Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Orbital fluid servicing and resupply operations

The capability to reservice spacecraft and satellites with expendable fluids will provide significant increases in the usability, operational efficiency and cost effectiveness of in-space systems. Initial resupply will be accomplished from the Orbiter cargo bay starting with monopropellant servicing which will eventually be extended to servicing of bipropellants and pressurants. Other fluids, such as freon, ammonia, methanol, superfluid helium, and liquid/gaseous nitrogen may also need to be resupplied once a space station becomes a reality. These fluids/gases are required for subsystem working fluid replacement and payload/experiment fluid replenishment. A logistics module operating on a 90 day schedule is planned for space station servicing. Resupplying hundreds of thousands of pounds of cryogenic propellants and reactants for users such as the Orbital Transfer Vehicle (OTV) also represents future logistics challenges. Implementation of on-orbit fluid transfer requires solving many problems including fluid management in the low-g environment, system docking and interface mating, configuration of user friendly avionics to monitor and control the entire servicing operation, and minimized maintenance and enhanced reliability. Candidate fluid transfer methods and possible gas transfer methods are discussed, and preliminary storable monopropellant and bipropellant tanker designs are summarized.

Eberhardt, R. N.↗

Mobile remote manipulator vehicle system

A mobile remote manipulator system is disclosed for assembly, repair and logistics transport on, around and about a space station square bay truss structure. The vehicle is supported by a square track arrangement supported by guide pins integral with the space station truss structure and located at each truss node. Propulsion is provided by a central push-pull drive mechanism that extends out from the vehicle one full structural bay over the truss and locks drive rods into the guide pins. The draw bar is now retracted and the mobile remote manipulator system is pulled onto the next adjacent structural bay. Thus, translation of the vehicle is inchworm style. The drive bar can be locked onto two guide pins while the extendable draw bar is within the vehicle and then push the vehicle away one bay providing bidirectional push-pull drive. The track switches allow the vehicle to travel in two orthogonal directions over the truss structure which coupled with the bidirectional drive, allow movement in four directions on one plane. The top layer of this trilayered vehicle is a logistics platform. This platform is capable of 369 degees of rotation and will have two astronaut foot restraint platforms and a space crane integral.

Bush, Harold G.↗

Prototype resupply scheduler

Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

Tanner, Steve↗

Space station heavy lift launch vehicle utilization

The use of Heavy Lift Launch Vehicles (HLLVs) for Space Station assembly, logistics. and resupply is explored. Potential HLLVs, including those based on the Titan, and Shuttle-derived vehicles (SDV), are discussed. The baseline Critical Evaluation Task Force (CETF) Space Station assembly sequence is described and compared with assembly options made possible through the use of HLLVs. The issues of cost, dual compatibility with the Space Shuttle Space Transportation System (STS), co-manifesting of payloads with other science missions cargo return, and ground handling and launch facilities are also considered. The main advantage achieved by using HLLVs are simplification of assembly procedures, added resupply capability, and increased assured access to space. The major disadvantages are increased orbital flight operations complexity, higher logistics costs, and additional ground handling/launch facility requirements. Also, there will not be any improvement in return cargo capacity, nor any addition to crew transport capabilities. Finally, the dual STS/HLLV compatibility should be maintained to minimize program risk. HLLV and Orbital Maneuvering Vehicle design must parallel that of the Space Station.

Deryder, L. J.↗

Alternate transportation system

Three missions have been identified by NASA for a Space Shuttle-supplementing Alternate Transportation System (ATS) encompassing combinations of booster vehicles, crew modules, and service modules: (1) to achieve manned access to orbit for Space Station crew rotation every 90 days, (2) the lofting of a logistics module resupplying the Space Station every 180 days, and (3) the simultaneous launch of both crews and logistics to the Space Station. A reentry glider is considered, in conjunction with the Space Shuttle's unmanned cargo version and the Apollo manned capsule, as an important ATS element. The Titan IV/NUS is used as a booster.

Zertuche, Tony↗

The Space Station Freedom - International cooperation and innovation in space safety

The Space Station Freedom (SSF) being developed by the United States, European Space Agency (ESA), Japan, and Canada poses novel safety challenges in design, operations, logistics, and program management. A brief overview discloses many features that make SSF a radical departure from earlier low earth orbit (LEO) space stations relative to safety management: size and power levels; multiphase manned assembly; 30-year planned lifetime, with embedded 'hooks and scars' forevolution; crew size and skill-mix variability; sustained logistical dependence; use of man, robotics and telepresence for on-orbit maintenance of station and free-flyer systems; closed-environment recycling; use of automation and expert systems; long-term operation of collocated life-sciences and materials-science experiments, requiring control and segregation of hazardous and chemically incompatible materials; and materials aging in space.

