Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

UTM and D-NET: NASA and JAXA's Collaborative Research on Integrating Small UAS with Disaster Response Efforts

Natural disasters, such as flooding, wildfire, hurricane, tornadoes, earthquakes and tsunamis, pose challenges in preserving human life and minimizing the damages to a region. During catastrophic events, timely response of disaster relief personnel, an efficient deployment of resources in the recovery effort, and coordinated information sharing amongst different relief agencies can make a substantial difference in responding to those impacted by the disaster. Many relief activities currently utilize both ground personnel and manned airborne assets during different phases of the disaster response. Typically, multiple organizations support relief activities and this often creates logistics coordination challenges between agencies which can result in wasted time or resources. The Japan Aerospace Exploration Agency (JAXA) has been developing an "Integrated aircraft operation system for disaster relief (D-NET)", which assists collection and sharing of disaster information through the integrated operation of aircraft such as helicopters, aircraft, and satellites, for efficient and safe rescue operations by disaster relief aircraft. Due to the advancement in unmanned aircraft systems (UAS) technologies, public safety organizations have started incorporating small UAS (sUAS) as an asset in their disasters response activities. To address the airspace integration challenges of the influx of sUAS in the United States the National Aeronautics and Space Administration (NASA), under the UAS Traffic Management (UTM) project, has been engaged in research to enable large-scale commercial applications of sUAS operating in low altitude airspace. This paper presents the integration of D-NET, which incorporate sUAS in the planning, information sharing, and operation support of disasters response activities, and UTM, which provides airspace management to enable large scale high density operations. The integration of the DNET and UTM systems enables coordination, data sharing, and airspace management to improve the timeliness of the disaster response, enable relief organization to reduce cost and overhead by using UAS assets and still maintain airspace safety during the relief activities.

UTM↗

Liquid Nitrogen Testing of ISRU Liquefaction Methods in Unsteady Applications

To enable NASA’s planned long duration missions, the agency is putting emphasis on reusable cryogenic systems. Such systems will require replenishing of cryogens on-orbit via a cryogenic tanker or refueling depot, and potentially on the lunar or Martian surfaces with the utilization of in-situ resources. Surface replenishing requires the in-situ production of gaseous oxygen (and hydrogen if on the lunar surface), followed by liquefaction and storage. Funded by NASA’s Advanced Exploration Systems, and managed under the Advanced Cis-Lunar Space Capability Project, the Cryogenic Fluid In-Situ Liquefaction for Landers (CryoFILL) multi center team was formed to develop a liquefaction and storage system that is efficient, reliable and scalable. This presentation will demonstrate the liquefaction and storage of “In-Situ like” propellant via a Tube-On-Tank Heat Exchanger integrated with Active Cooling (cryocooler) (verify proof of concept and obtain relevant data for model validation) and gather lessons learned from “brassboard” testing which will be applied to future liquefaction system prototype testing, then eventually to an end-to-end demonstration.

Stephens, J. R.↗

Atmospheric Processing Module for Mars Propellant Production

The multi-NASA center Mars Atmosphere and Regolith COllectorPrOcessor for Lander Operations (MARCO POLO) project was established to build and demonstrate a methaneoxygen propellant production system in a Mars analog environment. Work at the Kennedy Space Center (KSC) Applied Chemistry Laboratory is focused on the Atmospheric Processing Module (APM). The purpose of the APM is to freeze carbon dioxide from a simulated Martian atmosphere containing the minor components nitrogen, argon, carbon monoxide, and water vapor at Martian pressures (8 torr) by using dual cryocoolers with alternating cycles of freezing and sublimation. The resulting pressurized CO(sub 2) is fed to a methanation subsystem where it is catalytically combined with hydrogen in a Sabatier reactor supplied by the Johnson Space Center (JSC) to make methane and water vapor. We first used a simplified once-through setup and later employed a H(sub 2)CO(sub 2) recycling system to improve process efficiency. This presentation and paper will cover (1) the design and selection of major hardware items, such as the cryocoolers, pumps, tanks, chillers, and membrane separators, (2) the determination of the optimal cold head design and flow rates needed to meet the collection requirement of 88 g CO(sub 2) hr for 14 hr, (3) the testing of the CO(sub 2) freezer subsystem, and (4) the integration and testing of the two subsystems to verify the desired production rate of 31.7 g CH(sub 4) hr and 71.3 g H(sub 2)O hr along with verification of their purity. The resulting 2.22 kg of CH(sub 2)O(sub 2) propellant per 14 hr day (including O(sub 2) from electrolysis of water recovered from regolith, which also supplies the H(sub 2) for methanation) is of the scale needed for a Mars Sample Return mission. In addition, the significance of the project to NASAs new Mars exploration plans will be discussed.

