Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office

The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays for five D&NF missions. While none of the findings are new, the study underlines the importance of continued emphasis on sound project management techniques: a clean project management structure with a clear definition of roles and responsibilities across the various partners in a project, an understanding of institutional standards and procedures and any differences among the partners, and the critical need for a comprehensive IMS that can be used easily and routinely to identify potential threats to the critical path. The study also highlights the continuing need for realistic estimates of the total LCC. Sufficient time and resources must be allocated early in a project to ensure that the appropriate trade studies and analyses are performed across all aspects of a mission: spacecraft, ground system, operations concept, and fault management, to ensure that proposed and confirmed costs truly reflect the resource requirements over the entire mission life cycle. These studies need to include a realistic review of the assumptions underlying the use of new technologies, the integration of heritage and new hardware and software into the total mission environment, and any development and test savings based on heritage technology and lessons learned. Finally, the LCC Management Study stresses the need to listen to, carefully consider, and take positive action regarding the issues raised during reviews by the expert review teams.

Barley, Bryan↗

The Realities of Managing Complex Space Missions like the James Webb Space Telescope

An overview of the James Webb Space Telescope (JWST) project and its status are presented. The JWST is a deployable infrared telescope with a 6.5 meter diameter segmented, adjustable primary mirror. It has a cryogenic temperature telescope and instruments suited for infrared performance. It will be launched in 2013 on an European Space Agency-supplied Ariane 5 rocket 20 Sun-Earth L2 for a 5-year mission. Compared to other telescopes the JWST: has a 2.7 time longer diameter and 2.7 time longer wavelength capability than the Hubble Space Telescope (HST), 38 times increased sensitivity at K band and 8 times increased sensitivity at H band than the HST NICMOS; and, 8-24 times better angular resolution than the Spitzer. An instrument overview and integration and test flow overview are provided. The JWST project management approach, including organizational chart, program phases, technology status, and project critical path summary, are included. Additionally, project management tools and guidelines are are outlined.

Sabelhaus, Phil↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

CMI↗

Underground Test Area Project Waste Management Plan, Revision 3

This plan provides a general framework for all UGTA participants to follow for the characterization, torage/accumulation, treatment, and disposal of wastes generated by UGTA Sub-Project activities. The objective of this Waste Management (WM) Plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Those wastes generated will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NSO ERP waste minimization and pollution prevention objectives. Section 1.0 of this plan provides an introduction to the UGTA Sub-Project. Section 2.0 describes the responsibilities of UGTA participants. Section 3.0 describes UGTA Sub-Project activities, wastes expected to be produced from these activities, characterization requirements and parameters, and proper management and minimization of wastes. Section 4.0 contains a list of references. Attachment 1 to this plan is the Fluid Management Plan (FMP) and details specific strategies for management of fluids produced under UGTA operations.

54 ENVIRONMENTAL SCIENCES↗

Controls Request Tracker

Controls groups at large accelerators are routinely called upon to build and support controls for virtually all machine systems. While construction projects within the US DOE system are normally carefully planned and tracked by project management professionals, this support ends when construction milestones are met. However, once construction is complete, work continues as the group performs ongoing support and maintenance while also implementing requested system improvements and upgrades. With customers from virtually every accelerator and experiment group, the demands on the group often exceed the capacity of available resources. This type of diverse workload needs to be well organized and managed in order set proper priorities and ensure efficient use of resources. At SNS, we have collaborated with Cosylab to develop Controls Request Tracker (CRT), which is adapted from the Cosylab Project Manager (CPM) software. The resulting system not only provides standard request tracking features, but is interfaced to the SNS Logbook and work control system. This paper will discuss CRT and how we use it to manage the work of our controls group.

project management controls↗

RenewableNY - An Industrial Energy Conservation Initiative

The New York Industrial Retention Network (NYIRN) manages the RenewableNY program to assist industrial companies in New York City to implement energy efficiency projects. RenewableNY provides companies with project management assistance and grants to identify opportunities for energy savings and implement energy efficiency projects. The program helps companies identify energy efficient projects, complete an energy audit, and connect with energy contractors who install renewable energy and energy efficient equipment. It also provides grants to help cover the costs of installation for new systems and equipment. RenewableNY demonstrates that a small grant program that also provides project management assistance can incentivize companies to implement energy efficiency projects that might otherwise be avoided. Estimated savings through RenewableNY include 324,500 kWh saved through efficiency installations, 158 kW of solar energy systems installed, and 945 thm of gas avoided.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thanksgiving Hocus Pocus

I was managing the construction project, and I thought my biggest challenge was simply finishing the work in time for start of the holiday shopping season. The store opened three weeks before Thanksgiving. Everything looked great. Business picked up steadily as the serious spending season approached. Then, two days before Thanksgiving, disaster struck. The fire protection system was designed to prevent smoke and fire from reaching the merchandise. If a fire alarm went off anywhere in the building, the system went into a massive pressurization mode. Dampers would open and the system would pump in hundreds of cubic feet of air from outside into the store, pressurizing every square foot, preventing fire or smoke from spreading into the store. That night an unknown event tripped the alarm-and it sounded for six hours. The air conditioning system was still operational as the outside air temperatures had been warm all month. That night, however, temperatures plummeted to 20 degrees. With an alarm sounding in a building complex that covers many millions of square feet, no one paid attention to the cold air flowing into the space. Pipes froze and burst. Hundreds of gallons of water came down through the drywall, soaking merchandise, the carpet and the hardwood racks. This state of the art system, which had been designed to protect, was now responsible for unthinkable damage. You could be the among greatest project managers in world, but if you have an attitude and you give the client heartburn, unnecessary heartburn, you're not going to do more work with him. If you have a disaster like this one, and you manage to make everybody feel good and believe that you are going to take care of them, then everybody looks back on it and says, "You know what, this is a good project team; we work well together, so let's do another one."

