Search NASA⌕ Search

SEARCH · Search NASA

Results for “Handling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Getting a Handle on the Role of Coenzyme M in Alkene Metabolism

Coenzyme M (2-mercaptoethanesulfonate; CoM) is one of several atypical cofactors discovered in methanogenic archaea which participate in the biological reduction of CO{sub 2} to methane. Elegantly simple, CoM, so named for its role as a methyl carrier in all methanogenic archaea, is the smallest known organic cofactor. It was thought that this cofactor was used exclusively in methanogenesis until it was recently discovered that CoM is a key cofactor in the pathway of propylene metabolism in the gram-negative soil microorganism Xanthobacter autotrophicus Py2. A four-step pathway requiring CoM converts propylene and CO{sub 2} to acetoacetate, which feeds into central metabolism. In this process, CoM is used to activate and convert highly electrophilic epoxypropane, formed from propylene epoxidation, into a nucleophilic species that undergoes carboxylation. The unique properties of CoM provide a chemical handle for orienting compounds for site-specific redox chemistry and stereospecific catalysis. The three-dimensional structures of several of the enzymes in the pathway of propylene metabolism in defined states have been determined, providing significant insights into both the enzyme mechanisms and the role of CoM in this pathway. These studies provide the structural basis for understanding the efficacy of CoM as a handle to direct organic substrate transformations at the active sites of enzymes.

03 NATURAL GAS↗

NESC GN&C TDT Best Practices: Design Requirements for Satisfactory Handling Qualities of a Piloted Spacecraft

This document describes work to determine a proposed set of concise design requirements for manned spacecraft to yield satisfactory handling qualities when the pilot is performing manual control. This is done primary via the analysis of various historic spacecraft. Partial requirements verification is performed via the creation of a simulated pilot used to determine limits of satisfactory vehicle performance. Partial requirements validation is per-formed via example conceptual design of a spacecraft that is compliant with all relevant proposed requirements.

Cooper-Harper↗

Acquisition Strategy for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposition Project

This document describes the design-build acquisition strategy that will be applied to the Remote Handled LLW Disposal Project. The design-build delivery method will be tailored, as appropriate, to integrate the requirements of Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' with the DOE budget formulation process and the safety requirements of DOE-STD-1189, 'Integration of Safety into the Design Process.'

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Handling Pyrophoric Reagents

Pyrophoric reagents are extremely hazardous. Special handling techniques are required to prevent contact with air and the resulting fire. This document provides several methods for working with pyrophoric reagents outside of an inert atmosphere.

36 MATERIALS SCIENCE↗

Project Plan 7930 Cell G PaR Remote Handling System Replacement

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Overview of Spacecraft Design for Piloting, Manual Control, and Handling Qualities

This report addresses techniques to make spacecraft more compatible with human operation. Starting at the highest context, the first section addresses general spacecraft piloting and workload, presenting a conceptual framework, the OODA loop, as a tool for improvement. As a subset of general operability, manual control is addressed in the second section. The concept of a spectrum of control, from fully manual to fully automatic, is introduced here, as is rationale for implementing manual control capabilities in modern spacecraft. Summaries of manual control capabilities for Apollo and Space Shuttle are also provided as examples of successful implementations. Successful manual control requires satisfactory handling qualities, and a high level summary of that topic is provided in the third section.

Handling↗

Dounreay (UK) Shaft and Silo Decommissioning - Remote Handling in an Extreme and Uncertain Environment - 18420

DSRL is a wholly-owned subsidiary of the Cavendish Dounreay Partnership Ltd, a consortium of Cavendish Nuclear, CH2M and AECOM. It is funded by the Nuclear Decommissioning Authority (NDA) to deliver the site closure programme. Today, Dounreay is a site of construction, demolition and waste management, all of it designed to return the site to an interim end state. Dounreay is recognised as the most complex nuclear site closure project in Europe. The experimental nature of many of the sites redundant facilities means the clean-up and demolition requires innovation as well as great care. It is driving innovation in the approach to remote handling and robotics in the highly complex, hazardous and uncertain environment, all within tight financial constraints by UK Government. Veolia Nuclear Solutions (VNS) is instrumental in delivery of the overall solutions for the shaft and silo decommissioning project working with other members of industry and directly for DSRL to deliver the overall concept design for waste treatment as well as specialised equipment to recover highly hazardous and uncertain materials in this unique project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine learning based simultaneous control of air handling unit discharge air and condenser water temperatures set-point for minimized cooling energy in an office building

In this study, an artificial intelligence based real-time prediction and control model to optimize condenser water temperature and discharge air temperature (DAT) set-points in water-cooled air handling unit (AHU) system has been developed. EnergyPlus-MATLAB co-simulation has been conducted to analyze the developed model's effectiveness. Here, to develop artificial neural networks (ANN) model, embedded neural network objects in MATLAB was utilized. The developed model could decide an optimal temperature set-points based on outdoor air wet-bulb temperature to reflect the Korean climate context. As a result, the developed ANN prediction model showed the predictive performance of Cv(RMSE) of approximately 21%. Compared to the conventional fixed temperature algorithm, which fixes AHU DAT at 14°C and condenser water temperature at 32°C, the ANN based optimized control showed a 22% total cooling energy reduction. These results show that significant energy savings can be achieved by simultaneously controlling condenser water temperature and AHU DAT set-points considering Korean climatic characteristics using AI technologies such as ANN models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modelling of air handling unit subsystem in a commercial building