waste treatment↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Integrated Intermodal Passenger Transportation System

Modern transportation consists of many unique modes of travel. Each of these modes and their respective industries has evolved independently over time, forming a largely incoherent and inefficient overall transportation system. Travelers today are forced to spend unnecessary time and efforts planning a trip through varying modes of travel each with their own scheduling, pricing, and services; causing many travelers to simply rely on their relatively inefficient and expensive personal automobile. This paper presents a demonstration program system to not only collect and format many different sources of trip planning information, but also combine these independent modes of travel in order to form optimal routes and itineraries of travel. The results of this system show a mean decrease in inter-city travel time of 10 percent and a 25 percent reduction in carbon dioxide emissions over personal automobiles. Additionally, a 55 percent reduction in carbon dioxide emissions is observed for intra-city travel. A conclusion is that current resources are available, if somewhat hidden, to drastically improve point to point transportation in terms of time spent traveling, the cost of travel, and the ecological impact of a trip. Finally, future concepts are considered which could dramatically improve the interoperability and efficiency of the transportation infrastructure.

Klock, Ryan↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Land and Atmosphere Near-Real-Time Capability for Earth Observing System

The past decade has seen a rapid increase in availability and usage of near-real-time data from satellite sensors. The EOSDIS (Earth Observing System Data and Information System) was not originally designed to provide data with sufficiently low latency to satisfy the requirements for near-real-time users. The EOS (Earth Observing System) instruments aboard the Terra, Aqua and Aura satellites make global measurements daily, which are processed into higher-level 'standard' products within 8-40 hours of observation and then made available to users, primarily earth science researchers. However, applications users, operational agencies, and even researchers desire EOS products in near-real-time to support research and applications, including numerical weather and climate prediction and forecasting, monitoring of natural hazards, ecological/invasive species, agriculture, air quality, disaster relief and homeland security. These users often need data much sooner than routine science processing allows, usually within 3 hours, and are willing to trade science product quality for timely access. While Direct Broadcast provides more timely access to data, it does not provide global coverage. In 2002, a joint initiative between NASA (National Aeronautics and Space Administration), NOAA (National Oceanic and Atmospheric Administration), and the DOD (Department of Defense) was undertaken to provide data from EOS instruments in near-real-time. The NRTPE (Near Real Time Processing Effort) provided products within 3 hours of observation on a best-effort basis. As the popularity of these near-real-time products and applications grew, multiple near-real-time systems began to spring up such as the Rapid Response System. In recognizing the dependence of customers on this data and the need for highly reliable and timely data access, NASA's Earth Science Division sponsored the Earth Science Data and Information System Project (ESDIS)-led development of a new near-real-time system called LANCE (Land, Atmosphere Near-Real-Time Capability for EOS) in 2009. LANCE consists of special processing elements, co-located with selected EOSDIS data centers and processing facilities. A primary goal of LANCE is to bring multiple near-real-time systems under one umbrella, offering commonality in data access, quality control, and latency. LANCE now processes and distributes data from the Moderate Resolution Imaging Spectroradiometer (MODIS), Atmospheric Infrared Sounder (AIRS), Advanced Microwave Scanning Radiometer Earth Observing System (AMSR-E), Microwave Limb Sounder (MLS) and Ozone Monitoring Instrument (OMI) instruments within 3 hours of satellite observation. The Rapid Response System and the Fire Information for Resource Management System (FIRMS) capabilities will be incorporated into LANCE in 2011. LANCE maintains a central website to facilitate easy access to data and user services. LANCE products are extensively tested and compared with science products before being made available to users. Each element also plans to implement redundant network, power and server infrastructure to ensure high availability of data and services. Through the user registration system, users are informed of any data outages and when new products or services will be available for access. Building on a significant investment by NASA in developing science algorithms and products, LANCE creates products that have a demonstrated utility for applications requiring near-real-time data. From lower level data products such as calibrated geolocated radiances to higher-level products such as sea ice extent, snow cover, and cloud cover, users have integrated LANCE data into forecast models and decision support systems. The table above shows the current near-real-time product categories by instrument. The ESDIS Project continues to improve the LANCE system and use the experience gained through practice to seek adjustments to improve the quality and performance of the system. For example, anGC-compliant Web Map Service (WMS) will be added shortly that will allow users to download geo-referenced MODIS images for arbitrary bounding boxes. Further, an OGC-compliant Web Coverage Service (WCS) will be added later this year that will expedite user access to arbitrary data subsets or re-formatted products. AIRS images are now served through WMS and available in multiple formats (PNG, GeoTIFF, KMZ). NASA has established a LANCE User Working Group to steer the development of the system and create a forum for sharing ideas and experiences that are expected to further improve the LANCE capabilities. The LANCE system has proved a success by satisfying the growing needs of the applications and operational communities for land and atmosphere data in near-real-time. NASA's Earth Sciences Division was able to leverage existing science research capabilities to provide the near-real-time community with products and imagery that support monitoring of disasters in a timely manner.

