Search NASA⌕ Search

SEARCH · Search NASA

Results for “LANDING MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Apollo 13 Mission Report

The Apollo 13 mission, planned as a lunar landing in the Fra Mauro area, was aborted because of an abrupt loss of service module cryogenic oxygen associated with a fire in one of the two tanks at approximately 56 hours. The lunar module provided the necessary support to sustain a minimum operational condition for a safe return to earth. A circumlunar profile was executed as the most efficient means of earth return, with the lunar module providing power and life support until transfer to the command module just prior to entry. Although the mission was unsuccessful as planned, a lunar flyby and several scientific experiments were completed.

Source record↗

Summary of scientific results

The major scientific results of the Apollo 15 flight are summarized. The objectives of the flight are given as: (1) to carry out extensive geological exploration, comprehensive sampling, and photographic documentation of the Apennine Front at Hadley Delta, Hadley Rille, and the mare plain, (2) to emplace the ALSEP near the landing site, and (3) to perform a series of survey experiments with the scientific instrument module (SIM) equipment from lunar orbit and during transearth coast.

Allen, J. P.↗

Apollo experience report: Evolution of the rendezvous-maneuver plan for the lunar-landing missions

The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant development for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included. Emphasis is placed on the technical developments from the early 1960's through the Apollo 15 mission (July to August 1971), but pertinent organizational factors also are discussed briefly. Recommendations for rendezvous planning for future programs relative to Apollo experience also are included.

Alexander, J. D.↗

An investigation of errors and data processing techniques for an RF multilateration system

The development of an RF Multilateration system to provide accurate position and velocity measurements during the approach and landing phase of Vertical Takeoff Aircraft operation is discussed. The system uses an angle-modulated ranging signal to provide both range and range rate measurements between an aircraft transponder and multiple ground stations. Range and range rate measurements are converted to coordinate measurements and the coordinate and coordinate rate information is transmitted by an integral data link to the aircraft. Data processing techniques are analyzed to show advantages and disadvantages. Error analyses are provided to permit a comparison of the various techniques.

Britt, C. L., Jr.↗

Advanced Transport Operating System (ATOPS) Flight Management/Flight Controls (FM/FC) software description

The flight software developed for the Flight Management/Flight Controls (FM/FC) MicroVAX computer used on the Transport Systems Research Vehicle for Advanced Transport Operating Systems (ATOPS) research is described. The FM/FC software computes navigation position estimates, guidance commands, and those commands issued to the control surfaces to direct the aircraft in flight. Various modes of flight are provided for, ranging from computer assisted manual modes to fully automatic modes including automatic landing. A high-level system overview as well as a description of each software module comprising the system is provided. Digital systems diagrams are included for each major flight control component and selected flight management functions.

Wolverton, David A.↗

STS-77 Post Flight Presentation

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor. The crew than answers questions from the press.

Source record↗

STS-77 Mission Highlights Resource Tape

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor.

Source record↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

In Orbit Performance of Si Avalanche Photodiode Single Photon Counting Modules in the Geoscience Laser Altimeter System on ICESat

Si avalanche photodiode (APD) single photon counting modules (SPCMs) are used in the Geoscience Laser Altimeter System (GLAS) on Ice, Cloud, anti land Elevation Satellite (ICESat), currently in orbit measuring Earth surface elevation and atmosphere backscattering. These SPCMs are used to measure cloud and aerosol backscatterings to the GLAS laser light at 532-nm wavelength with 60-70% quantum efficiencies and up to 15 millions/s maximum count rates. The performance of the SPCMs has been closely monitored since ICESat launch on January 12, 2003. There has been no measurable change in the quantum efficiency, as indicated by the average photon count rates in response to the background light from the sunlit earth. The linearity and the afterpulsing seen from the cloud and surface backscatterings profiles have been the same as those during ground testing. The detector dark count rates monitored while the spacecraft was in the dark side of the globe have increased almost linearly at about 60 counts/s per day due to space radiation damage. The radiation damage appeared to be independent of the device temperature and power states. There was also an abrupt increase in radiation damage during the solar storm in 28-30 October 2003. The observed radiation damage is a factor of two to three lower than the expected and sufficiently low to provide useful atmosphere backscattering measurements through the end of the ICESat mission. To date, these SPCMs have been in orbit for more than three years. The accumulated operating time to date has reached 290 days (7000 hours). These SPCMs have provided unprecedented receiver sensitivity and dynamic range in ICESat atmosphere backscattering measurements.

