Search NASA⌕ Search

SEARCH · Search NASA

Results for “JPL projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Hubble Space Telescope Briefing: HST Science Overview

This NASA Kennedy Space Center video release presents a broad overview of the science that is now possible as a result of the servicing of the Hubble Space Telescope (HST). Dr. Ed Weiler (HST Program Scientist, NASA Headquarters), Dr. Dave Leckrone (HST, Senior Project Scientist, Goddard Space Flight Center (GSFC)), Dr. John Trauger (Wide Field Planetary Camera 2 (WFPC2) Principal Investigator, Jet Propulsion Lab. (JPL)), Dr. Chris Burrows (WFPC2 Co-Investigator, Space Telescope Science Inst.(STSci)-European Space Agency (ESA), Jim Crocker ((Corrective Optics Space Telescope Axial Replacement) COSTAR Team Leader, STSci), Dr. Holland Ford (COSTAR Project Scientist, Johns Hopkins Univ., STSci), and Dr. Duccio Machetto (European Space Agency (ESA)) give brief presentations, which feature images of stars and galaxies taken from the ground, from WFPC1 (prior to the servicing mission), and from WFPC2 (after the servicing mission). The main theme of the discussions center around the spherical aberration that was found in the images prior to servicing and the corrected images seen without the aberration following servicing. A question and answer period rounds out the press conference, with questions posed from scientific journalists at GSFC and other NASA centers.

Source record↗

Flat-plate solar array progress and plans

The Flat-Plate Solar Array Project (FSA), sponsored by the U.S. Department of Energy (DOE) and managed by the Jet Propulsion Laboratory (JPL), has achieved progress in a broad range of technical activities since that reported at the Fourth European Communities Conference. A particularly important analysis has been completed recently which confirms the adoption into practice by the U.S. Photovoltaic (PV Industry, of all the low-cost module technology elements proposed at the 16th Project Integration Meeting for a $2.80/Wp (1980 U.S. Dollars) design approach in the fall of 1980. This work presents along with a projection, using the same techniques, for what is believed to be a very credible ribbon-based module design for less that $0.55/Wp (1980 U.S. Dollars). Other areas to be reported upon include low-cost Si feedstock refinement; ribbon growth; process sequence development for cells; environmental isolation; engineering science investigations; and module testing progress.

Callaghan, W. T.↗

Map characteristics of Landsat mosaics

Map characteristics of the Landsat mosaics developed at JPL are considered. Procedures for digital mosaicking of Landsat frames to standard map projections were used to mosaic at full resolution ten scenes over the California desert region and twenty-one scenes over Arizona. The procedures are analyzed for horizontal positioning error (global and local) and the potential for classification error associated with the adjustment of brightness of Z values between frames; the use of this technology for the mapping of extensive features is discussed. Mosaicking facilities, techniques, mapping accuracy, and thematic mapping characteristics are described. A comparative analysis of Landsat mosaicking technology developed at Goddard Space Flight Center, IBM Gaithersburg, and USGS Flagstaff is made, and suggestions are given for algorithm development to improve systems capacity and ability to handle a variety of cases.

Zobrist, A. L.↗

Design issues for Mars planetary rovers

The paper presents some of the design issues and vehicle requirements that need to be addressed for the Mars planetary rovers. Some of the designs currently being investigated, including the JPL rover, the Martin Marietta vehicle, and the French Space Agency's VAP project, are examined. The rover must satisfy such mission requirements as surveying the terrain, preparing the landing sites, loading and unloading components for base operations, and aiding in the recovery of in situ materials.

