Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

First flight performance of the Micro-X microcalorimeter X-ray sounding rocket

The flight of the Micro-X sounding rocket on July 22, 2018, marked the first operation of transition-edge sensors and their superconducting quantum interference device readouts in space. Here, the instrument combines the microcalorimeter array with an imaging mirror to take high-resolution spectra from extended X-ray sources. The first flight target was the Cassiopeia A supernova remnant. Although a rocket pointing malfunction led to no time on-target, data from the flight were used to evaluate the performance of the instrument and demonstrate the flight viability of the payload. The instrument successfully achieved a stable cryogenic environment, executed all flight operations, and observed X-rays from the on-board calibration source. The flight environment did not significantly affect the performance of the detectors compared with ground operation. The flight provided an invaluable test of the impact of external magnetic fields and the instrument configuration on detector performance. This flight provides a milestone in the flight readiness of these detector and readout technologies, both of which have been selected for future X-ray observatories.

79 ASTRONOMY AND ASTROPHYSICS↗

MIT January Operational Internship Experience

This viewgraph presentation describes the MIT January Operational Internship Experience (JOIE) program. The topics include: 1) Landing and Recovery; 2) Transportation; 3) Shuttle Processing; 4) Constellation Processing; 5) External Tank; 6) Launch Pad; 7) Ground Operations; 8) Hypergolic Propellants; 9) Environmental; 10) Logistics; 11) Six Sigma; 12) Systems Engineering; and 13) Human Factors.

Bosanac, Natasha↗

2021 NE-XF Pathways Internship Student Showcase Presentation

Branch of Fluid Mechanics concern with the mechanics and properties of gases and its application to engineering systems. Applications of Pneumatics in the Aerospace systems: (1) Flight Hardware - Reaction Control, Systems, Rocket Pressure Fed Systems (2) Ground Operations – Valve Actuation, Inert Environment (Purge), Tube Drying/Cleaning NE-XFPneumatics Engineering provides design & operation expertise to support EGS. Commodities used at KSC systems: Gaseous Helium (GHe) Gaseous Oxygen (GO2) Gaseous Nitrogen (GN2) Breathing Air (BAIR) Support other subsystems: LH2, LO2, Ground Main Propulsion System (GMPS), etc.

Environmental and Life Support Systems↗

SIRIUS: Simulation Infrastructure for Research on Interoperating Unmanned Systems

This paper presents the Simulation Infrastructure for Research on Interoperating Unmanned Systems (SIRIUS), a research framework for simulation and analysis of future conceptual Urban Air Mobility (UAM) operations. SIRIUS is being developed under the auspices of the NASA Air Traffic Management eXploration project, UAM subproject (ATM-X UAM). SIRIUS provides an intuitive, highly configurable graphical user interface to design complex traffic scenarios and airspace configurations representative of conceptual UAM operations. Aircraft simulated with SIRIUS can be equipped with flight-tested capabilities for detect and avoid (DAA), geofencing, distributed merging and spacing, path conformance, and path planning while executing time-constrained, 4D trajectories generated by a UAM ground operations system. Central to the design of the SIRIUS simulation framework is the capability to evaluate the integration and interoperability of ground-based separation services (e.g., strategic separation) with extended DAA functionality (e.g., path monitoring, separation provision, merging and spacing, etc.) The simulation environment also supports modelling of wind, navigation, and sensor uncertainties, as well as communication delays. SIRIUS enables distributed simulation of large-scale scenarios. An interactive graphical analysis capability helps isolate, visualize, and compare relevant vehicle state data and widely used measures of performance metrics across multiple scenarios.

Andrew Peters↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗

Nuclear Safeguards Applications Employing Unmanned Airborne Vehicles

This paper describes some potential applications for UAVs (Unmanned Aerial Vehicles) in international nuclear safeguards. UAV missions can include indoor and outdoor operations including: 1) surveillance, which includes all types of sensors and imagers, 2) command and control augmentation (radio relays and real-time imagery used primarily to coordinate ground operations), and 3) physical sample collection and transport.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

Schwabacher, Mark↗

Planetary operations for the Pioneer Venus Orbiter mission

The Pioneer Venus Orbiter was inserted into Venus orbit on December 4, 1974 and is expected to operate until 1992. This paper discusses the scientific objectives of the Pioneer Venus Orbiter Project components, i.e., the Orbiter spacecraft, the atmosphere entry Probes, and the probe Bus, together with the design and operation characteristics of the Orbiter. Consideration is also given to the science instruments of the Orbiter, to their requirements with respect to pointing, orientation, and timing, and to the ground operations system. The Probes, the Bus, and the Orbiter were selected to study Venus in complementary ways: the Probes by sounding through most of the atmosphere at four locations, the probe Bus by sounding through the upper atmosphere during entry, and the Orbiter by in situ planet-wide observations of the ionosphere and the extreme upper atmosphere, and by examining the surface and interior remotely. In addition, the Orbiter also observes the interactions of Venus with the solar environment.

