Search NASA⌕ Search

SEARCH · Search NASA

Results for “GSFC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Multi-Organization Multi-Discipline Effort Developing a Mitigation Concept for Planetary Defense

There have been significant recent efforts in addressing mitigation approaches to neutralize Potentially Hazardous Asteroids (PHA). One such research effort was performed in 2015 by an integrated, inter-disciplinary team of asteroid scientists, energy deposition modeling scientists, payload engineers, orbital dynamist engineers, spacecraft discipline engineers, and systems architecture engineer from NASAs Goddard Space Flight Center (GSFC) and the Department of Energy (DoE) National Nuclear Security Administration (NNSA) laboratories (Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratories (LLNL) and Sandia National Laboratories). The study team collaborated with GSFCs Integrated Design Centers Mission Design Lab (MDL) which engaged a team of GSFC flight hardware discipline engineers to work with GSFC, LANL, and LLNL NEA-related subject matter experts during a one-week intensive concept formulation study in an integrated concurrent engineering environment. This team has analyzed the first of several distinct study cases for a multi-year NASA research grant. This Case 1 study references the Near-Earth Asteroid (NEA) named Bennu as the notional target due to the availability of a very detailed Design Reference Asteroid (DRA) model for its orbit and physical characteristics (courtesy of the Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) mission team). The research involved the formulation and optimization of spacecraft trajectories to intercept Bennu, overall mission and architecture concepts, and high-fidelity modeling of both kinetic impact (spacecraft collision to change a NEAs momentum and orbit) and nuclear detonation effects on Bennu, for purposes of deflecting Bennu.

Planetary Defense↗

Early Warning Look Ahead Metrics: The Percent Milestone Backlog Metric

All complex development projects experience delays and corresponding backlogs of their project control milestones during their acquisition lifecycles. NASA Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) teamed with The Aerospace Corporation (Aerospace) to develop a collection of Early Warning Look Ahead metrics that would provide GSFC leadership with some independent indication of the programmatic health of GSFC flight projects. As part of the collection of Early Warning Look Ahead metrics, the Percent Milestone Backlog metric is particularly revealing, and has utility as a stand-alone execution performance monitoring tool. This paper describes the purpose, development methodology, and utility of the Percent Milestone Backlog metric. The other four Early Warning Look Ahead metrics are also briefly discussed. Finally, an example of the use of the Percent Milestone Backlog metric in providing actionable insight is described, along with examples of its potential use in other commodities.

acquisition lifecycles↗

Use of Open Networks and Delay-Tolerant Protocol to Decrease WAN Latency of EOS near Real-Time Data

Since 1999, NASA's Earth Observing System Data Operations System (EDOS) project at Goddard Space Flight Center (GSFC) has provided high-rate data capture, level zero processing, and product distribution services for a majority of NASA's EOS (Earth Observing System) high-rate missions, including Terra, Aqua, Aura, ICESat, EO-1, SMAP, and OCO-2. EDOS high-rate science and engineering (150-300 Mbps) data-driven capture systems are deployed at 7 worldwide ground stations which are connected via both private (closed) and public (open) wide area networks (WANs) to the centralized EDOS Level Zero Processing Facility (LZPF) located at GSFC, where the data is processed and Level 0 products are distributed to users worldwide. All data transferred over the open networks to GSFC traverse an IPSec tunnel, providing the same level of security as a VPN connection. EDOS produces both time-based and near real-time products (session-based). Near real-time data products are produced from a single ground station contact; time-based products are produced from multiple ground station contacts. EDOS is the primary supplier of EOS Level 0 data to the NASA near real-time user community known as the Land, Atmosphere Near real-time Capability for EOS (LANCE). For the past few years, EDOS has streamlined its systems to reduce WAN latency for near real-time data delivery, including implementing Quality of Service (QoS), expanding closed network bandwidth, adding open network connections with more bandwidth, and implementing a delay-tolerant protocol to mitigate long round-trip times to remote ground stations.