Lee, Gordon K. F.↗

An operations and command systems for the extreme ultraviolet explorer

About 40% of the budget of a scientific spacecraft mission is usually consumed by Mission Operations & Data Analysis (MO&DA) with MO driving these costs. In the current practice, MO is separated from spacecraft design and comes in focus relatively late in the mission life cycle. As a result, spacecraft may be designed that are very difficult to operate. NASA centers have extensive MO expertise but often lessons learned in one mission are not exploited for other parallel or future missions. A significant reduction of MO costs is essential to ensure a continuing and growing access to space for the scientific community. We are addressing some of these issues with a highly automated payload operations and command system for an existing mission, the Extreme Ultraviolet Explorer (EUVE). EUVE is currently operated jointly by the Goddard Space Flight Center (GSFC), responsible for spacecraft operations, and the Center for Extreme Ultraviolet Astrophysics (CEA) of the University of California, Berkeley, which controls the telescopes and scientific instruments aboard the satellite. The new automated system is being developed by a team including personnel from the NASA Ames Research Center (ARC), the Jet Propulsion Laboratory (JPL) and the Center for EUV Astrophysics (CEA). An important goal of the project is to provide AI-based technology that can be easily operated by nonspecialists in AI. Another important goal is the reusability of the techniques for other missions. Models of the EUVE spacecraft need to be built both for planning/scheduling and for monitoring. In both cases, our modeling tools allow the assembly of a spacecraft model from separate sub-models of the various spacecraft subsystems. These sub-models are reusable; therefore, building mission operations systems for another small satellite mission will require choosing pre-existing modules, reparametrizing them with respect to the actual satellite telemetry information, and reassembling them in a new model. We briefly describe the EUVE mission and indicate why it is particularly suitable for the task. Then we briefly outline our current work in mission planning/scheduling and spacecraft and instrument health monitoring.

Muscettola, Nicola↗

Engineering Memos

I first came to the Jet Propulsion Laboratory (JPL) 48 years ago, and was taught that what's most important for project success is bringing good people on board, getting them to come together as a team, making certain that they're all on the same page, and setting up the mechanisms to keep them communicating. That much is true to all successful projects - but, naturally, it is not as simple as it sounds.

Casani, John↗

Lunar Water Resource Demonstration

In cooperation with the Canadian Space Agency, the Northern Centre for Advanced Technology, Inc., the Carnegie-Mellon University, JPL, and NEPTEC, NASA has undertaken the In-Situ Resource Utilization (ISRU) project called RESOLVE. This project is a ground demonstration of a system that would be sent to explore permanently shadowed polar lunar craters, drill into the regolith, determine what volatiles are present, and quantify them in addition to recovering oxygen by hydrogen reduction. The Lunar Prospector has determined these craters contain enhanced hydrogen concentrations averaging about 0.1%. If the hydrogen is in the form of water, the water concentration would be around 1%, which would translate into billions of tons of water on the Moon, a tremendous resource. The Lunar Water Resource Demonstration (LWRD) is a part of RESOLVE designed to capture lunar water and hydrogen and quantify them as a backup to gas chromatography analysis. This presentation will briefly review the design of LWRD and some of the results of testing the subsystem. RESOLVE is to be integrated with the Scarab rover from CMIJ and the whole system demonstrated on Mauna Kea on Hawaii in November 2008. The implications of lunar water for Mars exploration are two-fold: 1) RESOLVE and LWRD could be used in a similar fashion on Mars to locate and quantify water resources, and 2) electrolysis of lunar water could provide large amounts of liquid oxygen in LEO, leading to lower costs for travel to Mars, in addition to being very useful at lunar outposts.

Muscatello, Anthony C.↗

2012 Robotics Activities at JPL

The Robotics Section of the Jet Propulsion Laboratory (JPL), California Institute of Technology, is engaged in a full spectrum of flight project and research activities. This paper will provide an overview of these efforts, and discuss the recent accomplishments and future directions of them. Specific activities will be high- lighted based on their level of accomplishment, impact on the community, maturity, or novelty. Robotics activities on flight projects are a significant subset of the full effort for these large missions. Complementing flight activities is a diverse set of research efforts for NASA and other U.S. Government agencies. Future directions will be motivated by NASA and other sponsor objectives, as well as success experienced in these current endeavours.

