Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

AmeriFlux FLUXNET-1F US-HB2 Hobcaw Barony Mature Longleaf Pine

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-HB2 Hobcaw Barony Mature Longleaf Pine. This is the FLUXNET version of the carbon flux data for the site US-HB2 Hobcaw Barony Mature Longleaf Pine produced by applying the standard ONEFlux (1F) software. Site Description - A mature longleaf pine forest that is periodically managed with fire

Forsythe, Jeremy D.↗

Synergy for a Strong Future FY 2008

Lawrence Livermore National Security, LLC is committed to delivering the best combination of scientific research, technology development, business management, and safe, secure operations in support of Lawrence Livermore National Laboratory's critical national security mission. LLNS was formed specifically to manage LLNL for the Department of Energy's National Nuclear Security Administration. LLNS consists of a team of five organizations renowned for their expertise and accomplishments throughout the U.S. nuclear weapons complex and beyond - Bechtel National, University of California, Babcock & Wilcox, Washington Division of URS Corporation, and Battelle. Bechtel is the nation's largest engineering and construction firm and a leader in project management. The University of California is the world's largest public research institution. Babcock & Wilcox and the Washington Division of URS Corporation are top nuclear facilities contractors and between them manage four of DOE's five safest sites. Battelle is a global leader in science and technology development and commercialization. The LLNS Board of Governors provides oversight for the management of the Laboratory and holds the Director and LLNS President responsible for the Laboratory's performance. The Board has seven standing committees that assist in assessing Laboratory performance and monitoring risks and internal controls. Through the Board of Governors, the Laboratory can reach back to LLNS partner organizations to help ensure that it fulfills its national security mission with excellence in scientific research, technology development, business management, and safe, secure operations. LLNS assumed management of LLNL on October 1, 2007. This report highlights LLNS accomplishments in FY2008, its first year as the Laboratory's managing contractor. It is clear that LLNS and the Laboratory have exploited numerous synergies inherent in their relationship - for example, science and engineering, mission and operations, LLNS partners and LLNL directorates - to notable success.

99 GENERAL AND MISCELLANEOUS↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AmeriFlux FLUXNET-1F US-xCL NEON LBJ National Grassland (CLBJ)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ). This is the FLUXNET version of the carbon flux data for the site US-xCL NEON LBJ National Grassland (CLBJ) produced by applying the standard ONEFlux (1F) software. Site Description - The LBJ Grasslands is 16,800 acres of land managed by the US Forest Service under the US Department of Agriculture. There is a rich legacy of land use, ranging back to the mid-19th century. Currently, LBJ Grasslands are used for recreation and hunting, livestock grazing, and fossil fuel extraction. Ongoing ecological monitoring is performed at the site, along with prescribed burning.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-Twt Twitchell Island

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Twt Twitchell Island. This is the FLUXNET version of the carbon flux data for the site US-Twt Twitchell Island produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Island site is a rice paddy that is owned by the state and managed by the California Department of Water Resources. While Bare Peat field was leveled for rice planting, the tower was installed on April 3, 2009. The rice paddy was converted from corn in 2007. In Summer 2009, Bispyribac-sodium and Pendimethalin herbicides were applied to the fields prior to rice planting and flooding, then pesticide and fertilizer application took place. Each year after rice is planted in the spring by drilling, the field is flooded. Then, the field is drained in early fall, rice is harvested, and the field site is moved.

Knox, Sara [University of California, Berkeley]↗

AmeriFlux FLUXNET-1F US-UTD UFLUX Dugout Ranch

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch. This is the FLUXNET version of the carbon flux data for the site US-UTD UFLUX Dugout Ranch produced by applying the standard ONEFlux (1F) software. Site Description - The station is located along a fence line between two fields that are managed indentically. The land manager plants an alfalfa mix crop and uses wheel line irrigation.