Delay-Tolerant Protocol↗

Supplier Research & Analysis Approach

"The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supplier Research and Analysis (SRA) capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 95 reports since its start-up in early 2015. This presentation addresses the approach, methodology and performance of the Supplier Research and Analysis (SRA) capability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability."

supplier research and analysis↗

Analysis of the NGXO Telescope X-Ray Hartmann Data

Next Generation X-Ray Optics (NGXO) team at the Goddard Space Flight Center (GSFC) has been developing a new silicon-based grazing incidence mirror technology for future high resolution x-ray astronomical missions. Recently, the GSFC team completed the construction of first few mirror modules that contain one pair of mirrors. One of the mirror pairs was tested in GSFC 600-m long beamline facility and Panter (Neuried, Germay) 120-m long x-ray beamline facility. Both full aperture x-ray tests, Hartmann tests, and focal plane sweeps were completed. In this paper we present the data analysis process and compare the results from our models to measured x-ray centroid data, x-ray performance data, and out of focus images of the mirror pair.

Spaceborne telescopes↗

Supply Chain Research and Analysis for Space Systems

The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supply Chain Research and Analysis capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 105 reports since its start-up in early 2015.This presentation addresses the approach, methodology and performance of the Supply Chain Research and Analysiscapability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability.

supply chain risk management↗

Lidar Validation Measurements at the NOAA Mauna Loa Observatory NDACC Station

NASA's Goddard Space Flight Center (GSFC) transported two lidar instruments to the NOAA facility at the Mauna Loa Observatory (MLO) on the Big Island of Hawaii, to participate in an official, extended validation campaign. This site is situated 11,141 ft. above sea level on the side of the mountain. The observatory has been making atmospheric measurements regularly since the 1950's, and has hosted the GSFC Stratospheric Ozone (STROZ) Lidar and the GSFC Aerosol and Temperature (AT) Lidar on several occasions, most recently between November, 2012 and November, 2015. The purpose of this extended deployment was to participate in Network for the Detection of Atmospheric Composition Change (NDACC) Validation campaigns with the JPL Stratospheric Ozone Lidar and the NOAA Temperature, Aerosol and Water Vapor instruments as part of the routine NDACC Validation Protocol.

Lidar↗

Regularization and Error Characterization of GRACE Mascons

We present a new global time-variable gravity mascon solution derived from Gravity Recovery and Climate Experiment (GRACE) Level 1B data. The new product from the NASA Goddard Space Flight Center (GSFC) results from a novel approach that combines an iterative solution strategy with geographical binning of inter-satellite range-acceleration residuals in the construction of time-dependent regularization matrices applied in the inversion of mascon parameters. This estimation strategy is intentionally conservative as it seeks to maximize the role of the GRACE measurements on the final solution while minimizing the influence of the regularization design process. We fully reprocess the Level 1B data in the presence of the final mascon solution to generate true post-fit inter-satellite residuals, which are utilized to confirm solution convergence and to validate the mascon noise uncertainties. We also present the mathematical case that regularized mascon solutions are biased, and that this bias, or leakage, must be combined with the estimated noise variance to accurately assess total mascon uncertainties. The estimated leakage errors are determined from the monthly resolution operators. We present a simple approach to compute the total uncertainty for both individual mascon and regional analysis of the GSFC mascon product, and validate the results in comparison with independent mascon solutions and calibrated Stokes uncertainties. Lastly, we present the new solution and uncertainties with global analyses of the mass trends and annual amplitudes, and compute updated trends for the global ocean, and the respective contributions of the Greenland Ice Sheet, Antarctic Ice Sheet, Gulf of Alaska, and terrestrial water storage. This analysis highlights the successful closure of the global mean sea level budget, that is, the sum of global ocean mass from the GSFC mascons and the steric component from Argo floats agrees well with the total determined from sea surface altimetry.

