Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Leak detection of the Space Station Freedom U.S. Lab vacuum system using reverse flow leak detection methodology

A vacuum system leak detection technique (reverse flow leak detection) under development for use aboard Space Station Freedom is presented. The technique will be applied to the Vacuum System (VS) and Waste Gas Management Subsystem (WGMS) of the U.S. Lab Module. These two systems contain over 45.7 m of distributed vacuum tubing located in remote utility runs. Fluid flow calculations which utilize known system geometry and measured steady state pressure measurements from the VS and WGMS can be used to identify leak sites within +/- 38 cm. Exact leak position can then be pinpointed by conventional tracer gas leak detection in the identified region. Tests have been performed using a simple, unrestricted 12.8 m length of vacuum tubing with a calibrated air leak attached.

Moore, Jeffrey D.↗

Finding and Fixing a Small Low Temperature Leak - A Case Study on XRISM/Resolve

The Resolve instrument on the X-Ray Imaging and Spectroscopy Mission (XRISM) uses an Adiabatic Demagnetization Refrigerator (ADR) to cool extremely sensitive x-ray microcalorimeters to 50 mK. A 40-liter superfluid helium dewar and a 4.5 K Joule Thomson (JT)/Stirling cryocooler serve as heat sinks for the ADR and staged cooling for the dewar. The superfluid helium lifetime is required to last at least 3 years on orbit with margin. The superfluid helium dewar developed a small leak (~5e-7 Pa m^3/s) at low temperature which compromised the dewar vacuum in two days of ground testing. It turns out that this leak disappears completely at room temperature (<5e-13 Pa m^3/s). This presentation describes the lengthy process of characterizing, isolating, and ultimately, repairing this leak.

Michael DiPirro↗

Simulant Development for Hanford Tank Farms Double Valve Isolation (DVI) Valves Testing

Leakage testing of a representative sample of the safety-significant isolation valves for Double Valve Isolation (DVI) in an environment that simulates the abrasive characteristics of the Hanford Tank Farms Waste Transfer System during waste feed delivery to the Waste Treatment and Immobilization Plant (WTP) is to be conducted. The testing will consist of periodic leak performed on the DVI valves after prescribed numbers of valve cycles (open and close) in a simulated environment representative of the abrasive properties of the waste and the Waste Transfer System. The valve operations include exposure to cycling conditions that include gravity drain and flush operation following slurry transfer. The simulant test will establish the performance characteristics and verify compliance with the Documented Safety Analysis. Proper simulant development is essential to ensure that the critical process streams characteristics are represented, National Research Council report “Advice on the Department of Energy's Cleanup Technology Roadmap: Gaps and Bridges”

DVI Simulant↗

A Focus on Cryogenic Engineering for the Primordial Inflation Polarization Explorer (PIPER) Mission

Cryogenic engineering involves design and modification of equipment that is used under boiling point of nitrogen which is 77 K. The focus of this paper will be on the design of hardware for cryogenic use and a retrofit that was done to the main laboratory cryostat used to test flight components for the Primordial Inflation Polarization Explorer balloon-borne mission. Data from prior tests showed that there was a superfluid helium leak and a total disassemble of the cryostat was conducted in order to localize and fix the leak. To improve efficiency new fill tubes and clamps with modifications were added to the helium tank. Upon removal of the tank, corrosion was found on the flange face that connects to the helium cold plate and therefore had to be fully replaced and copper plated to prevent future corrosion. Indium seals were also replaced for the four fill tubes, a helium level sensor, and the nitrogen and helium tanks. Four additional shielded twisted pairs of cryogenic wire and a wire harness for the Superconducting Quantum Interference Devices (SQUIDs) were added. Finally, there was also design work done for multiple pieces that went inside the cryostat and a separate probe used to test the SQUIDs. Upon successful completion of the cryostat upgrade, tests were run to check the effectiveness and stability of the upgrades. The post-retrofit tests showed minor leaks were still present and due to this, superfluidity has still not been attained. As such there could still be a possibility of a superfluid leak appearing in the future. Regardless, the copper plating on the helium tank has elongated the need to service it by three to five years.