Murphy, Kevin J.↗

Overview of the Life Sciences Glovebox (LSG) Facility

The Life Sciences Glovebox (LSG) is a rack-level payload facility designed to house biological investigations in a "workbench" type environment aboard the International Space Station (ISS). The facility is scheduled to be launched in September 2018 and will be installed in the Japanese Experiment Module (JEM) of the ISS. LSG is comprised of an extendable work volume, an airlock, an avionics package, a laptop, and supporting structure. The 450L work volume provides two levels of containment for investigations via the physical barrier of its structure and an internal, filtered airflow that results in a negative pressure relative to ISS cabin pressure. The facility provides many other resources for investigation use including 28 VDC power, 120 VAC power, heat rejection, data connections, and video. Portions of the interior surfaces of the work volume are ferrous, allowing investigations and supporting hardware to be magnetically affixed to these surfaces. A UV decontamination system and a variety of ancillary hardware are available for investigations to use while occupying LSG. An engineering unit on the ground is used for payload development and integrated verification testing. Once the facility is installed and commissioned, it will be managed by the same team that manages the Microgravity Science Glovebox (MSG), another rack-level payload facility that has been operating aboard the ISS since 2002. Experienced Investigation Payload Integration Managers (IPIMs), who also support MSG payloads, will be available to assist payload developers through the integration process. This presentation will provide an overview of the LSG facility and the planned investigation flow for the near future.

Jordan, Lee↗

Transitioning Autonomous Systems Technology Research to a Flight Software Environment

NASA has developed methods and algorithms for autonomous spacecraft operations,including automated planning and scheduling, fault diagnostics and impact determination,procedure management and display. Making the transition from technology research tooperational flight software requires overcoming significant technical, programmatic andcultural challenges. Technology research is aimed at developing methods that performspecific functions correctly, but the resulting software may not be designed for flightprocessors with limited CPU, memory and network resources, and may not be easilyintegrated into spacecraft flight software. Our objective in the Autonomous Systems andOperations Project is to make significant strides toward the transformation from technologyto operational use. Our focus was twofold: maturing research grade autonomy software intoa flight software environment using broadly accepted languages and tools; and integratingautonomy applications with each other and with representative systems and their data andcommand interfaces. For a target flight software environment, we chose Core FlightSoftware, developed by Goddard Space Flight Center as a common operating systemindependent framework. Our hardware integration environment was provided by theIntegrated Power and Avionics Systems (iPAS) Lab at Johnson Space Center, in whichvarious subsystem development has been conducted to address engineering challenges forthe vehicles and systems required for long-duration missions into the solar system. The iPASand its network of connected facilities provides realistic subsystem hardware or simulationsof spacecraft power, life support, guidance, navigation and control, and command and datahandling subsystems. Interfaces between autonomy applications and the subsystems beingassessed and controlled were developed, assessed and refined. The hardware and softwareenvironment using CFS and the iPAS facility has proven to be a highly flexible and realisticenvironment in which to rapidly integrate applications in an iterative, low cost setting. Usingthe integration environment we have developed, we will turn our focus to performance andsizing analysis to determine the computational requirements for full-scale deployment ofautonomy technology. Scalability of reasoners and the spacecraft models upon which theyoperate, and robustness across the full range of spacecraft conditions and environments willbe explored and improved. We are making significant contributions to the future programsthat will build the spacecraft that will take humans beyond the Earth-Moon system, in whichprogram Systems Engineers will be able to accurately and confidently design in accurate,robust and mature autonomous operations systems.