planetary exploration↗

Magnetic Testing, and Modeling, Simulation and Analysis for Space Applications

The Aerospace Corporation (Aerospace) and Lockheed Martin Space Systems (LMSS) participated with Jet Propulsion Laboratory (JPL) in the implementation of a magnetic cleanliness program of the NASA/JPL JUNO mission. The magnetic cleanliness program was applied from early flight system development up through system level environmental testing. The JUNO magnetic cleanliness program required setting-up a specialized magnetic test facility at Lockheed Martin Space Systems for testing the flight system and a testing program with facility for testing system parts and subsystems at JPL. The magnetic modeling, simulation and analysis capability was set up and performed by Aerospace to provide qualitative and quantitative magnetic assessments of the magnetic parts, components, and subsystems prior to or in lieu of magnetic tests. Because of the sensitive nature of the fields and particles scientific measurements being conducted by the JUNO space mission to Jupiter, the imposition of stringent magnetic control specifications required a magnetic control program to ensure that the spacecraft's science magnetometers and plasma wave search coil were not magnetically contaminated by flight system magnetic interferences. With Aerospace's magnetic modeling, simulation and analysis and JPL's system modeling and testing approach, and LMSS's test support, the project achieved a cost effective approach to achieving a magnetically clean spacecraft. This paper presents lessons learned from the JUNO magnetic testing approach and Aerospace's modeling, simulation and analysis activities used to solve problems such as remnant magnetization, performance of hard and soft magnetic materials within the targeted space system in applied external magnetic fields.

magnetics↗

Using Virtual Reality for Science Mission Planning: A Mars Pathfinder Case

The Mars Pathfinder Project GDS Team has designed software that integrates virtual reality technology with existing JPL Navigational Ancillary Information Facilities (NAIF) and image processing capabilities. The result is an interactive, workstation-based application software that provides a high resolution 3-dimensional stereo display of Mars as if it were viewed through the lander camera. This paper describes the architecture and characteristics of this science mission planning software and discusses possible uses of this software by other planetary missions.

virtual↗

Operations Concept for Responding to Urgent Requests for NASA-ISRO Synthetic Aperture Radar (NISAR)

The NASA-ISRO Synthetic Aperture Radar, or NISAR, mission is an Earth-mapping radar observatory to be launched from Sriharikota (India) in 2022. This mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organization (ISRO). This spacecraft will carry two instruments that will operate at radar wavelengths (L and Sband) and will provide data for understanding changes in the Earth’s land surface. The scientific data from this mission will revolutionize our understanding of the causes and consequences of land surface changes on Earth, ranging from Solid Earth Deformation in the form of natural hazards like earthquakes, volcanic eruptions and landslides, to ecosystem disturbances, to changes in the cryosphere (measurements of polar ice caps, ice sheets and sea ice). A nominal Reference Observation Plan, that repeats roughly every 12-24 days, developed prior to launch by the NISAR Mission Planning team, in consultation with the Science Team, will form the basis of science data collection by the payload instruments onboard the NISAR observatory after launch. Scheduling of science observations for the mission requires accounting for limited spacecraft resources like onboard data storage, downlink capacity, energy/power, thermal limits and instrument duty cycles. In addition to nominal science data collection, the project has a Level 1 requirement to respond to requests for urgent data acquisition over disaster sites (natural or anthropogenic) by scheduling new acquisitions within 24 hrs of notification and delivering science data within 5 hours of data acquisition. This capability is to be exercised on a ‘best-efforts basis’. While the definition of what constitutes an ‘urgent request’, and how such requests would be submitted to the project, is within the domain of the Science Team, the Mission System team is responsible for developing the baseline operations concept and implementation approach for responding to such requests. Given the ‘best-efforts’ nature of this requirement, a few highlevel guidelines have been developed to help guide the formulation of the operations concept, and are presented in this paper. Requests for urgent response data will be accommodated following the guiding principle of minimal to no impact on nominal science and planned engineering activities. No change in satellite orbit or attitude will be made for urgent response. Restricting response approaches to only changing the downlink and/or ground processing priority for existing observations, and adding new observations only in areas where NISAR will not be nominally imaging, allows for minimal impact on the Reference science Observation Plan. No instrument mode changes will be allowed for urgent response (except for high-priority requests), and no new observations that impact either planned science or engineering activities will be scheduled. Additionally, data requests must fit within the available project resource margins (both spacecraft and ground resources are to be evaluated). Both JPL and ISRO will be involved at various steps of the implementation, irrespective of whether the urgent request is for L-SAR (NASA instrument) or S-SAR (ISRO instrument) or a joint dataset.