Rodney, George A.↗

EVA crewperson overboard - Simplified rescue aid (SIRA)

This paper discusses potential roles for extravehicular activity (EVA) in space logistics and the possibilities for a crewperson to become inadvertently detached from the work site. Factors which could cause the detachment will be presented and a rescue technique described. Finally, implications to the design and implementation of space logistics will be portrayed relative to minimizing or eliminating the adrift EVA crewperson possibility.

Fisher, H. T.↗

ISyCL technical report

The Air Force Integrated Information Systems Evolution Environment (IISEE) is a program focused on the development of technology for enabling the planning definition development and maintenance of evolutionary integrated information systems. This program has studied the representational needs of this knowledge base from the point of view of the needs of engineering, manufacturing, and logistics Evolutionary Information Systems (EIS). The definition of the concepts for a suite of automated tools and environments to support the pursuit of such engineering, manufacturing, and logistics EIS's has also required examination of languages and representation schemes for the knowledge base of these integrated systems. To accomplish this purpose, the language must be very rich, and must support object orientation, relational orientation, persistent storage, process transaction specification, and first order logic. The task of designing a unified language which supports these paradigms is a challenge. The Information Systems Constraint Language (ISyCL) is described. It was designed to meet the definitional and knowledge representation needs of three perspectives. It supports users from the area expert to the data base designer.

Decker, Louis P.↗

Integration mockup and process material management system

Work to define and develop a full scale Space Station Freedom (SSF) mockup with the flexibility to evolve into future designs, to validate techniques for maintenance and logistics and verify human task allocations and support trade studies is described. This work began in early 1985 and ended in August, 1991. The mockups are presently being used at MSFC in Building 4755 as a technology and design testbed, as well as for public display. Micro Craft also began work on the Process Material Management System (PMMS) under this contract. The PMMS simulator was a sealed enclosure for testing to identify liquids, gaseous, particulate samples, and specimen including, urine, waste water, condensate, hazardous gases, surrogate gasses, liquids, and solids. The SSF would require many trade studies to validate techniques for maintenance and logistics and verify system task allocations; it was necessary to develop a full scale mockup which would be representative of current SSF design with the ease of changing those designs as the SSF design evolved and changed. The tasks defined for Micro Craft were to provide the personnel, services, tools, and materials for the SSF mockup which would consist of four modules, nodes, interior components, and part task mockups of MSFC responsible engineering systems. This included the Engineering Control and Life Support Systems (ECLSS) testbed. For the initial study, the mockups were low fidelity, soft mockups of graphics art bottle, and other low cost materials, which evolved into higher fidelity mockups as the R&D design evolved, by modifying or rebuilding, an important cost saving factor in the design process. We designed, fabricated, and maintained the full size mockup shells and support stands. The shells consisted of cylinders, end cones, rings, longerons, docking ports, crew airlocks, and windows. The ECLSS required a heavier cylinder to support the ECLSS systems test program. Details of this activity will be covered. Support stands were designed and built for each module to sufficiently move and rotate each module. Secondary structures such as floors, ceilings, bulkheads, standoffs, racks, etc. were developed and built.

Verble, Adas James, Jr.↗

Development of a Weibull posterior distribution by combining a Weibull prior with an actual failure distribution using Bayesian inference

A Bayesian inference process for system logistical planning is presented which provides a method for incorporating actual failures with prediction data for an ongoing and improving reliability estimates. The process uses the Weibull distribution, and provides a means for examining and updating logistical and maintenance support needs.

Giuntini, Michael E.↗

The role of the National Launch System in support of Space Station Freedom

A study was performed to determine the most appropriate potential use of the National Launch System (NLS) for Space Station Freedom (SSF) logistics resupply and growth assembly needs. Objectives were to estimate earth-to-SSF cargo requirements, identify NLS sizing trades, and assess operational constraints of a shuttle and NLS transportation infrastructure. Detailed NLS and Shuttle flight manifests were developed to model varying levels of NLS support. NLS delivery of SSF propellant, and in some cases, cryoenic fluids, yield significant shuttle flight savings with minimum impact to the baseline SSF design. Additional cargo can be delivered by the NLS if SSF trash disposal techniques are employed to limit return cargo requirements. A common vehicle performance level can be used for both logistics resupply and growth hardware delivery.

