Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Rhesus leg muscle EMG activity during a foot pedal pressing task on Bion 11

Rhesus monkeys (Macaca mulatta) were trained to perform a foot lever pressing task for a food reward. EMG activity was recorded from selected lower limb muscles of 2 animals before, during, and after a 14-day spaceflight and from 3 animals during a ground-based simulation of the flight. Integrated EMG activity was calculated for each muscle during the 20-min test. Comparisons were made between data recorded before any experimental manipulations and during flight or flight simulation. Spaceflight reduced soleus (Sol) activity to 25% of preflight levels, whereas it was reduced to 50% of control in the flight simulation. During flight, medial gastrocnemius (MG) activity was reduced to 25% of preflight activity, whereas the simulation group showed normal activity levels throughout all tests. The change in MG activity was apparent in the first inflight recording, suggesting that some effect of microgravity on MG activity was immediate.

Flight Experiment↗

STS-114: Discovery Launch Readiness Press Conference

This press conference, attended by representatives from the national, Florida, and aerospace media, addresses launch, weather, and safety issues related to Space Shuttle Discovery prior to its launch on the STS-114 Return to Flight mission. The Master of Ceremonies is George Diller from NASA Public Affairs, and the panelists are: Space Shuttle Program Manager Bill Parsons, ISS Program Manager (JSC) Bill Gerstenmaier, Space Shuttle Deputy Program Manager Wayne Hale, Director of Shuttle Processing Mike Wetmore, ISS Program Manager (JAXA) Dr. Kuniaki Shiraki, and Launch Weather Officer (USAF) Mindy Chavez. Questions included the following topics: predicted weather conditions at launch, contingency rescue plans, countdown procedures, and risk management, as well as implications of the Return to Flight for the International Space Station (ISS).

Source record↗

STS-114: Discovery Launch Postponement Press Briefing

This press briefing addresses the problem that occurred prior to the launch of the STS-114. Dean Acosta, Deputy Assistant Administrator of Public Affairs, introduces the panel which consists of Dr. Michael Griffin, NASA Administrator, William Readdy, Associate Administrator for Space Operations, Wayne Hale, Space Shuttle Program Deputy Manager, Steve Poulas, Orbiter Project Manager, Mike Leinbach, NASA Launch Director, and Bill Parsons, Space Shuttle Program Manager. Wayne Hale expresses that a problem occurred with one of the low level sensors in the hydrogen tank and that the cause of the problem must be identified and rectified. Steve Poulos talks about establishing a troubleshooting plan as a part of the scrub effort and Mike Leinbach describes the process of draining the external tank. Wayne Hale answers questions about the sensors and if the Space Shuttle Discovery is safe to fly and Steve Poulos answers questions about the possible suspects for this problem.

Source record↗

STS-114/Discovery Flight Readiness Review Press Briefing

This press briefing on Flight Readiness Review (FRR) for the STS-114 Discovery flight is shown. Dean Acosta, Deputy Associate Administrator for Public Affairs, introduces the panel. The panel consist of: Michael Griffin, NASA Administrator, William Readdy, Associate Administrator of Space Operations, Bill Parsons, Space Shuttle Program Manager, and Mike Leinbach, NASA Launch Director. Questions from the media includes the following topics: certification, countdown, ice on the external tank, debris, and safety of the Space Shuttle Discovery.

Source record↗

STS-114: Discovery Post MMT Press Conference

This press conference focuses on the outcome of the Mission Management Team (MMT) meeting. The launch and status of the Space Shuttle Discovery is discussed. George Diller from NASA Public Affairs introduces the panel which consists of: Wayne Hale, Space Shuttle Program Deputy Manager and Mike Wetmore, Director of Space Shuttle Processing at Nasa Kennedy Space Center. The news media asks questions about the history of the low level sensors in the hydrogen tank, the cryogenic atmosphere around the sensors, troubleshooting, astronaut activities, possible rollback procedures.

Source record↗

STS-114: Discovery Crew Post Landing Press Briefing

The crew of the STS-114 Discovery is shown during a post landing press briefing. Commander Collins introduces the crew members who consist of Pilot Jim Kelley, Mission Specialist Soichi Noguchi from JAXA, Steve Robinson, Mission Specialist and Charlie Camarda, Mission Specialist. Steve Robinson answers a question from the news media about the repair that he performed in orbit, and his feelings about being back in his hometown of California. Commander Collins talks about the most significant accomplishment of the mission. The briefing ends as each crewmember reflects on the Space Shuttle Columbia tragedy and expresses their personal thoughts and feelings as they re-entered the Earth's atmosphere.