Rosas, Rogelio↗

A Distributed Intelligent Automated Demand Response Building Management System

The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measurements of Hydrogen Generation Rates using a Sealed Reactor System - 19428

Sealed reactor tests were performed to measure the hydrogen generation rate (HGR) from stored radioactive waste at the Savannah River Site. HGR may be very low, on the order of 7.5 x 10{sup -13} (m{sup 3}/h)/L [that is, cubic meters of H{sub 2} generated per hour per liter of radioactive liquid waste, or 10{sup -10} (ft{sup 3}/h)/gal]. Because the estimated HGR limit of detection for an open, continuous flow, system is approximately 7.5 x 10{sup -10} (m{sup 3}/h)/L [or 10{sup -7} (ft{sup 3}/h)/gal], a more sensitive method was needed. By accumulating generated gasses in a sealed system without a continuous purge gas, the resulting concentrations can increase the sensitivity of measurement, which is based on time of heating. In 2017, Savannah River Remediation declared a Potential Inadequacy in the Safety Analysis related to the potential thermal decomposition of organics that generate hydrogen in each of three Liquid Waste facilities: Concentration, Storage and Transfer Facility, Saltstone Production Facility, and the Defense Waste Processing Facility. The research for this study concerns low activity waste of Tank 50, which feeds the Saltstone Production Facility. This study evaluated the impact of organics including formate on the generation of H{sub 2}. Samples of SRS Tank 50 waste, which is a nominal 5 molar sodium salt solution, were sealed in stainless steel reactors and held at varying temperatures, e.g., 50 deg. C, 75 deg. C, 100 deg. C, and 120 deg. C, to determine if organic compounds are decomposing into H2. The experiments included trace solids used to stabilize waste in grout, e.g., grout-premix and Blast Furnace Slag, to determine if any solid phase reactions are present, which would accelerate or inhibit the generation of H{sub 2} at these temperatures. This paper describes the sealed reactors designed and constructed at Savannah River National Laboratory and the radioactive tests that were performed to measure HGR in both oxic and anoxic atmospheres. The shakedown tests showed the sealed reactors to be leak tight and hydrogen concentrations from calibrated standards could be accurately measured. Previous simulant tests helped to perfect the test methods and better design the radioactive tests. The radioactive results showed that the rate of hydrogen generated from Tank 50 waste, over a range of temperatures from 30 deg. C up to 120 deg. C, is bounded by an empirical relation (Hu Equation) that can be used to approximate HGRs in Tank 50 radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitivity Analysis of Salt Storage Cavern Mechanical Integrity Test Parameters

This report examines the sensitivity of salt cavern Mechanical Integrity Tests (MIT) to uncertainties in key test parameters. MIT's are used by cavern operators to detect and quantify leak rates in access wells in underground salt storage caverns and involve a suite of measured and assumed parameters that have a direct impact on the sensitivity of the testing to detect actual leaks from the cavern storage system. Determining the sensitivity of the testing to these different parameters provides a basis for understanding the results from, and informing the design criteria for, this type of testing. Without fully understanding the sensitivity of the test to the testing parameters, it is possible that the test results may not accurately reflect the integrity of the cavern system; an actual leak may be missed, or an intact system may be interpreted as leaking. This report reviews the main parameters included in MITs and examines how selected changes in their values can impact test results. The deviations used in the sensitivity analyses were designed to be within the ranges believed to be similar to those which may be encountered during testing. The results show that small, plausible fluctuations in some of the parameters measured values can have a significant impact on the testing results. Of the parameters studied here, the sensitivity analyses showed the order of importance to be (from highest to lowest): nitrogen-oil interface depth measurement, well bore temperature, well head pressure, and finally the internal geometry of the testing interval.