Jackson, Robert W.↗

NASA Langley's Aircraft Landing Dynamics Facility

The Aircraft Landing Dynamics Facility (ALDF) is a unique facility with the ability to test aircraft landing gear systems on actual runway surfaces at operational ground speeds and loading conditions. A brief historical overview of the original Landing Loads Track (LLT) is given, followed by a detailed description of the new ALDF systems and operational capabilities.

Davis, Pamela A.↗

Spaceflight Operations Services Grid (SOSG) Project

The motivation, goals, and objectives of the Space Operations Services Grid Project (SOSG) are covered in this viewgraph presentation. The goals and objectives of SOSG include: 1) Developing a grid-enabled prototype providing Space-based ground operations end user services through a collaborative effort between NASA, academia, and industry to assess the technical and cost feasibility of implementation of Grid technologies in the Space Operations arena; 2) Provide to space operations organizations and processes, through a single secure portal(s), access to all the information technology (Grid and Web based) services necessary for program/project development, operations and the ultimate creation of new processes, information and knowledge.

Bradford, Robert↗

Automation and Robotics for space operation and planetary exploration

This paper presents a perspective of Automation and Robotics (A&R) research and developments at NASA in terms of its history, its current status, and its future. It covers artificial intelligence, telerobotics and planetary rovers, and it encompasses ground operations, operations in earth orbit, and planetary exploration.

Montemerlo, Melvin D.↗

Information Systems for Crew-Led Operations Beyond Low-Earth Orbit

On past and present human space missions, the management of vehicle health and status has primarily been executed from Earth. Missions such as Apollo, Space Shuttle, and ISS have relied on a safety net of ground-based experts with access to real-time telemetry data, broad and deep systems expertise, and powerful analytical and computing capabilities. The ground team monitors and manages the vehicle’s health in real-time and responds quickly to critical situations and malfunctions. Ground operators also provide real-time oversight and verbal guidance to flight crew members, especially during complex procedure execution and high-risk activities like extra-vehicular activities. However, this operational paradigm, in place for 60 years, will not transfer to long duration exploration missions beyond low Earth orbit (LEO). Lunar and deep-space crewed missions will encounter delayed communications that prohibit real-time operational and medical support. Additionally, there will be infrequent resupply and a diminished capacity to evacuate or rescue crew members. A small crew must operate independently, managing the vehicle’s state, responding to time-critical events, and executing complex procedures, all without the safety net of real-time support.

data representation↗

Impact of Space Transportation System on planetary spacecraft and missions design

Results of Jet Propulsion Laboratory (JPL) activities to define and understand alternatives for planetary spacecraft operations with the Space Transportation System (STS) are summarized. The STS presents a set of interfaces, operational alternatives, and constraints in the prelaunch, launch, and near-earth flight phases of a mission. Shuttle-unique features are defined and coupled with JPL's existing program experience to begin development of operationally efficient alternatives, concepts, and methods for STS-launched missions. The time frame considered begins with the arrival of the planetary spacecraft at Kennedy Space Center and includes prelaunch ground operations, Shuttle-powered flight, and near-earth operations, up to acquisition of the spacecraft signal by the Deep Space Network. The areas selected for study within this time frame were generally chosen because they represent the 'driving conditions' on planetary-mission as well as system design and operations.