Zazzali, Christian↗

The Faster, Better, Cheaper Approach to Space Missions: An Engineering Management Assessment

This paper describes, in viewgraph form, the faster, better, cheaper approach to space missions. The topics include: 1) What drives "Faster, Better, Cheaper"? 2) Why Space Programs are Costly; 3) Background; 4) Aerospace Project Management (Old Culture); 5) Aerospace Project Management (New Culture); 6) Scope of Analysis Limited to Engineering Management Culture; 7) Qualitative Analysis; 8) Some Basic Principles of the New Culture; 9) Cause and Effect; 10) "New Ways of Doing Business" Survey Results; 11) Quantitative Analysis; 12) Recent Space System Cost Trends; 13) Spacecraft Dry Weight Trend; 14) Complexity Factor Trends; 15) Cost Normalization; 16) Cost Normalization Algorithm; 17) Unnormalized Cost vs. Normalized Cost; and 18) Concluding Observations.

Hamaker, Joe↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Options of system integrated environment modelling in the predicated dynamic cyberspace

In this article there are briefly mentioned some selected options of contemporary conception of cybernetic system models in the corresponding and possible integratable environment with modern system dynamics thinking and all this in the cyberspace of possible projecting of predicted system characteristics. The key to new capabilities of system integration modelling in the considered cyberspace is mainly the ability to improve the environment and the system integration options, all this with the aim of modern control in the hierarchically arranged dynamic cyberspace, e.g. in the currently desired electronic business with information. The aim of this article is to assess generally the trends in the use of modern modelling methods considering the cybernetics applications verified in practice, modern concept of project management and also the potential integration of artificial intelligence in the new projecting and project management of integratable and intelligent models, e.g. with the optimal structures and adaptable behaviour.The article results from the solution of a specific research partial task at the faculty; especially the moments proving that the new economics will be based more and more on information, knowledge system defined cyberspace of modern management, are stressed in the text.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

2012 Annual Report Research Reactor Infrastructure Program

The Idaho National Laboratory (INL) manages and provides project management, technical support, quality engineering, quality inspection and nuclear material support for the Department of Energy (DOE) Research Reactor Infrastructure Program (RRI). This program provides fresh, unirradiated nuclear reactor fuel for United States domestic University Test, Research and Training Reactor Programs. The two fuel types fabricated for the program, plate fuel and Training, Research, Isotope Production, General Atomics (TRIGA) fuel are obtained through subcontracts with two fuel fabricators, Babcock and Wilcox Nuclear Operations Group (B&W) and TRIGA International (TI). Respectively, these subcontractors fabricate high and low enriched uranium aluminide, silicide and TRIGA fuel on a recurring basis. The program is also responsible for funding the return of the DOE-owned, irradiated nuclear fuel over the life of the program.

99 GENERAL AND MISCELLANEOUS↗

Taking learning to another level

As a technical project manager at Los Alamos National Laboratory, Scott Boise works on programs and projects that make a big impact. Although he spends most of his days in a quiet office, he also makes a big impact on his team. He's well-known for his character and integrity because of the way he develops leadership skills on the team, promotes respect for others and lives a commitment to learning. Scott joined the Lab in June 2021, the period of the COVID-19 pandemic when most new employees began their careers without ever having stepped foot on-site. That experience has continued to serve as a reminder to him that new employees face numerous challenges no matter how and when they start. He's made it his aim to do what he can to lift some of that load. Coming to the Lab from a career in the biomedical industry, Scott arrived with years of project management experience but without a deep understanding of nuclear operations. His dedication to continuous learning has helped him pursue experiential opportunities and ask the proper questions to understand his role.

99 GENERAL AND MISCELLANEOUS↗

Technical facilities catalog, volume II

This Technical Facilities Catalog has been developed in response to an increasing demand for general and specific information on NASA technical facilities. The Catalog is intended to: a)provide NASA management, facilities managers, program and project managers, individual research engineers and scientists, and other agencies of the Government with knowledge of existing NASA research, development, test and evaluation facilities and b)provide the reader with a basic concept of the capabilities and functions of the wide variety of NASA technical facilities and the technological areas they support.

Wind tunnel↗

Materials And Processes Technical Information System (MAPTIS) LDEF materials database

The Materials and Processes Technical Information System (MAPTIS) is a collection of materials data which was computerized and is available to engineers in the aerospace community involved in the design and development of spacecraft and related hardware. Consisting of various database segments, MAPTIS provides the user with information such as material properties, test data derived from tests specifically conducted for qualification of materials for use in space, verification and control, project management, material information, and various administrative requirements. A recent addition to the project management segment consists of materials data derived from the LDEF flight. This tremendous quantity of data consists of both pre-flight and post-flight data in such diverse areas as optical/thermal, mechanical and electrical properties, atomic concentration surface analysis data, as well as general data such as sample placement on the satellite, A-O flux, equivalent sun hours, etc. Each data point is referenced to the primary investigator(s) and the published paper from which the data was taken. The MAPTIS system is envisioned to become the central location for all LDEF materials data. This paper consists of multiple parts, comprising a general overview of the MAPTIS System and the types of data contained within, and the specific LDEF data element and the data contained in that segment.

Davis, John M.↗