Sun, X.↗

From Safer Space Travel to Improved Fisheries Monitoring: Wave Energy Modeling Tool Helps Design Tomorrow's Tech

What does wave energy have to do with space exploration? It turns out, plenty. The National Aeronautics and Space Administration (NASA) is working toward launching the Artemis I mission, an uncrewed lunar test flight, in 2021. It will be the maiden flight of the Space Launch System heavy-lift launch vehicle, as well as the Orion crew module (CM). Orion will orbit the moon for multiple days before returning to Earth and landing in the Pacific Ocean.

Tannen S Vanzwieten↗

Contributions of irrigation modeling, soil moisture and snow data assimilation to high-resolution water budget estimates over the Po basin: progress towards digital replicas

High-resolution water budget estimates benefit from modeling of human water management and satellite data assimilation (DA) in river basins with a large human footprint. Utilizing the Noah-MP land surface model with dynamic vegetation growth and river routing, in combination with an irrigation module, Sentinel-1 backscatter and snow depth retrievals, we produce a set of 0.7-km2 water budget estimates of the Po river basin (Italy) for 2015–2023. The results demonstrate that irrigation modeling improves the seasonal soil moisture variation and summer streamflow at all gauges in the valley after withdrawal of irrigation water from the streamflow in postprocessing (12% error reduction relative to observed low summer streamflow), even if the basin-wide irrigation amount is underestimated. Sentinel-1 backscatter DA for soil moisture updating strongly interacts with irrigation modeling: when both are activated, the soil moisture updates are limited, and the simulated irrigation amounts are reduced. Backscatter DA systematically reduces soil moisture in the spring, which improves downstream spring streamflow. Assimilating Sentinel-1 snow depth retrievals over the surrounding Alps and Apennines further improves spring streamflow in a complementary way (2% error reduction relative to observed high spring streamflow). Despite the seasonal improvements, irrigation modeling and Sentinel-1 backscatter DA cannot significantly improve short-term or interannual variations in soil moisture, irrigation modeling causes a systematically prolonged high vegetation productivity, and snow depth DA only impacts the deep snowpacks. This study helps advancing the design of digital water budget replicas for river basins.

Gabrielle J M De Lannoy↗

Sleuthing the MSL EDL Performance from an X Band Carrier Perspective

During the Entry, Descent, and Landing (EDL) of NASA's Mars Science Laboratory (MSL), or Curiosity, rover to Gale Crater on Mars on August 6, 2012 UTC, the rover transmitted an X-band signal composed of carrier and tone frequencies and a UHF signal modulated with an 8kbps data stream. During EDL, the spacecraft's orientation is determined by its guidance and mechanical subsystems to ensure that the vehicle land safely at its destination. Although orientation to maximize telecom performance is not possible, antennas are especially designed and mounted to provide the best possible line of sight to Earth and to the Mars orbiters supporting MSL's landing. The tones and data transmitted over these links are selected carefully to reflect the most essential parameters of the vehicle's state and the performance of the EDL subsystems for post-EDL reconstruction should no further data transmission from the vehicle be possible. This paper addresses the configuration of the X band receive system used at NASA / JPL's Deep Space Network (DSN) to capture the signal spectrum of MSL's X band carrier and tone signal, examines the MSL vehicle state information obtained from the X band carrier signal only and contrasts the Doppler-derived information against the post-EDL known vehicle state. The paper begins with a description of the MSL EDL sequence of events and discusses the impact of the EDL maneuvers such as guided entry, parachute deploy, and powered descent on the frequency observables expected at the DSN. The range of Doppler dynamics possible is derived from extensive 6 Degrees-Of-Freedom (6 DOF) vehicle state calculations performed by MSL's EDL simulation team. The configuration of the DSN's receive system, using the Radio Science Receivers (RSR) to perform open-loop recording for both for nominal and off-nominal EDL scenarios, is detailed. Expected signal carrier power-to-noise levels during EDL are shown and their impact on signal detection is considered. Particular attention is given to the selection of the appropriate RSR processing bandwidths and to its configuration for real-time signal detection. The X-band carrier frequency obtained through post-processing of the open-loop recorded spectrum is given. Detection of spacecraft status and completion of key vehicle events through their Doppler signature is discussed and illustrated. This Doppler-derived information is compared against the very accurate vehicle data obtained post-EDL via MSL's UHF radio subsystem. The paper concludes with a discussion on the advantages and disadvantages of transmitting the X-band carrier and tone signal in the general context of EDL communications and lessons learned for future missions with EDL sequences are given