B. D. Loomis↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

Plankton, Aerosol, Cloud, Ocean Ecosystem (PACE) Mission Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test and qualify the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Observatory. PACE is currently in the design phase of mission implementation. It is scheduled to launch in 2022, extending and improving NASA's twenty-year record of satellite observations of global ocean biology, aerosols and clouds. PACE will advance the assessment of ocean health by measuring the distribution of phytoplankton, which are small plants and algae that sustain the marine food web. It will also continue systematic records of key atmospheric variables associated with air quality and the Earth's climate. The PACE observatory is comprised of the spacecraft and three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The spacecraft and the OCI, which is the primary instrument, are developed and integrated at the NASA Goddard Space Flight Center (GSFC). The OCI is a hyper-spectral scanning (HSS) radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and aerosol particle science. The HARP2 and SPEXone are secondary instruments on the PACE observatory, acquired outside of GSFC. The Hyper-Angular Rainbow Polarimeter instrument (HARP2) is a wide swath imaging polarimeter that is capable of characterizing atmospheric aerosols for purposes of sensor atmospheric correction as well as atmospheric science. The SPEXone provides atmospheric aerosol and cloud data at high temporal and spatial resolution. This paper will focus on the Integration and Test (I&T) activities for the PACE mission at NASA GSFC. This I&T phase consists of mechanical, electrical and thermal integration and test of all the spacecraft subsystems and the integration of the instruments with the spacecraft. The PACE observatory environmental tests include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity. This paper will also discuss the observatory shipment to the launch site as well as the launch site processing.

Petro, Susanna↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Regularization and Error Characterization of GRACE Mascons

We present a new global time-variable gravity mascon solution derived from Gravity Recovery and Climate Experiment (GRACE) Level 1B data. The new product from the NASA Goddard Space Flight Center (GSFC) results from a novel approach that combines an iterative solution strategy with geographical binning of inter-satellite range-acceleration residuals in the construction of time-dependent regularization matrices applied in the inversion of mascon parameters. This estimation strategy is intentionally conservative as it seeks to maximize the role of the GRACE measurements on the final solution while minimizing the influence of the regularization design process. We fully reprocess the Level 1B data in the presence of the final mascon solution to generate true post-fit inter-satellite residuals, which are utilized to confirm solution convergence and to validate the mascon noise uncertainties. We also present the mathematical case that regularized mascon solutions are biased, and that this bias, or leakage, must be combined with the estimated noise variance to accurately assess total mascon uncertainties. The estimated leakage errors are determined from the monthly resolution operators. We present a simple approach to compute the total uncertainty for both individual mascon and regional analysis of the GSFC mascon product, and validate the results in comparison with independent mascon solutions and calibrated Stokes uncertainties. Lastly, we present the new solution and uncertainties with global analyses of the mass trends and annual amplitudes, and compute updated trends for the global ocean, and the respective contributions of the Greenland Ice Sheet, Antarctic Ice Sheet, Gulf of Alaska, and terrestrial water storage. This analysis highlights the successful closure of the global mean sea level budget, that is, the sum of global ocean mass from the GSFC mascons and the steric component from Argo floats agrees well with the total determined from sea surface altimetry.