Flight Software↗

Atmospheric Processing Module for Mars Propellant Production

The multi-NASA center Mars Atmosphere and Regolith COllector/PrOcessor for Lander Operations (MARCO POLO) project was established to build and demonstrate a methaneoxygen propellant production system in a Mars analog environment. Work at the Kennedy Space Center (KSC) Applied Chemistry Laboratory is focused on the Atmospheric Processing Module (APM). The purpose of the APM is to freeze carbon dioxide from a simulated Martian atmosphere containing the minor components nitrogen, argon, carbon monoxide, and water vapor at Martian pressures (approx. 8 torr) by using dual cryocoolers with alternating cycles of freezing and sublimation. The resulting pressurized CO(sub 2) is fed to a methanation subsystem where it is catalytically combined with hydrogen in a Sabatier reactor supplied by the Johnson Space Center (JSC) to make methane and water vapor. We first used a simplified once-through setup and later employed a H(sub 2)CO(sub 2) recycling system to improve process efficiency. This presentation and paper will cover (1) the design and selection of major hardware items, such as the cryocoolers, pumps, tanks, chillers, and membrane separators, (2) the determination of the optimal cold head design and flow rates needed to meet the collection requirement of 88 g CO(sub 2) hr for 14 hr, (3) the testing of the CO(sub 2) freezer subsystem, and (4) the integration and testing of the two subsystems to verify the desired production rate of 31.7 g CH(sub 4) hr and 71.3 g H(sub 2)O hr along with verification of their purity. The resulting 2.22 kg of CH(sub 2)O(sub 2) propellant per 14 hr day (including O(sub 2) from electrolysis of water recovered from regolith, which also supplies the H(sub 2) for methanation) is of the scale needed for a Mars Sample Return mission. In addition, the significance of the project to NASAs new Mars exploration plans will be discussed.

hydrocarbon fuel production↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Mission Benefits Analysis of Logistics Reduction Technologies

Future space exploration missions will need to use less logistical supplies if humans are to live for longer periods away from our home planet. Anything that can be done to reduce initial mass and volume of supplies or reuse or recycle items that have been launched will be very valuable. Reuse and recycling also reduce the trash burden and associated nuisances, such as smell, but require good systems engineering and operations integration to reap the greatest benefits. A systems analysis was conducted to quantify the mass and volume savings of four different technologies currently under development by NASA fs Advanced Exploration Systems (AES) Logistics Reduction and Repurposing project. Advanced clothing systems lead to savings by direct mass reduction and increased wear duration. Reuse of logistical items, such as packaging, for a second purpose allows fewer items to be launched. A device known as a heat melt compactor drastically reduces the volume of trash, recovers water and produces a stable tile that can be used instead of launching additional radiation protection. The fourth technology, called trash ]to ]supply ]gas, can benefit a mission by supplying fuel such as methane to the propulsion system. This systems engineering work will help improve logistics planning and overall mission architectures by determining the most effective use, and reuse, of all resources.

Ewert, Michael K.↗

Mission Benefits Analysis of Logistics Reduction Technologies

Future space exploration missions will need to use less logistical supplies if humans are to live for longer periods away from our home planet. Anything that can be done to reduce initial mass and volume of supplies or reuse or recycle items that have been launched will be very valuable. Reuse and recycling also reduce the trash burden and associated nuisances, such as smell, but require good systems engineering and operations integration to reap the greatest benefits. A systems analysis was conducted to quantify the mass and volume savings of four different technologies currently under development by NASA s Advanced Exploration Systems (AES) Logistics Reduction and Repurposing project. Advanced clothing systems lead to savings by direct mass reduction and increased wear duration. Reuse of logistical items, such as packaging, for a second purpose allows fewer items to be launched. A device known as a heat melt compactor drastically reduces the volume of trash, recovers water and produces a stable tile that can be used instead of launching additional radiation protection. The fourth technology, called trash-to-gas, can benefit a mission by supplying fuel such as methane to the propulsion system. This systems engineering work will help improve logistics planning and overall mission architectures by determining the most effective use, and reuse, of all resources.