Source record↗

STS-114: Post Launch Press Conference

Dean Acosta, Deputy Assistant Administrator for Public Affairs hosted this post launch press conference. Present were Mike Griffin, NASA Administrator; William Ready, Associate Administrator for Space Operations; Bill Parsons, Space Shuttle Program Manager; Mike Leinbach, NASA Launch Director; and Wayne Hill, Deputy Program Manager for Space Shuttle Program. Each expressed thanks to all of NASA Officials and employees, contractors, vendors and the crew for their hard work the past two and a half years that resulted the successful and pristine launch of Space Shuttle Discovery. The Panel emphasized that through extensive technical analysis, thorough planning and tremendous amount of public support brought them full circle again to return to flight. Flight safety, debris during rocket separation, sensors, observations from the mission control, launch conditions were some of the topics discussed with the News media.

Source record↗

STS-114: Discovery Post Landing Press Briefing from JSC

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He noted that the successful flight and return of Discovery is another important milestone, a fresh start, and a new beginning as part of NASA's commitment to the President's vision of man's return to the Moon, Mars and beyond. From this successful test flight, NASA will have a lot of learning and hard work to do in preparation for the next flight. Weather factors, safe landing, touch down, communications, re-entry, the Columbia, were some topics covered with the News media.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

CSA/ASC Press Briefing

Nicole Gignac, Senior Communications Advisor Canadian Space Agency (CSA), introduces the panel for this CSA/ASC press briefing. The panel consist of: Dr. Steve Maclean, CSA astronaut; Dr. Paul Cooper, Deputy General Manager, MacDonald, Dettwiler and Associates Ltd. (MDA); and Dr. Iain Christie, Director of Research and Development from NEPTEC. Maclean will fly on the STS-115 Mission in February of 2006. He presents pictures and talks about the crewmembers of the Space Shuttle Columbia and Space Shuttle Discovery. Maclean also discusses entry risks as it pertains to the leading edge wing of Discovery. Paul Cooper explains and shows a video presentation of Canadarm robotics. The briefing ends with Dr Christie explaining the sensitive three dimensional inspections are performed in space that looks for cracks in the leading edge wing of the Space Shuttle Discovery.

Source record↗

STS-114: Discovery Post Landing Press Briefing

Dean Acosta, NASA Public Affairs Deputy Assistant Administrator hosted this press briefing. Michael Griffin, NASA Administrator; Bill Parsons, Shuttle Program Manager; Michael Leinbach, Shuttle Launch Director; and Bill Ready, Space Operations Associate Administrator were present. The Panel specifically honored the Columbia crew as they praised Commander Eileen Collin's performance in bringing the Discovery and crew safe back to Earth. Re-entry, test flight and next test flight, thermal insulation, heat, vehicle inspection, turn around processing, and ferrying Discovery back to the Kennedy Space Center were topics covered with the News media. Michael Griffin announced the launching of Mars Reconnaissance Orbiter will take place the following morning.

Source record↗

STS-114: Discovery Launch Readiness Press Conference

Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

Source record↗

STS-1: Columbia Pre-Launch Press Conference with Young/Crippin

Commander John Young and pilot Bob Crippin show a short film about the 2 and 1/2 day space mission which encompasses 170 flight objectives. Following the film, they answer questions from the press which cover topics ranging from ejection systems to solid rocket fuels.

Source record↗

STS-121/Discovery: Launch Readiness Press Conference

Participants in the briefing included: Bruce Buckingham (NASA Public Affairs), John Shannon (Chairman, Mission Management Team), Mike Suffredini (ISS Program Manager), Mike Leinbach (Shuttle Launch Director), Alan Thirkettle (ISS Program Manager, ESA) and 1st Lt. Kaleb Nordgen (USAF 45th Weather Squadron). There are no constraints to launch except for questionable weather. The crew is ready to go. PROGRESS has provided logistics and is ready to be installed. No cryogenics have been loaded because of a Phase 1 lightning advisory. The shuttle crew is in good shape, just waiting for the weather to clear. ISS is making preparations for the Columbus Mission and future plans are to increase the crew from 3 to 6 people. The floor was opened to questions from the press.

Source record↗

STS-121: Discovery Pre-Launch Mission Management Team Press Briefing

The briefing began with Allard Buetel (NASA Public Affairs) introducing Bill Gerstenmaier (Associate Administrator for Space Operations) who provided an update of the Mission Management team meeting. The 3 criteria reviewed by the team were: a) ascent heating; b) ice formation and c) remaining foam still intact. The ascent heating had a safety factor of 5 and posed no concern. Ice formation was not a concern. In order to insure there was no damage to the remaining foam, an 8ft. pipe with a camera attached was used to provide pictures. The boroscope pictures showed there was no damage to the brackets or foam. The inspection went very well and the foam was acceptable and ready to fly. Then the floor was open to questions from the press.

