Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Gas-Grain Simulation Facility: Fundamental studies of particle formation and interactions. Volume 1: Executive summary and overview

An overview of the Gas-Grain Simulation Facility (GGSF) project and its current status is provided. The proceedings of the Gas-Grain Simulation Facility Experiments Workshop are recorded. The goal of the workshop was to define experiments for the GGSF--a small particle microgravity research facility. The workshop addressed the opportunity for performing, in Earth orbit, a wide variety of experiments that involve single small particles (grains) or clouds of particles. The first volume includes the executive summary, overview, scientific justification, history, and planned development of the Facility.

Fogleman, Guy↗

NASA Approach to HPCCP Support Software and Tools

The NASA HPCC Program, together with other agencies participating in the Federal HPCC Program, intends to advance technologies to enable the execution of grand challenge applications at sustained rates up to TeraFLOPS. During 1995-6 NASA undertook two major systems software efforts to improve the state of high performance support software and tools. The first of these activities was a replanning of support software and tools activities internal to the Agency. In replanning the software activities emphasis was placed on Meeting the needs of Grand Challenge Uses Few projects Near term useful results. The revised NASA plan calls for support software and tools activities in four areas: Application Creation Process Support Application Usage/Operations Support Advanced Support Software and Tools Concepts Metrics Based Monitoring and Management The second major activity undertaken was participation in a multiagency Task Force resulting from the Second Pasadena Workshop on System Software and Tools. The task force developed the Guidelines for Writing System Software and Tools Requirements for Parallel and Clustered Computers.

Blaylock, Bruce↗

DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

97 MATHEMATICS AND COMPUTING↗

Galileo spacecraft anomaly and safing recovery

A high-level anomaly recovery plan which identifies the steps necessary to recover from a spacecraft 'Safing' incident was developed for the Galileo spacecraft prior to launch. Since launch, a total of four in-flight anomalies have lead to entry into a system fault protection 'Safing' routine which has required the Galileo flight team to refine and execute the recovery plan. These failures have allowed the flight team to develop an efficient recovery process when permanent spacecraft capability degradation is minimal and the cause of the anomaly is quickly diagnosed. With this previous recovery experience and the very focused boundary conditions of a specific potential failure, a Gaspra asteroid recovery plan was designed to be implemented in as quickly as forty hours (desired goal). This paper documents the work performed above, however, the Galileo project remains challenged to develop a generic detailed recovery plan which can be implemented in a relatively short time to configure the spacecraft to a nominal state prior to future high priority mission objectives.

Basilio, Ralph R.↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center is supporting the development of high-efficiency power convertors for use in radioisotope power systems (RPS). Significant progress was made toward such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was canceled in 2013 by the U.S. Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton design. The technology development contracts each consist of up to three phases: design, fabrication, and test. As of May 2018, all contracts have completed the design phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification (IV and V) at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, Glenn is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects, which have similarities and relevance to current contract designs. Four of these are flexure-bearing based and another six are gas bearing based. One of the flexure-bearing convertors has accumulated over 110,000 h of operation and holds the current record for maintenance-free heat-engine run time. Another flexure-bearing convertor was recently manually shut down after 105,620 h of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of run time on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent a launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Among the gas-bearing convertors, the longest running unit has accumulated over 70,000 h of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously for which the longest run time has reached 28,000 h.

Oriti, Salvatore M.↗

Panel Session 3: Featured Country Canada: Management and Disposal of High and Low-Level Waste