Ewert, Michael K.↗

Space Radiation Risk Assessment for Future Lunar Missions

For lunar exploration mission design, radiation risk assessments require the understanding of future space radiation environments in support of resource management decisions, operational planning, and a go/no-go decision. The future GCR flux was estimated as a function of interplanetary deceleration potential, which was coupled with the estimated neutron monitor rate from the Climax monitor using a statistical model. A probability distribution function for solar particle event (SPE) occurrence was formed from proton fluence measurements of SPEs occurred during the past 5 solar cycles (19-23). Large proton SPEs identified from impulsive nitrate enhancements in polar ice for which the fluences are greater than 2 10(exp 9) protons/sq cm for energies greater than 30 MeV, were also combined to extend the probability calculation for high level of proton fluences. The probability with which any given proton fluence level of a SPE will be exceeded during a space mission of defined duration was then calculated. Analytic energy spectra of SPEs at different ranks of the integral fluences were constructed over broad energy ranges extending out to GeV, and representative exposure levels were analyzed at those fluences. For the development of an integrated strategy for radiation protection on lunar exploration missions, effective doses at various points inside a spacecraft were calculated with detailed geometry models representing proposed transfer vehicle and habitat concepts. Preliminary radiation risk assessments from SPE and GCR were compared for various configuration concepts of radiation shelter in exploratory-class spacecrafts.

Kim, Myung-Hee Y.↗

An Offload NIC for NASA, NLR, and Grid Computing

This work addresses distributed data management and access dynamically configurable high-speed access to data distributed and shared over wide-area high-speed network environments. An offload engine NIC (network interface card) is proposed that scales at nX10-Gbps increments through 100-Gbps full duplex. The Globus de facto standard was used in projects requiring secure, robust, high-speed bulk data transport. Novel extension mechanisms were derived that will combine these technologies for use by GridFTP, bandwidth management resources, and host CPU (central processing unit) acceleration. The result will be wire-rate encrypted Globus grid data transactions through offload for splintering, encryption, and compression. As the need for greater network bandwidth increases, there is an inherent need for faster CPUs. The best way to accelerate CPUs is through a network acceleration engine. Grid computing data transfers for the Globus tool set did not have wire-rate encryption or compression. Existing technology cannot keep pace with the greater bandwidths of backplane and network connections. Present offload engines with ports to Ethernet are 32 to 40 Gbps f-d at best. The best of ultra-high-speed offload engines use expensive ASICs (application specific integrated circuits) or NPUs (network processing units). The present state of the art also includes bonding and the use of multiple NICs that are also in the planning stages for future portability to ASICs and software to accommodate data rates at 100 Gbps. The remaining industry solutions are for carrier-grade equipment manufacturers, with costly line cards having multiples of 10-Gbps ports, or 100-Gbps ports such as CFP modules that interface to costly ASICs and related circuitry. All of the existing solutions vary in configuration based on requirements of the host, motherboard, or carriergrade equipment. The purpose of the innovation is to eliminate data bottlenecks within cluster, grid, and cloud computing systems, and to add several more capabilities while reducing space consumption and cost. Provisions were designed for interoperability with systems used in the NASA HEC (High-End Computing) program. The new acceleration engine consists of state-ofthe- art FPGA (field-programmable gate array) core IP, C, and Verilog code; novel communication protocol; and extensions to the Globus structure. The engine provides the functions of network acceleration, encryption, compression, packet-ordering, and security added to Globus grid or for cloud data transfer. This system is scalable in nX10-Gbps increments through 100-Gbps f-d. It can be interfaced to industry-standard system-side or network-side devices or core IP in increments of 10 GigE, scaling to provide IEEE 40/100 GigE compliance.

Awrach, James↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗

Humanoids for lunar and planetary surface operations

This paper presents a vision of humanoid robots as human's key partners in future space exploration, in particular for construction, maintenance/repair and operation of lunar/planetary habitats, bases and settlements. It integrates this vision with the recent plans, for human and robotic exploration, aligning a set of milestones for operational capability of humanoids with the schedule for the next decades and development spirals in the Project Constellation. These milestones relate to a set of incremental challenges, for the solving of which new humanoid technologies are needed. A system of systems integrative approach that would lead to readiness of cooperating humanoid crews is sketched. Robot fostering, training/education techniques, and improved cognitive/sensory/motor development techniques are considered essential elements for achieving intelligent humanoids. A pilot project in this direction is outlined.

information fusion↗