Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Electrification Futures Study: Impact of Electric Vehicles on Bulk Power Systems

This presentation builds on work presented at IEW2019 on "Transportation Scenarios of Electric Technology Adoption and Power Consumption" by providing insights on the impact of demand-side electrification, and electric vehicles in particular, on electricity supply and bulk power systems. This talk summarizes some results from the multi-year and multi-stakeholder Electrification Futures Study (EFS) series of reports. In particular, this work leverages integrated demand and supply modelling of future energy systems to provide insights on system design and operations focusing on demand flexibility and integration of variable renewables.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Storage Futures Study: The Four Phases of Storage Deployment: A Framework for the Expanding Role of Storage in the U.S. Power System

This report is one in a series of NREL’s Storage Futures Study (SFS) publications. The SFS is a multiyear research project that explores the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS is designed to examine the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data will be published as a series of publications. The table on the next page lists the planned publications and specific research topics they will examine under the SFS. This report, the first in the SFS series, explores the roles and opportunities for new, cost-competitive stationary energy storage with a conceptual framework based on four phases of current and potential future storage deployment, and presents a value proposition for energy storage that could result in substantial new cost-effective deployments. This conceptual framework provides a broader context for consideration of the later reports in the series, including the detailed results of the modeling and analysis of power system evolution scenarios and their operational implications

25 ENERGY STORAGE↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control

With increasing penetrations of volatile renewable generation and cyber-physical disruptions, ensuring the safe operation of bulk power systems has become unprecedentedly challenging. Because communication and computational costs restrict centralized system dispatch to being called upon every few minutes, and because purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. The applicability of distributed control schemes, however, is fundamentally limited by their need for widespread communication and model cognizance. In this context, we put forth a hybrid, low-communication, saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a "hotline" communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, whereas severe violations can be handled by collaboration among a relatively small set of agents. We evaluate the performance of this scheme via numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of load variations and severe low-/high-voltage events.

collaboration↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Interposed pulsed power system for fast separation of radioactive beams

This paper presents the novel design of an interposed pulsed power system, developed to drive a fast-switching magnet with a large multi-mH load inductance, and high field amplitude (> 1 T). This modulator can produce variable flat-top pulses from 1 to 30 ms with rise and fall times of less than 0.5 ms at a variable duty cycle of 3–91% into a heavily inductive load. The system employs a novel over-voltage topology to overcome the inherent inductance and achieve the fast rise and fall times, switching to a precision DC supply to efficiently maintain the flattop without requiring many-kV voltage. We present a power source design consideration, including the results of computer modeling as well as the first experimental results of a modulator scaled test model will also be presented.

47 OTHER INSTRUMENTATION↗

Effect of Accurate Modeling of Converter Interfaced Generation (CIG) on a Practical Bulk Power System

With increased penetration of converter interfaced generation (CIG) in power systems, it becomes imperative to adequately model them in both steady-state and dynamic simulations. There are several modeling approaches and simulation platforms for CIG. In addition, it is noted that suitability of modeling approaches and models is also dependent on the system conditions. However, their suitability has yet to be systematically analyzed, and this becomes a challenge in the industry without a systemic method. To tackle these challenges, in this paper, we first develop a methodology for identifying the maximum penetration of aggregated rooftop sources that can be represented as negative loads in both the steady state and dynamic analysis. Then we verify the suitability of positive-sequence performance-based model and detailed electromagnetic transient (EMT) model for utility-scale PV plants under different fault conditions. Based on the results, we perform dynamic simulations on a large practical system with both positive-sequence transient stability(TS) and EMT-TS hybrid simulation. Our study shows that positive-sequence performance based PV plant model is more suitable for study cases with faults relatively far away from the point of connection, and that positive-sequence models and TS simulation approach can produce comparable results with reference to EMT-TS hybrid simulation for normally-cleared single-line-to-ground faults, but the inadequacy of positive-sequence based model and simulation approach becomes obvious for prolonged-tripping of unbalanced faults in proximity of the PV plants.