42 ENGINEERING↗

Metal Fire Implications for Advanced Reactors, Part 2: PIRT Results

This report documents the results of a Phenomena Identification and Ranking Table (PIRT) exercise performed at Sandia National Laboratories (SNL) as well as the experimental and modeling program that have been designed based on the PIRT results. A PIRT exercise is a structured and facilitated expert elicitation process. In this case, the expert panel was comprised of nine recognized fire science and aerosol experts. The objective of a PIRT exercise is to identify phenomena associated with the intended application and to then rank the current state of knowledge relative to each identified phenomenon. In this particular PIRT exercise the intended application was sodium fire modeling related to sodium-cooled advanced reactors. The panel was presented with two specific fire scenarios, each based on a hypothetical sodium leak in an Advanced Breeder Test Reactor (ABTR) design. For both scenarios the figure of merit was the ability to predict the thermal and aerosol insult to nearby equipment (i.e. heat exchangers and other electrical equipment). When identifying phenomena of interest, and in particular when ranking phenomena importance and the adequacy of existing modeling tools and data, the panel was asked to subjectively weigh these factors in the context of the specified figure of merit. Given each scenario, the panel identified all those related phenomena that are of potential interest to an assessment of the scenario using fire modeling tools to evaluate the figure of merit. Each phenomenon is then ranked relative to its importance in predicting the figure of merit. Each phenomenon is then further ranked for the existing state of knowledge with respect to the ability of existing modeling tools to predict that phenomena, the underlying base of data associated with the phenomena, and the potential for developing new data to support improvements to the existing modeling tools. For this PIRT two hypothetical sodium leak scenarios were evaluated for the ABTR design. The first scenario was a leak in the hot side of the intermediate heat transport system (IHTS) resulting in a sodium pool fire. The second scenario was a leak in the cold side of the IHTS resulting in a sodium spray fire.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of an operational helium leak detection system for the National Space Transportation System

The objectives, techniques, and results of a special test program to validate a helium mass spectrometer leak detector (MLSD) for use in the National Space Transportation System (NSTS) program are examined. The discussion includes the background history and the specific program requirements established for helium leak detection, including a description of routine helium leak detector operations during orbiter ground turnaround. In addition to helium mass spectrometry, several other leak detection methods used in the NSTS program are described.

Bilardo, V. J., Jr.↗

Slow Strain Rate Testing of A537 Tank Wall Material

At Savannah River Site (SRS), High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion and/or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate will increase, while the hydroxide and nitrite concentration of the interstitial liquid will deplete and become insufficient to prevent the onset of corrosion attack. Tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite. However, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processing. This testing program was designed to examine the risk of SCC associated with utilizing the pitting factor (PF) and nitrite/nitrate (NO 2 - /NO 3 - ) ratio limits for handling dissolved salt solutions at an elevated temperature in the carbon steel waste tanks. The previously identified limits are a PF of 1.2 and an NO 2 - /NO 3 - ratio of 0.15. The results indicate that as long as the NO 2 - /NO 3 - ratio exceeds 0.1 and the PF is above approximately 0.8, there is a discernible safety margin between the open circuit potential (OCP) and the critical cracking potential (CCP) observed during applied potential testing. However, this margin, defined by the difference between the OCP and CCP, is relatively narrow, ranging from 0.1 to 0.25 volts. This small margin raises concerns about potential shifts in OCP during waste retrieval operations, which could inadvertently increase the risk of SCC if the OCP approaches or exceeds the CCP. These results confirm that dissolved salt solutions provide a potent chemistry that, under certain conditions, makes carbon steel susceptible to SCC. The next question to consider is the influence these results have on decisions for storage and retrieval of waste from the tanks. For Type III/IIIA waste tanks, the risk of SCC remains very low. First, and most importantly, the post-weld stress relief of the tanks has reduced the residual stress near the welds. Thus, without the stress component, SCC risk is minimized. The material of construction (A537 Carbon steel) for the Type III/IIIA tanks is superior to the steel in its resistance to SCC than the steel that was utilized for the Type I, II, and IV tanks (A285 carbon steel). From a chemistry control standpoint for a Type III/IIIA tank directly involved with handling dissolved salt solutions, the PF and NO 2 - /NO 3 - ratio limits may be utilized wherein chemistry control provides an extra layer of defense against SCC. Chemistry control for a Type III/IIIA tank minimizes the risk for a tank that may receive the dissolved salt solution, particularly if that tank is a Type I, II, or IV waste tank. On the other hand, if the dissolved salt solution is handled by a Type I, II, or IV waste tank the risk of SCC is real. The potent chemistry, absence of stress relief, and inferior material result in a condition that is conducive to cracking. Efforts should be made to either avoid transferring waste that may not meet the PF and NO 2 - /NO 3 - ratio criteria to one of these tanks or if it is unavoidable, take measures to minimize the consequences of a leak. As shown by these tests, even if the PF and NO 2 - /NO 3 - ratio criteria are met, there is a risk that the tank potential may be disturbed in the positive direction and the risk of SCC increase.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A consideration of radionuclide particulate resuspension as a verification tool in the CTBT on-site inspection verification component