Inkenbrandt, Paul [Utah Geological Survey]↗

Mining Air for Fuels and Fine Chemicals

The Intergovernmental Panel on Climate Change’s 2021 report underscores that Direct Air Capture (DAC) is an essential component to limiting global warming to 2 °C, yet separating CO 2 from air and its subsequent concentration for conversion into carbon neutral fuels/chemicals or permanent storage remains energy intensive and costly. Further, most DAC technologies rely on repetitive capture and release cycles that reduces the amount of time the DAC materials are able to collect CO 2 and increases wear and tear. Moisture swing (MS) sorption within anion exchange materials utilizes differences in relative humidity to capture and concentrate CO 2 up to 500-fold with negligible energy inputs and low-cost sorbents. Molecular modeling predicts that membranes with a dry and wet side would actively transport CO 2 from its dry side to its wet side against a counter flow of H 2 O evaporating on the dry side, however, existing MS materials are too brittle to be processed into membranes to test this hypothesis. This project brought together experts in DAC materials and design, techno-economic analysis and project management at Arizona State University (ASU), polymer processing at University of Texas at Austin (UTA) and modeling gas transport and exchange at Norther Arizona University (NAU) to develop hollow fiber membranes that use energy from water evaporation to continuously pump CO 2 from air against a concentration gradient to the membranes interior and requiring significantly less energy than current DAC technologies. While this project did not meet its ultimate objectives of demonstrating an active CO 2 pumping membrane, a number of key accomplishments were made in developing low-cost, flexible anion exchange membranes (AEM) at 3.5 m 2 scale, characterizing the ionic and molecular transport within MS materials, and developing several analytical and mathematical models of the MS and pumping process leading to new fundamental knowledge about key rate limiting steps of CO 2 flux in anion exchange membranes at low water activity. Technoeconomic models show that if CO 2 fluxes ≥ 25 µmol CO 2 m -2 s -1 (membrane surface area) are achieved that cost ≤ $\$$100/tonne CO 2 captured, purified and compressed to pipeline quality is possible. The knowledge gained in this research will guide future research in developing new materials toward overcoming these rate limiting steps that in turn could enable transformative and disruptive DAC technologies needed for capturing gigatons of CO 2 per year needed to limiting global warming to 2 °C.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AmeriFlux FLUXNET-1F US-GLE GLEES

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-GLE GLEES. This is the FLUXNET version of the carbon flux data for the site US-GLE GLEES produced by applying the standard ONEFlux (1F) software. Site Description - The Glacier Lakes Ecosystem Experiments Site (GLEES) site is located on land owned by the U.S. government and managed by US Forest Service as part of the Medicine Bow National Forest. Many of the trees in the immediate vicinity of the site are older than 400 years, inter-dispersed among trees much younger in age. This widespread age distribution is most likely a derivation of one of two scenarios: 1) A widespread stand replacement about 400 years ago followed by a slow replacement; 2) Intermittent random disturbances over the past 400 years (Bradford et al. 2008). A decade long spruce beetle outbreak that peaked in 2008 resulted in the mortality of 85% of the forested basal area. There are a few private land holdings in the area, with scattered uncorked mining claims. Following the establishment of the National Forest, mining was banned and grazing was closed in the early 1990's in the upper portion of the GLEES site. Recreation in the winter, when snow can remain in patches into the summer months, snow mobiling and cross country skiing are popular. During the limited summer, hiking, camping and fishing are common activities. The site is accessible by vehicle only during the summer on Forest Road FDR 317, and in the winter, the tower is only reachable via snowmobile.

Frank, John↗

Greenbuilt Retrofit Test House Final Report

The Greenbuilt house, is an all-electric, 1980's era home in the eastern Sacramento suburb of Fair Oaks that was retrofit by Greenbuilt Construction as part of Sacramento Municipal Utility District's (SMUD) Energy Efficient Remodel Demonstration (EERD) Program. The project was a joint effort between the design-build team at Greenbuilt Construction, led by Jim Bayless, SMUD and their project manager Mike Keesee, and the National Renewable Energy Laboratory (NREL). The goal of the Energy Efficient Remodel Demonstration program is to work with local builders to renovate homes with cost-effective energy efficient retrofit measures. The homes remodeled under the EERD program are intended to showcase energy efficient retrofit options for homeowners and other builders. The Greenbuilt house is one of five EERD projects that NREL has supported. NREL's main role in these projects is to provide energy analysis and to monitor the home's performance after the retrofit to verify that the energy consumption is in line with the modeling predictions. NREL also performed detailed monitoring on the more innovative equipment included in these remodels, such as an add-on heat pump water heater.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Bosch in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AmeriFlux FLUXNET-1F US-Tw5 East Pond Wetland

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw5 East Pond Wetland. This is the FLUXNET version of the carbon flux data for the site US-Tw5 East Pond Wetland produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 6.5 acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 55 cm. The wetland remained fairly unvegetated in patches increasing in size towards the east. The site underwent a major disturbance in 2013 when the vegetation was removed to seed a nearby restored wetland. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on April 17, 2018.