Huang, Qiuhua↗

Calculating Critical Inertia of a Power System

The increasing integration of renewable energy sources in modern power systems has led to a decline in system inertia, raising concerns about frequency stability following large disturbances. Determining critical inertia is essential to prevent excessive frequency decline and ensure grid stability. This paper evaluates four different methods for calculating critical inertia, using the Electric Reliability Council of Texas (ERCOT) system as a test case. The results highlight the importance of employing multiple methodologies to capture the full spectrum of inertia requirements.

Hakim sneha, Fariha [University of Tennessee, Knox↗

Enhanced Dynamic Equivalent Identification Method of Large-Scale Power Systems Using Multiple Event

The increasing complexity of the interconnected power system makes high-fidelity dynamic simulation models computationally more intensive. To improve computation efficiency, model reduction techniques have been investigated to only preserve the dynamics in a limited area of interest (study area), while deriving equivalent representation for the external area. For this purpose, a measurement-based reduction approach using system identification techniques has been previously proposed. In that case, external areas are represented by dynamic equivalent loads using transfer function estimation. In this paper, in order to enhance the accuracy of the reduced model in preserving dynamics of the study area, multiple “grid” events of different types and at different locations are considered for identifying the parameters of the equivalent loads. Case studies are carried out in the NPCC 140-bus system. Comparison are made between multiple events training and single event training, highlighting the advantages of the proposed method in providing a better representation of the grid dynamics under different operating conditions.

Xue, Yaosuo↗

Multi-Objective PMU Allocation for Resilient Power System Monitoring

Phasor measurement units (PMUs) enable better system monitoring and security enhancement in smart grids. In order to enhance power system resilience against outages and blackouts caused by extreme weather events or man-made attacks, it remains a major challenge to determine the optimal number and location of PMUs. In this paper, a multi-objective resilient PMU placement (MORPP) problem is formulated, and solved by a modified Teaching-Learning-Based optimization (MO-TLBO) algorithm. Three objectives are considered in the MORPP problem, minimizing the number of PMUs, maximizing the system observability, and minimizing the voltage stability index. The effectiveness of the proposed method is validated through testing on IEEE 14-bus, 30-bus, and 118-bus test systems. The advantage of the MO-TLBO-based MORPP is demonstrated through the comparison with other methods in the literature, in terms of iteration number, optimality and time of convergence.

Multi-Objective Optimization↗

Man‐in‐the‐middle attacks and defence in a power system cyber‐physical testbed

Abstract Man‐in‐The‐Middle (MiTM) attacks present numerous threats to a smart grid. In a MiTM attack, an intruder embeds itself within a conversation between two devices to either eavesdrop or impersonate one of the devices, making it appear to be a normal exchange of information. Thus, the intruder can perform false data injection (FDI) and false command injection (FCI) attacks that can compromise power system operations, such as state estimation, economic dispatch, and automatic generation control (AGC). Very few researchers have focused on MiTM methods that are difficult to detect within a smart grid. To address this, we are designing and implementing multi‐stage MiTM intrusions in an emulation‐based cyber‐physical power system testbed against a large‐scale synthetic grid model to demonstrate how such attacks can cause physical contingencies such as misguided operation and false measurements. MiTM intrusions create FCI, FDI, and replay attacks in this synthetic power grid. This work enables stakeholders to defend against these stealthy attacks, and we present detection mechanisms that are developed using multiple alerts from intrusion detection systems and network monitoring tools. Our contribution will enable other smart grid security researchers and industry to develop further detection mechanisms for inconspicuous MiTM attacks.

Wlazlo, Patrick↗

A Comprehensive Comparison of Methods for Evaluating Dispatch of Long-Duration Energy Storage in Power Systems Models

Long-duration energy storage (LDES) could play a pivotal role in the transformation of electricity grids with high shares of variable renewable energy (VRE) such as solar and wind. However, the weather-dependent nature of VRE introduces challenges for grid balancing and stability, which LDES - along with short-duration energy storage (SDES) - can help address. However, modeling LDES in production cost models (PCMs) is particularly challenging due to the need for high temporal resolution over extended optimization windows while preserving chronology, which ensures the alignment of energy storage operations with VRE generation over multi-day periods. This report compares traditional dispatch methods with advanced LDES dispatch strategies, such as the extended horizon approach, across different PCM platforms and examines tradeoffs and scalability. The comparison reveals that the traditional 1-day optimization horizon within the PCM leads to inefficient utilization of LDES. In contrast, extending the optimization horizon as much as possible significantly reduces curtailment and improves storage dispatch, especially in renewable-dense systems. There is also promise in using state-of-charge or end volume targets set by an external model, however this requires an additional modeling set and generally increases computational burden. This paper presents a comparison of these various methods in a number of power systems, showing algorithms initially in small test systems and scaling up to large, country-wide simulations. Overall, the research presents the trade-offs of various computational methods and illustrates how LDES may play an essential role in power systems of the future.