Mars Science Laboratory (MSL)↗

Flight experiments using the front-side control technique during piloted approach and landing in a powered lift STOL aircraft

The essential features of using pitch attitude for glidepath control in conjunction with longitudinal thrust modulation for speed control are described, using a simple linearized model for a powered-lift STOL aircraft operating on the backside of the drag curve and at a fixed setting of propulsive lift. It is shown that an automatic speed-hold system incorporating heave-damping augmentation can allow use of the front-side control technique with satisfactory handling qualities, and the results of previous flight investigations are reviewed. Manual control considerations, as they might be involved following failure of the automatic system, are emphasized. The influence of alternative cockpit controller configurations and flight-director display features were assessed for their effect on the control task, which consisted of a straight-in steep approach flown at constant speed in simulated instrument conditions.

Hindson, W. S.↗

DSP-based non-coherent dual detector demodulator for land mobile radio channels

This paper outlines the development of a digital demodulator suitable for the non-coherent detection of various modulation formats including: Phase Shift Keying (PSK), Continuous Phase Frequency Shift Keying (CPFSK) and Frequency Modulation (FM). The demodulator design concept has been derived with a view towards a single integrated circuit (IC) implementation. Two detectors, one non-coherent and one differentially coherent, operate concurrently, providing data detection and automatic frequency control (AFC). Bit error rate results are provided which illustrate the receiver performance in white Gaussian noise.

Saulnier, Gary J.↗

STS-41 Ulysses Launch (10/06/90), Ulysses Deploy (10/06/90), Landing (10/10/90)

Live footage shows the crewmembers of STS-41, Commander Richard N. Richards, Pilot Robert D. Cabana, Mission Specialists William M. Shepherd, Bruce E. Melnick, and Thomas D. Akers, participating in the traditional activities the day of their flight. The crew are seen eating breakfast, suiting-up, walking out to the Astronaut-Van, putting on life vests in the 'White Room' area, and entering the crew module of the Discovery Orbiter. Footage also includes the deployment of the Ulysses satellite. The Discovery spacecraft is seen as it approaches and lands at Edwards Air Force Base. Also shown are several scenes from different cameras of both launching and landing of the STS-41 spacecraft.

Source record↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗

Space Qualification Test of a-Silicon Solar Cell Modules

The basic requirements of solar cell modules for space applications are generally described in MIL-S-83576 for the specific needs of the USAF. However, the specifications of solar cells intended for use on space terrestrial applications are not well defined. Therefore, this qualifications test effort was concentrated on critical areas specific to the microseismometer probe which is intended to be included in the Mars microprobe programs. Parameters that were evaluated included performance dependence on: illuminating angles, terrestrial temperatures, lifetime, as well as impact landing conditions. Our qualification efforts were limited to these most critical areas of concern. Most of the tested solar cell modules have met the requirements of the program except the impact tests. Surprisingly, one of the two single PIN 2 x 1 amorphous solar cell modules continued to function even after the 80000G impact tests. The output power parameters, Pout, FF, Isc and Voc, of the single PIN amorphous solar cell module were found to be 3.14 mW, 0.40, 9.98 mA and 0.78 V, respectively. These parameters are good enough to consider the solar module as a possible power source for the microprobe seismometer. Some recommendations were made to improve the usefulness of the amorphous silicon solar cell modules in space terrestrial applications, based on the results obtained from the intensive short term lab test effort.

Kim, Q.↗

Fault-tolerant software for aircraft control systems

Concepts for software to implement real time aircraft control systems on a centralized digital computer were discussed. A fault tolerant software structure employing functionally redundant routines with concurrent error detection was proposed for critical control functions involving safety of flight and landing. A degraded recovery block concept was devised to allow collocation of critical and noncritical software modules within the same control structure. The additional computer resources required to implement the proposed software structure for a representative set of aircraft control functions were discussed. It was estimated that approximately 30 percent more memory space is required to implement the total set of control functions. A reliability model for the fault tolerant software was described and parametric estimates of failure rate were made.

Source record↗