Source record↗

Optimization of Hot-Pressed n-Type SiGe/GaP and p-Type SiGe/B Thermoelectric Materials

A comprehensive experimental and theoretical work has been conducted in order to optimize the thermoelectric properties of Si_(80)Ge_(20) materials and reach the goal of a combined figure of merit value of 0.85x10^(-3) K^(-1) averaged over a 600-1000 C temperature range. Improvement for the n-type material has been obtained by determining the optimum amounts of gallium and phosphorus dopants necessary to achieve optimum carrier mobility and concentration. The emphasis is now on the consistent reproducibility of these results through understanding and control of the hot-pressing parameters relating microstructure and composition to the transport properties. The optimum doping level has now been firmly established for p-type materials, and work is concentrating on the reduction in thermal conductivity. BN ultra fine particles have been successfully incorporated into fully dense samples and have resulted in desired improvement of the figure of merit...

Fleurial, Jean-Pierre↗

Oxidation Characterization of Hafnium-Based Ceramics Fabricated by Hot Pressing and Electric Field-Assisted Sintering

Ceramic borides, such as hafnium diboride (HfB2) and zirconium diboride (ZrB2), are members of a family of materials with extremely high melting temperatures referred to as Ultra High Temperature Ceramics (UHTCs). UHTCs constitute a class of promising materials for use in high temperature applications, such as sharp leading edges on future-generation hypersonic flight vehicles, because of their high melting points. The controlled development of microstructure has become important to the processing of UHTCs, with the prospect of improving their mechanical and thermal properties. The improved oxidation resistance of HfB2 has also become important if this material is to be successfully used at temperatures above 2000 C. Furthermore, the use of UHTCs on the leading edges of vehicles traveling at hypersonic speeds will mean exposure to a mixed oxidation environment comprised of both molecular and atomic oxygen. The current study has investigated the high-temperature oxidation behavior of HfB2-based materials in a pure O2 environment, as well as in environments containing different levels of dissociated oxygen (O/O2). Materials were processed by two techniques: conventional hot pressing (HP) and electric field-assisted sintering (FAS). Their oxidation behavior was evaluated in both a tube furnace at 1250 C for 3 hours and in a simulated re-entry environment in the Advanced Heating Facility (AHF) arcjet at NASA Ames Research Center, during a 10-minute exposure to a cold wall heat flux of 250W/sq cm and stagnation pressure of 0.1-0.2 atm. The microstructure of the different materials was characterized before and after oxidation using scanning electron microscopy (SEM).

Gasch, Matt↗

Femoral Blood Flow and Cardiac Output During Blood Flow Restricted Leg Press Exercise

Low load blood flow restricted resistance exercise (LBFR) causes muscle hypertrophy that may be stimulated by the local ischemic environment created by the cuff pressure. However, local blood flow (BF) during such exercise is not well understood. PURPOSE: To characterize femoral artery BF and cardiac output (CO) during leg press exercise (LP) performed at a high load (HL) and low load (LL) with different levels of cuff pressure. METHODS: Eleven subjects (men/women 4/7, age 31.4+/-12.8 y, weight 68.9+/-13.2 kg, mean+/-SD) performed 3 sets of supine left LP to fatigue with 90 s of rest in 4 conditions: HL (%1-RM/cuff pressure: 80%/0); LL (20%/0); LBFR(sub DBP) (20%/1.3 x diastolic blood pressure, BP); LBFR(sub SBP) (20%/1.3 x supine systolic BP). The cuff remained inflated throughout the LBFR exercise sessions. Artery diameter, velocity time integral (VTI), and stroke volume (SV) were measured using Doppler ultrasound at rest and immediately after each set of exercise. Heart rate (HR) was monitored using a 3-lead ECG. BF was calculated as VTI x vessel cross-sectional area. CO was calculated as HR x SV. The data obtained after each set of exercise were averaged and used for analyses. Multi-level modeling was used to determine the effect of exercise condition on dependent variables. Statistical significance was set a priori at p< 0.05. RESULTS: Artery diameter did not change from baseline. BF increased (p<0.05) after exercise in each condition except LBFR(sub SBP) in the order of HL (12.73+/-1.42 cm3,mean+/-SE) > LL (9.92+/-0.82 cm3) > LBFR(sub dBP)(6.47+/-0.79 cm3) > LBFR(sub SBP) (3.51+/-0.59 cm3). Blunted exercise induced increases occurred in HR, SV, and CO after LBFR compared to HL and LL. HR increased 45% after HL and LL and 28% after LBFR (p<0.05), but SV increased (p<0.05) only after HL. Consequently, the increase (p<0.05) in CO was greater in HL and LL (approximately 3 L/min) than in LBFR (approximately 1 L/min). CONCLUSION: BF during LBFR(sub SBP) was 1/3 of that observed in LL, which supports the hypothesis that local ischemia stimulates the LBFR hypertrophic response. As the cuff did not compress the artery, the ischemia may have occurred because of the blunted rise in CO or because arterial BP cannot overcome the cuff pressure. As LBFR(sub DBP) effectively reduced BF and CO with cuff pressures less than systolic BP, future studies should investigate the hypertrophic potential of LBFR at even lower cuff pressures.

Everett, M. E.↗