14 SOLAR ENERGY↗

Anomaly Detection in Power System State Estimation: Review and New Directions

Foundational and state-of-the-art anomaly-detection methods through power system state estimation are reviewed. Traditional components for bad data detection, such as chi-square testing, residual-based methods, and hypothesis testing, are discussed to explain the motivations for recent anomaly-detection methods given the increasing complexity of power grids, energy management systems, and cyber-threats. In particular, state estimation anomaly detection based on data-driven quickest-change detection and artificial intelligence are discussed, and directions for research are suggested with particular emphasis on considerations of the future smart grid.

42 ENGINEERING↗

Development of a Power Electronics-based Testbed for a Flexible Combined Heat and Power System

A flexible combined heat and power (F-CHP) concept, enabled by a power electronics-based power conditioning system (PCS), has been recently proposed as a cost-effective way for supporting the grid with high penetration of renewable energy sources. To verify the design, control, and performance of the overall system, a laboratory-scale testbed is essential. This paper focuses on the development of a power electronics-based testbed for such a F-CHP system. The developed testbed can test the control, grid-connected mode operation, islanded mode operation, and mode transitions, including planned/unplanned islanding and reconnection, of the F-CHP system. In the grid-connected mode, both the steady state and transients of the ac grid can be emulated, and various grid support functions can be tested with the help of the developed PCS converter. In the islanded mode, the external ac loads can also be supported by the F-CHP system. Also, the central controller, which is implemented in a NI CompactRIO, can be tested. Experimental test results for the grid-connected mode, islanded mode, and mode transitions are provided to validate the testbed design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Intelligently Partitioned Phasor-EMT Hybrid Simulations of Large-Scale, High-IBR Power Systems

As the penetration level of power electronics-interfaced renewables such as photovoltaics (PV) and wind has surged in modern electric grids, new operational risks caused by the dynamics of those inverter-based resources (IBRs) are emerging in parallel. Lessons learned from various grid events include that the impact of IBRs on system-level grid stability will become prominent along with the increase of renewables and that the short-timescale dynamic impacts of IBRs on grid stability are not fully captured by current commercial dynamic simulation tools [1] [2]. For example, IBRs can be controlled to mitigate those destabilizing interactions, but conventional phasor-domain tools (e.g. PSS/E, PSLF) often cannot capture that; likewise, the existing electromagnetic transient (EMT) simulation tools (e.g. PSCAD, EMTP) can simulate detailed IBR controls, but for large power systems with many IBRs, slow simulation speeds severely impede the ability to study dynamic events [3] [4]. Massively paralleling simulations using high-performance computing (HPC) can help address this, especially now that cloud-based HPC capability is widely available, but today s EMT tools are not HPC-compatible, and parallelization of dynamic simulation solvers is not trivial because each region can dynamically affect the others. Thus, dynamic simulation of grids with very large numbers of IBRs potentially poses a barrier to the ongoing energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modified Eigen-Decomposition-based Interval Analysis (MEDIA) for Power System Dynamic State Estimation

The Bayesian approach has been used for the dynamic state estimation (DSE) of a power system. However, due to the complexity of noise resources, it is difficult to quantify measurement and process noise using probability density functions (PDFs). To overcome the difficulty, the authors of this paper propose a modified eigen-decomposition-based interval analysis (MEDIA) method, which employs bounds instead of PDFs to quantify the noise, and uses the eigen decomposition method to reduce the negative impact of the overestimation problem. Using the simulation data generated from IEEE 16-machine and IEEE 10-machine systems, it is shown that the proposed MEDIA method can estimate the hard boundaries of dynamic states in real time. Furthermore, comparison with the forward-backward propagation method and the extended set-membership filter also shows that the proposed MEDIA method performs better by providing narrower boundaries in the DSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