Loomis, B. D.↗

Lessons for Future In-Space Telerobotic Servicing from Robotic Refueling Mission

The Robotic Refueling Mission (RRM) was a multi-phased technology development effort by the National Aeronautics & Space Administration (NASA) and the Canadian Space Agency (CSA). The program leveraged the existing robotic systems and expertise of the International Space Station (ISS) program and the tool design and satellite servicing expertise of NASA’s Exploration & In-space Services (NExIS) Projects Division at Goddard Space Flight Center (GSFC) to evaluate new hardware and techniques for on-orbit telerobotic servicing. Between 2011 and 2021, two external ISS payloads housed over a dozen robotic tools and adapters designed to service a variety of existing and novel satellite interfaces. Robot operators at NASA’s Johnson Space Center (JSC) and CSA used the Special Purpose Dexterous Manipulator (SPDM) to retrieve and operate these tools for tasks such as cutting wires or multi-layer insulation blanketing, removing valve caps, mating electrical connectors, transferring fluids, and performing visual inspections inside a vehicle. Each phase of RRM involved years of preparation. Tool and interface designs were prototyped and evaluated using both NASA and Canadian ground robotic systems. Procedures were developed by GSFC engineers and vetted in partnership with JSC and CSA robot operators. GSFC engineers were trained to provide real-time support during on-orbit operations. These preparatory efforts and the successful on-orbit evaluations yielded an array of lessons for future in-space telerobotic missions. Designing robotic tools for the space environment requires special consideration of materials, indicators, and differences between ground and flight use cases and environments. When there is a limited window for on-orbit operations, devoting time and high-fidelity hardware to ground testing can be critical. Needs during potential troubleshooting are more essential to camera view quality, frame rate, and position requirements more than nominal operations. Detailed hardware manuals, nominal and contingency procedures, along with clearly defined operations team roles and protocols are vital for efficiency. RRM also demonstrated how the ISS can be utilized to increase the technology readiness levels required for future missions and led to additional technology partnerships between NExIS and the ISS program. The lessons from RRM are currently being applied to designs, operations concepts, and ground test methodology for missions such as On-orbit Servicing, Assembly, and Manufacturing1(OSAM-1)and Mars Sample Return.

Zakiya Tomlinson↗

Development of Improved Thermal Analysis Capabilities at the NASA Goddard Space Flight Center

Goddard Space Flight Center (GSFC) has been developing a framework of additional analysis capabilities to aid in the verification, development, and execution of thermal models using the OpenTD Application Programming Interface (API). This paper provides a brief overview of the data structures, properties, methods, and relationships between the objects accessible through the current API and describes some of the algorithms necessary to implement the desired functions at GSFC. Some example code snippets are also provided to aid potential users in the development of their own utilities. Following the overview are descriptions and algorithm methodologies of the new capabilities added to the GSFC framework, including: a new PI heater/controller approach for improved steady state predictions, selective copying of symbol over-rides from one source CaseSet to destination CaseSet(s), comparison of submodel object counts between a source and destination model to verify model integration, comparison of thermo-optical and thermo-physical properties between models, and improved display of extracted thermo-optical and thermo-physical properties for documentation.

ThermalDesktop↗

Development of Improved Thermal Analysis Capabilities at the NASA Goddard Space Flight Center

Goddard Space Flight Center (GSFC) has been developing a framework of additional analysis capabilities to aid in the verification, development, and execution of thermal models using the OpenTD Application Programming Interface (API). This paper provides a brief overview of the data structures, properties, methods, and relationships between the objects accessible through the current API and describes some of the algorithms necessary to implement the desired functions at GSFC. Some example code snippets are also provided to aid potential users in the development of their own utilities. Following the overview are descriptions and algorithm methodologies of the new capabilities added to the GSFC framework, including: a new PI heater/controller approach for improved steady state predictions, selective copying of symbol over-rides from one source CaseSet to destination CaseSet(s), comparison of submodel object counts between a source and destination model to verify model integration, comparison of thermo-optical and thermo-physical properties between models, and improved display of extracted thermo-optical and thermo-physical properties for documentation.

ThermalDesktop, API, v6.2, OpenTD↗

Technology Development of a Solid State 266 nm Laser for NASA’s Dragonfly Mission

NASA’s Dragonfly mission is a rotorcraft lander which will explore several geologic locations on Saturn’s moon, Titan and investigate evidence of surface-level prebiotic chemistry as well as search for chemical signatures of water-based and/or hydrocarbon-based life. To perform molecular composition investigations in-situ, the payload includes the Dragonfly Mass Spectrometer (DraMS), being developed at NASA’s Goddard Space Flight Center (GSFC). DraMS will utilize laser desorption mass spectrometry (LDMS) to interrogate surface samples and measure the organic composition. Enabling this science capability is the Throttled Hydrocarbon Analysis by Nanosecond Optical Source (THANOS) laser being developed at NASA-GSFC. The THANOS laser is comprised of a solid state, passively Q-Switched Nd:YAG oscillator which is frequency converted to 266 nm and utilizes a RTP high voltage electro-optic for pulse energy control. The laser outputs <2.0 ns pulses with a maximum energy of approximately 200 uJ which can be emitted in 1 - 50 shot bursts at 100 Hz while performing LDMS science operations. While operating, the laser has the capability to throttle its UV pulse energy output from full attenuation to maximum energy to provide varying levels of fluence on samples in the DraMS instrument. This paper reports the technology development and space qualification effort of the THANOS laser including vibration, thermal vacuum cycling, radiation as well as Titan atmospheric composition optical damage testing performed at NASA-GSFC from 2019 through 2022.