Here, a considerable amount of radioactivity could leak from an underground nuclear test at levels easily detectable by one or more of the radiological methods available for on-site inspection, even if the event does not immediately result in gas or particulate debris reaching stations of the International Monitoring System, of the Comprehensive Nuclear-Test-Ban Treaty. This work presents a feasibility study showing that winds or human activity can resuspend surface debris in quantities that could be detected using high-volume aerosol samplers outside an established restricted area and subsequent measurement in a Base of Operations laboratory.

CTBT↗

SPR Hydrostatic Column Model Verification and Validation.

A Hydrostatic Column Model (HCM) was developed to help differentiate between normal "tight" well behavior and small-leak behavior under nitrogen for testing the pressure integrity of crude oil storage wells at the U.S. Strategic Petroleum Reserve. This effort was motivated by steady, yet distinct, pressure behavior of a series of Big Hill caverns that have been placed under nitrogen for extended period of time. This report describes the HCM model, its functional requirements, the model structure and the verification and validation process. Different modes of operation are also described, which illustrate how the software can be used to model extended nitrogen monitoring and Mechanical Integrity Tests by predicting wellhead pressures along with nitrogen interface movements. Model verification has shown that the program runs correctly and it is implemented as intended. The cavern BH101 long term nitrogen test was used to validate the model which showed very good agreement with measured data. This supports the claim that the model is, in fact, capturing the relevant physical phenomena and can be used to make accurate predictions of both wellhead pressure and interface movements.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Vamistor resistor investigation

Results are presented of the failure investigation conducted on resistors produced by the Vamistor Divison, Wagner Electric Corporation. This failure investigation included; failure analyses, chemical and metallurgical analyses, failure mechanism studies, seal leak analyses, and nondestructive stress tests. The data, information, conclusions, and recommendation can be helpful in assessing current usage of these resistors.

Source record↗

Skylab program. Earth resources experiment package. Sensor performance report. Volume 7 (S190B): SL2, SL3 and SL4 evaluations

The S190B Earth Terrain Camera (ETC) operated acceptably for all of its scheduled EREP passes throughout the SL2 mission. The crew reported no problems in unstowing the camera, changing filters, installing the ETC window in the SAL, or installing the camera onto the window. The ETC was operated for a total of seven times with no failures. The clock on the ETC was checked on DOY 170 (June 19, 1973) and was found to be 30 min. and 58 sec. slower than GMT. The change in time was expected since a similar circumstance was experienced during ETC qualification testing for launch vibration. A leak existed in the seal of the spare magazine to the camera vacuum interface. For EREP passes 08 and 10, black-and-white film EK 3414 (roll no. 82) was installed in this spare magazine. Since there was an audible hiss, the vacuum hose was not connected to the camera. This caused the vacuum platen to be inoperable, resulting in some degradation in resolution for this roll of film. The vegetation of the South American jungle areas proved to be much darker than vegetation found in the United States, and was consequently about 1/2 stop underexposed in all cases.