Valach, Alex↗

AmeriFlux FLUXNET-1F CA-DSM Delta Salt Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-DSM Delta Salt Marsh. This is the FLUXNET version of the carbon flux data for the site CA-DSM Delta Salt Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal salt marsh on the eastern side of the Boundary Bay Wildlife Management Area (WMA) in Delta, British Columbia, Canada. This area is located on the southern front of the Fraser River. The total area of the Boundary Bay WMA is 11,470 ha, and the eastern part surrounding the flux tower accounts for 39 ha. This area is surrounded by farms and dikes. The Provincial Government purchased this area in 1974 limiting public access and designated it as WMA in 1995. This area has a mixed semidiurnal tidal cycle. The dominant species is Saltgrass (Distichlis spicata) with a canopy height of ~40 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on September 3, 2021.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F CA-RBM Richmond Brackish Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh. This is the FLUXNET version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal brackish marsh on the southern side of the Sturgeon Bank Wildlife Management Area (WMA) in Richmond, British Columbia, Canada. This area is situated within the estuary of the Fraser River. The total area of Sturgeon Bank WMA is 5,152 ha, of which the tidal marsh area is 205 ha. The southern of the WMA is characterized as a brackish marsh, which transitions to a salt marsh as you go north. Human development has influenced this area for almost 200 years. Human activities in this area began in the early 1800s, which included dredging, dyke and entrainment structures, agriculture, and other uses. The areas were designated as WMA in 1998. This area experiences a semidiurnal tidal cycle. The flux tower is located near the southern edge of the marsh, where the dominant species is cattail (Typha latifolia), with a canopy height of 160 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on June 1, 2022.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F US-Tw1 Twitchell Wetland West Pond

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond. This is the FLUXNET version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 7.4-acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 25 cm. The wetland was almost completely covered by cattails and tules by the third growing season. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on May 17, 2012.

Valach, Alex↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-xAE NEON Klemme Range Research Station (OAES)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES). This is the FLUXNET version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES) produced by applying the standard ONEFlux (1F) software. Site Description - The 1,560-acre Klemme Range Research Station is a grassland site managed for livestock grazing and pasture, located in the middle of the Rolling Red Plains Resource Area. The Rolling Red Plains extends from south of the Red River to north of the Oklahoma/Kansas border consisting of approximately 9.4 million acres, which occupies a significant portion of Western Oklahoma excluding the Oklahoma Panhandle.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-WPT Winous Point North Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-WPT Winous Point North Marsh. This is the FLUXNET version of the carbon flux data for the site US-WPT Winous Point North Marsh produced by applying the standard ONEFlux (1F) software. Site Description - The marsh site has been owned by the Winous Point Shooting Club since 1856 and has been managed by wildlife biologists since 1946. The hydrology of the marsh is relatively isolated by the surrounding dikes and drainages and only receives drainage from nearby croplands through three connecting ditches. Since 2001, the marsh has been managed to maintain year-round inundation with the lowest water levels in September. Within the 0–250 m fetch of the tower, the marsh comprises 42.9% of floating-leaved vegetation, 52.7% of emergent vegetation, and 4.4% of dike and upland during the growing season. Dominant emergent plants include narrow-leaved cattail (Typha angustifolia), rose mallow (Hibiscus moscheutos), and bur reed (Sparganium americanum). Common floating-leaved species are water lily (Nymphaea odorata) and American lotus (Nelumbo lutea) with foliage usually covering the water surface from late May to early October.

Chen, Jiquan↗

AmeriFlux FLUXNET-1F US-MN3 Morris: Corn-Soybean, Conventional Tillage

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage. This is the FLUXNET version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage produced by applying the standard ONEFlux (1F) software. Site Description - Cropland, 2-year rotation (corn-soybean), conventional (deep rip) tillage, uniform nutrient management, uniform pest management, tile drainage

Helseth, Christina [USDA-ARS LTAR]↗