Green, J. L.↗

The environmental control and life-support system for a lunar base: What drives its design

The purpose of this paper is to identify and briefly discuss some of the ground rules and mission scenario details that become drivers of the environmental control and life support (ECLS) system design and of the logistics related to the design. This paper is written for mission planners and non-ECLS system engineers to inform them of the details that will be important to the ECLS engineer when the design phase is reached. In addition, examples illustrate the impact of some selected mission characteristics on the logistics associated with ECLS systems. The last section of this paper focuses on the ECLS system technology development sequence and highlights specific portions that need emphasis.

Hypes, Warren D.↗

RENEW v3.2 user's manual, maintenance estimation simulation for Space Station Freedom Program

RENEW is a maintenance event estimation simulation program developed in support of the Space Station Freedom Program (SSFP). This simulation uses reliability and maintainability (R&M) and logistics data to estimate both average and time dependent maintenance demands. The simulation uses Monte Carlo techniques to generate failure and repair times as a function of the R&M and logistics parameters. The estimates are generated for a single type of orbital replacement unit (ORU). The simulation has been in use by the SSFP Work Package 4 prime contractor, Rocketdyne, since January 1991. The RENEW simulation gives closer estimates of performance since it uses a time dependent approach and depicts more factors affecting ORU failure and repair than steady state average calculations. RENEW gives both average and time dependent demand values. Graphs of failures over the mission period and yearly failure occurrences are generated. The averages demand rate for the ORU over the mission period is also calculated. While RENEW displays the results in graphs, the results are also available in a data file for further use by spreadsheets or other programs. The process of using RENEW starts with keyboard entry of the R&M and operational data. Once entered, the data may be saved in a data file for later retrieval. The parameters may be viewed and changed after entry using RENEW. The simulation program runs the number of Monte Carlo simulations requested by the operator. Plots and tables of the results can be viewed on the screen or sent to a printer. The results of the simulation are saved along with the input data. Help screens are provided with each menu and data entry screen.

Bream, Bruce L.↗

An engineer/constructor's view of lunar resource development

A strawman lunar outpost scenario has been postulated as a special focus to guide the papers in this symposium. This scenario describes an evolving facility with basic components, personnel, and activities intended to support lunar missions that lead to a permanent occupation on the lunar surface. The engineer/constructor's view of establishing a lunar outpost is largely concerned with identifying and analyzing the logistics needed to transform the engineering designs on paper into a constructed and operating facility. This means that all aspects of the outpost design will be examined to satisfy constructability requirements and to develop a construction management plan that leads to successful facility startup and routine operations. Whether the facility is to be devoted to materials production, vehicle refueling, or science projects will influence the construction plan in its details, but the construction of all lunar facilities will be mainly governed by the difficult logistics path from Earth to the lunar surface.

Jones, Carleton H.↗

Systems engineering studies of on-orbit assembly operation

While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.

Morgenthaler, George W.↗

An Initial Mars Habitat (IMH)

As long duration, manned missions to Mars are studied for feasibility, the requirements to maintain a crew for two years in hostile environments while allowing productive and necessary work to occur, quickly becomes a driving force. Based on a mission scenario developed in the Explorations Program Office at the Johnson Space, the Initial Mars Habitat (IMH) explores one solution to providing a six person crew with the necessary hardware, logistics and environment to support a 500 day Martian surface stay. Many key issues drove the development of this initial concept; crew safety, logistics resupply, crew productivity and several critical mission element assumptions such as the limitations of a surface lander. Consideration of expansion beyond the first mission to an enhanced capability base was also integrated into the development of the IMH.

Gutierrez, D. J.↗

Advanced construction management for lunar base construction - Surface operations planner

The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

Kehoe, Robert P.↗

Maintainability Program Requirements for Space Systems

This document is established to provide common general requirements for all NASA programs to: design maintainability into all systems where maintenance is a factor in system operation and mission success; and ensure that maintainability characteristics are developed through the systems engineering process. These requirements are not new. Design for ease of maintenance and minimization of repair time have always been fundamental requirements of the systems engineering process. However, new or reusable orbital manned and in-flight maintainable unmanned space systems demand special emphasis on maintainability, and this document has been prepared to meet that need. Maintainability requirements on many NASA programs differ in phasing and task emphasis from requirements promulgated by other Government agencies. This difference is due to the research and development nature of NASA programs where quantities produced are generally small; therefore, the depth of logistics support typical of many programs is generally not warranted. The cost of excessive maintenance is very high due to the logistics problems associated with the space environment. The ability to provide timely maintenance often involves safety considerations for manned space flight applications. This document represents a basic set of requirements that will achieve a design for maintenance. These requirements are directed primarily at manned and unmanned orbital space systems. To be effective, maintainability requirements should be tailored to meet specific NASA program and project needs and constraints. NASA activities shall invoke the requirements of this document consistent with program planning in procurements or on inhouse development efforts.

Source record↗