Kenney, G. P.↗

Measuring Cyclic-Stress Properties of Pressure Vessels

Simulated-service cycle differs from conventional proof-test cycle in that specimen is subjected to sine-wave variation of stress instead of prolonged steady stress. Simulated-service testing is performed at low and high temperatures as well as at room temperatures. (Flaws initiated by severe stresses of proof testing can later develop into leaks during service, thus effectively reducing useful service life.) Method may be useful for commercial thin-wall vessels.

Fiftal, C. F.↗

Development of Long-Lifetime Pulsed Gas Valves for Pulsed Electric Thrusters

The design and test results for two types of pulsed gas valves are presented. The valves, a piezo valve and a solenoid actuated valve, must have exceedingly long lifetime to support gas-fed pulsed electric thruster operation for missions of interest. The performance of both valves was tested, with both demonstrating the capability to throttle the gas flow rate while maintaining low leakage levels below 10(exp -3) sccs of He at the beginning of valve lifetime. The piezo valve varies the flow rate by changing the amount that the valve is open, which is a function of applied voltage. This valve demonstrated continuous throttlability from 0-10 mL/s, with opening and closing times of 100 microsecond or less. The solenoid actuated valve flow rate changes as a function of the inlet gas pressure, with demonstrated flow rates in these tests from 2.7-11 mL per second. The valve response time is slower than the piezo valve, opening in 1-2 ms and closing in several ms. The solenoid actuated valve was tested to one million cycles, with the valve performance remaining relatively unchanged throughout the test. Galling of the sliding plunger caused the valve to bind and fail just after one million cycles, but at this point in the test the valve sealing surface leak rate still appeared to be well below the maximum target leak rake of 1×10(exp -3) sccs of He.

Burkhardt, Wendel M.↗

Best Practices, Lessons Learned, and Examples on the Application of Damage Tolerance in Space Structures

Damage tolerance is an important consideration in space structures applications. The intent of damage tolerance is to demonstrate that the structure is robust to the presence of flaws over the service life of the space vehicle. Damage tolerance requirements in documents such as those in NASA, AIAA, and ISO can be challenging to implement. The intent of this paper is three-fold: (1) Provide best practices in the application of damage tolerance requirements for space applications, (2) Provide lessons learned for each of class of hardware, (3) Provide examples of challenging situations encountered in the application of damage tolerance. Examples cover additive manufacturing, composite overwrapped pressure vessels, pressurized structures, liquid rocket engines, thermal protection systems, and other classes of hardware. The philosophy and limitations of leak before burst and proof test logic are also discussed. Finally, a discussion on elastic-plastic fracture mechanics with comparisons to test data will be presented.

Best Practices↗

Improvements of fuel failure detection in boiling water reactors using helium measurements

To certify a continuous and safe operation of a boiling water reactor, careful surveillance of fuel integrity is of high importance. The detection of fuel failures can be performed by off-line gamma spectroscopy of off-gas samples and/or by on-line nuclide specific monitoring of gamma emitting noble gases. To establish the location of a leaking fuel rod, power suppression testing can be used. The accuracy of power suppression testing is dependent on the information of the delay time and the spreading of the released fission gases through the systems before reaching the sampling point. This paper presents a method to improve the accuracy of power suppression testing by determining the delay time and gas spreading profile. To estimate the delay time and examine the spreading of the gas in case of a fuel failure, helium was injected in the feed water system at Forsmark 3 nuclear power plant. The measurements were performed by using a helium detector system based on a mass spectrometer installed in the off-gas system. The helium detection system and the results of the experiment are presented in this paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