Sharma, Priyanka↗

Early Results from NASA’s Laser Communications Relay Demonstration (LCRD) Experiment Program

NASA’s Laser Communications Relay Demonstration (LCRD) mission began its two-year Experiment Program in June of 2022. This experimental phase includes long-term measurement of the effects of the atmosphere (turbulence, weather) on the performance and availability of lasercom. In addition, various future operational scenarios including robotic and exploration missions, and various network service configurations are being emulated. In addition to experiments and demonstrations proposed by the LCRD Investigator Team, NASA enables individuals and groups from government agencies, academia, and industry to propose experiments under the LCRD Guest Experimenters Program. This conference paper provides highlights of the early LCRD experiments and a preview of the remaining experiments, including relaying data to and from the Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an on-board electronic switch, and can relay information between two optical ground stations located in California and Hawaii. LCRD is a joint project between NASA’s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

lasercom↗

Early Results from NASA’s Laser Communications Relay Demonstration (LCRD) Experiment Program

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) mission began its two-year Experiment Program in June 2022. This experimental phase includes long-term measurement of the effects of the atmosphere (turbulence, weather) on the performance and availability of lasercom. Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations are being emulated. In addition to experiments and demonstrations proposed by the LCRD Investigator Team, NASA enables individuals and groups from government agencies, academia, and industry to propose experiments under the LCRD Guest Experimenters Program. This conference paper provides highlights of the early LCRD experiments and a preview of the future experiments, including relaying data to and from the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch, and can relay information between two optical ground stations located in California and Hawaii. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the NASA Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

lasercom↗

Early Results from NASA’s Laser Communications Relay Demonstration (LCRD) Experiment Program

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) mission began its two-year Experiment Program in June 2022. This experimental phase includes long-term measurement of the effects of the atmosphere (turbulence, weather) on the performance and availability of lasercom. Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations are being emulated. In addition to experiments and demonstrations proposed by the LCRD Investigator Team, NASA enables individuals and groups from government agencies, academia, and industry to propose experiments under the LCRD Guest Experimenters Program. This conference paper provides highlights of the early LCRD experiments and a preview of the future experiments, including relaying data to and from the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch, and can relay information between two optical ground stations located in California and Hawaii. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the NASA Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

lasercom↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

A model to assess the Mars Telecommunications Network relay robustness

The relatively long mission durations and compatible radio protocols of current and projected Mars orbiters have enabled the gradual development of a heterogeneous constellation providing proximity communication services for surface assets. The current and forecasted capability of this evolving network has reached the point that designers of future surface missions consider complete dependence on it. Such designers, along with those architecting network requirements, have a need to understand the robustness of projected communication service. A model has been created to identify the robustness of the Mars Network as a function of surface location and time. Due to the decade-plus time horizon considered, the network will evolve, with emerging productive nodes and nodes that cease or fail to contribute. The model is a flexible framework to holistically process node information into measures of capability robustness that can be visualized for maximum understanding. Outputs from JPL's Telecom Orbit Analysis Simulation Tool (TOAST) provide global telecom performance parameters for current and projected orbiters. Probabilistic estimates of orbiter fuel life are derived from orbit keeping burn rates, forecasted maneuver tasking, and anomaly resolution budgets. Orbiter reliability is estimated probabilistically. A flexible scheduling framework accommodates the projected mission queue as well as potential alterations.

Mars Telecommunications Orbiter (MTO)↗