This panel featured Senior Executives accountable for the safe management and disposal of most of Canada's radioactive waste liabilities and provided their perspectives on current plans and progress made to date. Topics addressed by the panelists included national policies and programs, the regulatory framework, and actions led by the waste generators and solution implementers to ensure Canada's waste legacy is responsibly managed. Presentations proposed include: 1 - Overview of Canadian Radioactive Waste Policy and Long-Term Waste Management Projects (Dave McCauley, Natural Resources Canada (Canada)); 2 - Featured Country: Canada - National Repository (Laurie Swami, Nuclear Waste Management Organization (Canada)); 3 - Management and Disposal of Ontario Power Generation's Low and Intermediate Level Waste (Lise Morton, Ontario Power Generation (Canada)); 4 - Featured Country: Canada - National Laboratories Liabilities (Richard Sexton, Atomic Energy of Canada Limited (Canada)); 5 - Management and Disposal of High and Low-Level Waste (Mark Lesinski, Canadian Nuclear Laboratories (Canada)); 6 - Disposal in Canada: The Regulatory Perspective (Ramzi Jammal, Canadian Nuclear Safety Commission (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Coal gasification systems engineering and analysis. Volume 1: Executive summary

Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

Source record↗

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

ATTRACTOR: Toward Trustworthy and Trusted Autonomous Systems

The question of what it means and what it takes for an autonomous system to consider another autonomous system justifiably trustworthy must be addressed by all who seek to integrate intelligent machine agents into real-world operations. A satisfactory answer to this question is an essential component in accepting autonomous machine decision-making in safety-critical and time-critical environments, such as aviation. Historically, simulation platforms for test and evaluation of complex systems have proven to be effective in assessing performance and contributing to decisions on the fitness of systems to operate in current general and commercial aviation airspace. Moreover, simulations have informed the definition of safety-critical constraints. However, as machine systems progressively take on responsibilities for decision-making traditionally supplied by humans, simulations require enhancement. Mixed reality simulation that integrates real-world platforms and data or high-fidelity simulation data in a sim-to-flight paradigm provides insight into agent interaction and the rationale behind autonomous agent decision-making as well as the capacity for seamless integrated implementation, testing, and operation of systems. Strong simulation capabilities are especially important in the presence of algorithms that hold great promise in decision-making yet increase the uncertainty in the system. Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) is a subproject of NASA’s Convergent Aeronautics Solutions (CAS) Project. ATTRACTOR’s objective is to build a basis for understanding trust and trustworthiness in multi-agent autonomous teams, and thus to inform future certification of safety-critical and time-critical autonomous systems in aviation. Because the concepts of trust and trustworthiness must be addressed in a context, ATTRACTOR has chosen Search and Rescue (SAR) in dynamic and unstructured environments, with emphasis on search, as its design reference mission (DRM). During dynamic planning and execution of trajectory-based operations, autonomous agents determine their trajectories given an assigned mission or missions and call for assistance from an appropriate teammate when needed. This experience along with the attendant human-machine and machine-machine interactions, serve as a platform for developing approaches to identifying and measuring trustworthiness and increasing trust. In this paper, we give an overview of some of ATTRACTOR’s research and development activities, findings, and ongoing work.

ATTRACTOR↗

Supervised Autonomous Assembly to Create and Evolve Persistent Assets

Supervised autonomous assembly (SAA) will create a paradigm shift in the planning and design of future persistent assets (PAs), both in near zero-g environments and on planetary surfaces. SAA refers to an autonomy approach that has the benefits of autonomous assembly as well as the benefits provided by a supervisor (operator) who is available to resolve unexpected situations. SAA provides both increased design freedom as well as reduced programmatic risk. SAA enables evolution of future PAs over decades as in-space operations transition from single purpose missions to creation of PAs, such as laboratories and experimental stations which more closely resembling terrestrial laboratories that can easily adapt and evolve to new missions leveraging repeated visits to the PA. The ability to evolve enables PAs to rapidly respond to changing objectives resulting from new questions as our understanding improves. A recently initiated National Aeronautics and Space Administration (NASA) project in the Space Technology Mission Directorate (STMD) Game Changing Development (GCD) Program called the Precision Assembled Space Structure (PASS), leverages the advantages of SAA to develop technologies that enable efficient creation and evolution of hexagonal topologies; both planar (example: fuel depots) and curved (examples: telescopes and shelters). PASS will be used to provide context for the philosophy and concepts discussed as well as the decision and selections made. PASS objectives are: a) Develop confidence in SAA and on-orbit servicing, assembly and manufacturing (OSAM) technologies by executing a test campaign that uses a path-to-flight autonomous precision assembly process directly applicable to future space telescopes. b) Test autonomous technologies including automated path planning and error recovery, to emphasize a robust approach that relies on generic robots and special purpose tools. c) Validate critical component models using a digital twin that includes the assembled primary mirror support structure and assembly process. A digital twin is a high-fidelity simulation of the asset capable of predicting the on-orbit performance. The paper concludes after identifying the critical need for a modest assembly flight experiment to validate and develop confidence in the SAA paradigm, thus accelerating adoption of the benefits described. SAA is a game changing paradigm that enhances the ability of an organization to infuse new technology through rapid evolution of PAs while leveraging OSAM technologies.