To improve energy efficiency of the Air Handling Unit (AHU), there is a need for a system to monitor energy performance of the AHU in real time, to optimize operation for minimum energy consumption and to calculate energy saving. A mechanical model was created to analyze the performance of subsystems in an AHU and was validated using actual data collected from AHU operation via a wireless monitoring system. Algorithms have been developed to identify malfunctions and estimate the savings if malfunctions are corrected. Here, the model detects control related malfunctions, such as simultaneously turning on the cooling coil and the pre-heating coil. According to the mechanical model of the case study system, a total of 63,455 kWh are wasted within the cooling coil and the pre-heating coil due to this type of control malfunction. Furthermore, the mechanical model can identify other energy savings opportunities due to set point changes; in the case study system, this feature revealed a total of 77,141 kWh energy saving during the same study period. The design, integration, and validation of the mechanical model are described, analyzed, and justified in this paper.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental Investigation of the Effect of Air-Handling and DME-Propane Blends on the Performance and Emissions of a 4-Cylinder CI Engine

Dimethyl ether (DME) is considered an excellent alternative to diesel because of its higher cetane number and lower carbon content. Additionally, DME can be blended with abundantly available propane with minimal modifications to the propane infrastructure. This paper focuses on an experimental investigation of the effect of air-handling i.e., boost pressure and exhaust gas recirculation (EGR), and DME-propane blends on the combustion and emissions performance of a light-duty, four-cylinder, compression ignition (CI) engine. Here, the boost pressure and EGR sweeps were carried out and showed that higher boost pressures resulted in increased brake thermal efficiencies (BTE) at the expense of higher NOx emissions which could be reduced by an increase in EGR. The fuel sweeps were carried out at 0, 15 and 25% propane (neat, 85% and 75% DME) with 0% and 25% EGR. The fuel sweeps indicated that the ignition delay (ID) increased and burn duration (BD) decreased monotonically when the blend increased to 25% propane/75% DME. The results suggest optimum engine performance with neat DME at 105 kPa boost pressure and 25% EGR with propane addition improving the BTE with negligible increase in emissions. Higher contents of Propane, up to 25%, did not affect the variability of combustion, with standard deviations of burn duration and peak cylinder pressures below 1% for all test cases.

air-handling↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seismic Characterization of Basalt Topography at Two Candidate Sites for the INL Remote-Handled Low-Level Waste Disposal Project

This report presents the seismic refraction results from the depth to bed rock surveys for two areas being considered for the Remote-Handled Low-Level Waste (RH-LLW) disposal facility at the Idaho National Laboratory. The first area (Site 5) surveyed is located southwest of the Advanced Test Reactor Complex and the second (Site 34) is located west of Lincoln Boulevard near the southwest corner of the Idaho Nuclear Technology and Engineering Center (INTEC). At Site 5, large area and smaller-scale detailed surveys were performed. At Site 34, a large area survey was performed. The purpose of the surveys was to define the topography of the interface between the surficial alluvium and underlying basalt. Seismic data were first collected and processed using seismic refraction tomographic inversion. Three-dimensional images for both sites were rendered from the data to image the depth and velocities of the subsurface layers. Based on the interpreted top of basalt data at Site 5, a more detailed survey was conducted to refine depth to basalt. This report briefly covers relevant issues in the collection, processing and inversion of the seismic refraction data and in the imaging process. Included are the parameters for inversion and result rendering and visualization such as the inclusion of physical features. Results from the processing effort presented in this report include fence diagrams of the earth model, for the large area surveys and iso-velocity surfaces and cross sections from the detailed survey.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Facility

This performance assessment for the Remote-Handled Low-Level Radioactive Waste Disposal Facility at the Idaho National Laboratory documents the projected radiological dose impacts associated with the disposal of low-level radioactive waste at the facility. This assessment evaluates compliance with the applicable radiological criteria of the U.S. Department of Energy and the U.S. Environmental Protection Agency for protection of the public and the environment. The calculations involve modeling transport of radionuclides from buried waste to surface soil and subsurface media, and eventually to members of the public via air, groundwater, and food chain pathways. Projections of doses are calculated for both offsite receptors and individuals who inadvertently intrude into the waste after site closure. The results of the calculations are used to evaluate the future performance of the low-level radioactive waste disposal facility and to provide input for establishment of waste acceptance criteria. In addition, one-factor-at-a-time, Monte Carlo, and rank correlation analyses are included for sensitivity and uncertainty analysis. The comparison of the performance assessment results to the applicable performance objectives provides reasonable expectation that the performance objectives will be met

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Materials Handling Equipment Markets

In 2008, the National Renewable Energy Laboratory (NREL), under contract to the US Department of Energy (DOE), conducted a manufacturing readiness assessment (MRA) of fuel cell systems and fuel cell stacks for back-up power and material handling applications (MHE). To facilitate the MRA, manufacturing readiness levels (MRL) were defined that were based on the Technology Readiness Levels previously established by the US Department of Energy (DOE). NREL assessed the extensive existing hierarchy of MRLs developed by Department of Defense (DoD) and other Federal entities, and developed a MRL scale adapted to the needs of the Fuel Cell Technologies Program (FCTP) and to the status of the fuel cell industry. The MRL ranking of a fuel cell manufacturing facility increases as the manufacturing capability transitions from laboratory prototype development through Low Rate Initial Production to Full Rate Production. DOE can use MRLs to address the economic and institutional risks associated with a ramp-up in polymer electrolyte membrane (PEM) fuel cell production. In 2010, NREL updated this assessment, including additional manufacturers, an assessment of market developments since the original report, and a comparison of MRLs between 2008 and 2010.

08 HYDROGEN↗