well predicted (and even overpredicted), the general tendency is to underpredict the ceramic and helium temperatures and heat removal rates during the DCC, resulting in many of the assessment findings being in minimal or insufficient agreement with the data. It is worth noting that the described discrepancies between measured data and RELAP5-3D predictions are not RELAP5-3D code limitations. More so, they reflect limitations in boundary condition and thermal property knowledge. While the RELAP5-3D calculations of the test provide some insights into what happens during the transient, and point to missing or potentially uncertain data to which the experimenters can direct their attention, the principal conclusion is that the PG-26 test data are insufficient for a system code assessment.