Structural Modeling↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Assess 2: Spacelab simulation. Executive summary

An Airborne Science/Spacelab Experiments System Simulation (ASSESS II) mission, was conducted with the CV-990 airborne laboratory in May 1977. The project studied the full range of Spacelab-type activities including management interactions, experiment selection and funding, hardware development, payload integration and checkout, mission specialist and payload specialist selection and training, mission control center payload operations control center arrangements and interactions, real time interaction during flight between principal investigators and the flight crew, and retrieval of scientific flight data. ESA established an integration and coordination center for the ESA portion of the payload as planned for Spacelab. A strongly realistic Spacelab mission was conducted on the CV-990 aircraft. U.S. and ESA scientific experiments were integrated into a payload and flown over a 10 day period, with the payload flight crew fully-confined to represent a Spacelab mission. Specific conclusions for Spacelab planning are presented along with a brief explanation of each.

Source record↗

Development and Deployment of NASA's Budget Execution Dashboard

This paper discusses the successful implementation of a highly visible company-wide management system and its potential to change managerial and accounting policies, processes and practices in support of organizational goals. Applying the conceptual framework of innovation in organizations, this paper describes the development and deployment process of the NASA Budget Execution Dashboard and the first two fiscal years of its use. It discusses the positive organizational changes triggered by the dashboard, like higher visibility of financial goals and variances between plans and actuals, increased involvement of all management levels in tracking and correcting of plan deviations, establishing comparable data standards across a strongly diversified organization, and enhanced communication between line organizations (NASA Centers) and product organizations (Mission Directorates). The paper also discusses the critical success factors experienced in this project: Strong leadership and division of management roles, rapid and responsive technology development, and frequent communication among stakeholders.

Putz, Peter↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Grey Zone Test Range Integrated Urban Simulation Environment

Sandia National Laboratories is part of the government test and evaluation team for the Defense Advanced Research Projects Agency Collection and Monitoring via Planning for Active Situational Scenarios program. The program is designed to better understand competition in the area between peace and conventional conflict when adversary actions are subtle and difficult to detect. For the purposes of test and evaluation, Sandia conducted a range of activities for the program: creation of the Grey Zone Test Range; design of the data stream for a user experiment conducted with U.S. Indo-Pacific Command; design, implementation, and execution of the formal evaluation; and analysis and summary of the evaluation results. This report details Sandia's activities and provides additional information on the Grey Zone Test Range urban simulation environment developed to evaluate the performer technologies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

FireWorks: a Dynamic Workflow System Designed for High-Throughput Applications

This work introduces FireWorks, a workflow software for running high-throughput calculation workflows at supercomputing centers. FireWorks has been used to complete over 50 million CPU-hours worth of computational chemistry and materials science calculations at the National Energy Research Supercomputing Center. It has been designed to serve the demanding high-throughput computing needs of these applications, with extensive support for (i) concurrent execution through job packing, (ii) failure detection and correction, (iii) provenance and reporting for long-running projects, (iv) automated duplicate detection, and (v) dynamic workflows (i.e., modifying the workflow graph during runtime). We have found that these features are highly relevant to enabling modern data-driven and high-throughput science applications, and we discuss our implementation strategy that rests on Python and NoSQL databases (MongoDB). Finally, we present performance data and limitations of our approach along with planned future work.

97 MATHEMATICS AND COMPUTING↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