Matthew W Mullin↗

Initial Test Results for NASA Goddard’s Low-Cost Optical Terminal Adaptive Optics System

This presentation presents the testing approach and initial laboratory test results of the Adaptive Optics (AO) Subassembly (AOS) for the Low-Cost Optical Terminal (LCOT), a low-cost and flexible optical communications ground terminal. Leveraging commercial components and subassemblies wherever possible, LCOT is being developed by the NASA Goddard Space Flight Center (GSFC) Advanced Communications Capabilities for Exploration and Science Systems (ACCESS) project. An economical ground terminal allows NASA to create a global optical terminal network and enables the expansion of direct-to-Earth (DTE) optical communications. Located at the Goddard Geophysical and Astronomical Observatory (GGAO), LCOT is in the development phase and will receive first light during initial testing beginning in 2023. This new optical terminal includes a 700 mm Ritchey-Chretien commercial telescope, able to track Low Earth Orbit (LEO) spacecraft, receive instruments specified from 1500 - 1600 nm, and an uplink transmit optical system. Demodulation of optical coherent modulation formats requires downlink signal coupling into single-mode fiber. Due to atmospheric turbulence, signals experience wavefront distortions creating speckle patterns larger than the fiber core and high jitter requiring precise beam steering. AO is necessary to correct atmospheric turbulence effects and allow efficient coupling of received signals. In 2020, GSFC contracted with General Atomics to provide the LCOT AO system. This system has been delivered to GSFC in September 2021 and has been tested in laboratory to evaluate performance. This paper describes the laboratory testing approach, turbulence phase plate design, test results, and the AO field testing plan when installed on the LCOT telescope.

Adaptive Optics↗

Mission Overview and Status IGARSS Conference

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). The PACE project office at NASA’s GSFC is responsible for the satellite development, launch and operations. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which will include field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The mission is planned for launch into a Sun synchronous polar orbit at 676.5 km with an inclination of 98 degrees and a 1 pm local ascending node crossing time. The PACE observatory is comprised of three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The OCI is the primary instrument on the observatory and is being developed at Goddard Space Flight Center (GSFC). The OCI is a hyperspectral scanning radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and atmospheric aerosol science [2]. The HARP2 and SPEXone are complimentary instruments on the PACE observatory, acquired outside of GSFC. The HARP2 is multi-spectral, wide swath (supporting atmospheric correction of OCI), and hyper-angular, with capabilities for cloud science that exceed what is capable from OCI alone. The SPEXone is narrow swath, multi-angular, and hyperspectral, with capabilities for atmospheric aerosol science that exceed what can be accomplished with OCI. NASA Headquarters directed the mission development to be guided by a Design-to-Cost (DTC) process. All elements of the mission, other than the cost, are in the DTC trade space. At the heart of the DTC process are the mission studies, performed across all the mission elements. The mission studies were used to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. Baseline mission requirements are a product of the mission studies and are defined by the project office as part of the DTC process. At the time of this writing, OCI, HARP2 and SPEXone are integrated onto the PACE spacecraft, creating the PACE observatory. The instruments and spacecraft subsystems are undergoing combined functional performance testing in preparation for observatory-level environmental testing prior to shipment to the launch site. Here, we will provide an update on science capabilities and observatory readiness for its early 2024 launch.

remote sensing↗