Barnett, P. M.↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Autonomous Assessment and Predictive Capabilities for Low-Altitude Urban Flight Operations

The integration of unmanned aerial vehicles in the national airspace will introduce new vehicle types, technologies, and operational paradigms for which safety must be maintained and hazards mitigated. One approach is to attempt to design for possible hazards and unsafe incidents that can occur at different phases of flight (pre-flight, in-flight, and post-flight) and during ground operations. Another is to mitigate safety incidents by implementing changes to policies, procedures, regulations, and design to cover personnel, equipment, and aircraft during operations. These and other techniques, not described herein, are typically conservative or adhoc in that they reduce the likelihood of risk after safety incidents have occurred. In this work, the goal is to develop a more predictive capability to monitor and mitigate risk and hazards to safety “in-time” enough for decisions to be made. In line with NASA’s Aeronautics Mission Directorate Strategic Thrust 5 [1] (In-Time System-Wide Safety Assurance), the System-Wide Safety (SWS) project under which this work falls, is developing and demonstrating innovative and safety-oriented solutions that enable modernization and aviation transformation. To that effect, this work will detail data-driven efforts on the SWS project to develop a number of safety-critical services for in-time monitoring and mitigation of hazards to low-altitude flight operations. First, hazards to these operations are identified based on previous work by NASA [2,3] and others in the aerospace industry. These hazards include (i) unsafe proximity to other vehicles, property, and people on the ground, (ii) critical system failures such as communication signal/GPS loss, unexpected propulsion system degradation, engine/power failure, and (iii) operational/environmental issues such as severe weather and gusty winds. For these hazards, safety metrics, which can be quantified and assessed are defined, models to monitor and predict them are developed, and flight test data is generated to develop, validate, and test these models, considering the complex interplay of the different hazards that define them [4-6]. In addition, the uncertainty in the non-deterministic effects that cannot be modeled nor predicted and unknown unknowns that arise after design/testing and during operations must be handled in rigorous manner. As a result, for each of the developed safety metrics, their dependencies on one another are characterized and a framework for handling the uncertainties inherent in the modeling, algorithms, and measurements required for prediction is also developed [7]. To that effect, this presentation will describe the safety metrics and services already developed and underway under the System-Wide Safety project that utilize data-driven techniques for the identification of anomalies, precursors, and trends (APTs) to monitor and mitigate hazards to safety, in-time, for urban flight operations in low-altitude airspace.

Okolo, Wendy A.↗

Using Model-Based Reasoning for Autonomous Instrument Operation

Multiprobe missions are an important part of NASA's future: Cluster, Magnetospheric Multi Scale, Global Electrodynamics and Magnetospheric Constellation are representatives from the Sun-Earth Connections Theme. To make such missions robust, reliable, and affordable, ideally the many spacecraft of a constellation must be at least as easy to operate as one spacecraft is today. To support this need for scalability, science instrumentation must become increasingly easy to operate, even as this same instrumentation becomes more capable and advanced. Communication and control resources will be at a premium for future instruments. Many missions will be out of contact with ground operators for extended periods either to reduce operations cost or because of orbits that limit communication to weekly perigee transits. Autonomous capability is necessary if such missions are to effectively achieve their operational objectives. An autonomous system is one that acts given its situation in a mission appropriate manner without external direction to achieve mission goals. To achieve this capability autonomy must be built into the system through judicious design or through a built-in intelligence that recognizes system state and manages system response. To recognize desired or undesired system states, the system must have an implicit or explicit understanding of its expected states given its history and self observations. The systems we are concerned with, science instruments, can have stringent requirements for system state knowledge in addition to requirements driven by health and safety concerns. Without accurate knowledge of the system state, the usefulness of the science instrument may be severely limited. At the same time, health and safety concerns often lead to overly conservative instrument operations further reducing the effectiveness of the instrument. These requirements, coupled with overall mission requirements including lack of communication opportunities and tolerance of environmental hazards, frame the problem of constructing autonomous science instruments. we are developing a model of the Low Energy Neutral Atom instrument (LENA) that is currently flying on board the Imager for Magnetosphere-to-Aurora Global Exploration (IMAGE) spacecraft. LENA is a particle detector that uses high voltage electrostatic optics and time-of-flight mass spectrometry to image neutral atom emissions from the denser regions of the Earth's magnetosphere. As with most spacecraft borne science instruments, phenomena in addition to neutral atoms are detected by LENA. Solar radiation and energetic particles from Earth's radiation belts are of particular concern because they may help generate currents that may compromise LENA's long term performance. An explicit model of the instrument response has been constructed and is currently in use on board IMAGE to dynamically adapt LENA to the presence or absence of energetic background radiations. The components of LENA are common in space science instrumentation, and lessons learned by modelling this system may be applied to other instruments. This work demonstrates that a model-based approach can be used to enhance science instrument effectiveness. Our future work involves the extension of these methods to cover more aspects of LENA operation and the generalization to other space science instrumentation.

Johnson, Mike↗