Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Inventory Management Improvement Project

The Lawrence Livermore National Laboratory (LLNL) conducts research and development for the National Nuclear Security Agency (NNSA) and its affiliates. The Polymer AM team at LLNL conducts research and development in 3D printing, specifically direct-ink-write, in accordance with LLNL and NNSA missions. The team is composed of machine operators, chemists, testing engineers, and project engineers across multiple lab spaces with one shared storage area at LLNL. The operations use a variety of different consumables and hardware to conduct research applications for LLNL and NNSA. These items are critical to performing operation tasks; if an item is out of stock, operations associated with the respective item could be suspended for weeks. As such, the Polymer AM team manages an inventory of spare consumables and hardware to ensure these items are always available. However, the current management system, an excel sheet managed by the project engineer group, is not intuitive in providing inventory information despite the high labor utilization needed to maintain the system. As such, the team is looking to improve their inventory management that can send notifications regarding inventory needs, accessible to other team members, provide all relevant information to a specific item, and store historical information for budget and operation planning. The proposed solution is a Computer Maintenance Management System (CMMS): a web-based management software that stores inventory information and provides automated notifications. The system will store information on each item including quantity in stock, technical information, supplier information, costs, lead times, and expiration date. The system has a notifications function that can send notifications to the respective team member’s when an item needs to be counted, item inventory is low, or an item is approaching their expiration date. Information for each item can be tracked over time creating data to be used for budget planning and process improvement purposes. Due to its web-based source, the system can be accessed by the respective team member viewing technical information, quantity, and purchasing information.

42 ENGINEERING↗

The WISE Satellite Development: Managing the Risks and the Opportunities

NASA's Wide-field Infrared Survey Explorer (WISE) MIDEX mission is surveying the entire sky in four infrared bands from 3.4 to 22 micrometers. The WISE instrument consists of a 40 cm telescope, a solid hydrogen cryostat, a scan mirror mechanism, and four 1K x1K infrared detectors. The WISE spacecraft bus provides communication, data handling, and avionics including instrument pointing. A Delta 7920 successfully launched WISE into a Sun-synchronous polar orbit on December 14, 2009. WISE was competitively selected by NASA as a Medium cost Explorer mission (MIDEX) in 2002. MIDEX missions are led by the Principal Investigator who delegates day-to-day management to the Project Manager. Given the tight cost cap and relatively short development schedule, NASA chose to extend the development period one year with an option to cancel the mission if certain criteria were not met. To meet this and other challenges, the WISE management team had to learn to work seamlessly across institutional lines and to recognize risks and opportunities in order to develop the flight hardware within the project resources. In spite of significant technical issues, the WISE satellite was delivered on budget and on schedule. This paper describes our management approach and risk posture, technical issues, and critical decisions made.

Risk Management↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office

The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays for five D&NF missions. While none of the findings are new, the study underlines the importance of continued emphasis on sound project management techniques: a clean project management structure with a clear definition of roles and responsibilities across the various partners in a project, an understanding of institutional standards and procedures and any differences among the partners, and the critical need for a comprehensive IMS that can be used easily and routinely to identify potential threats to the critical path. The study also highlights the continuing need for realistic estimates of the total LCC. Sufficient time and resources must be allocated early in a project to ensure that the appropriate trade studies and analyses are performed across all aspects of a mission: spacecraft, ground system, operations concept, and fault management, to ensure that proposed and confirmed costs truly reflect the resource requirements over the entire mission life cycle. These studies need to include a realistic review of the assumptions underlying the use of new technologies, the integration of heritage and new hardware and software into the total mission environment, and any development and test savings based on heritage technology and lessons learned. Finally, the LCC Management Study stresses the need to listen to, carefully consider, and take positive action regarding the issues raised during reviews by the expert review teams.

Barley, Bryan↗

The Realities of Managing Complex Space Missions like the James Webb Space Telescope

An overview of the James Webb Space Telescope (JWST) project and its status are presented. The JWST is a deployable infrared telescope with a 6.5 meter diameter segmented, adjustable primary mirror. It has a cryogenic temperature telescope and instruments suited for infrared performance. It will be launched in 2013 on an European Space Agency-supplied Ariane 5 rocket 20 Sun-Earth L2 for a 5-year mission. Compared to other telescopes the JWST: has a 2.7 time longer diameter and 2.7 time longer wavelength capability than the Hubble Space Telescope (HST), 38 times increased sensitivity at K band and 8 times increased sensitivity at H band than the HST NICMOS; and, 8-24 times better angular resolution than the Spitzer. An instrument overview and integration and test flow overview are provided. The JWST project management approach, including organizational chart, program phases, technology status, and project critical path summary, are included. Additionally, project management tools and guidelines are are outlined.

Sabelhaus, Phil↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

CMI↗

Underground Test Area Project Waste Management Plan, Revision 3

This plan provides a general framework for all UGTA participants to follow for the characterization, torage/accumulation, treatment, and disposal of wastes generated by UGTA Sub-Project activities. The objective of this Waste Management (WM) Plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Those wastes generated will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NSO ERP waste minimization and pollution prevention objectives. Section 1.0 of this plan provides an introduction to the UGTA Sub-Project. Section 2.0 describes the responsibilities of UGTA participants. Section 3.0 describes UGTA Sub-Project activities, wastes expected to be produced from these activities, characterization requirements and parameters, and proper management and minimization of wastes. Section 4.0 contains a list of references. Attachment 1 to this plan is the Fluid Management Plan (FMP) and details specific strategies for management of fluids produced under UGTA operations.

54 ENVIRONMENTAL SCIENCES↗

Controls Request Tracker

Controls groups at large accelerators are routinely called upon to build and support controls for virtually all machine systems. While construction projects within the US DOE system are normally carefully planned and tracked by project management professionals, this support ends when construction milestones are met. However, once construction is complete, work continues as the group performs ongoing support and maintenance while also implementing requested system improvements and upgrades. With customers from virtually every accelerator and experiment group, the demands on the group often exceed the capacity of available resources. This type of diverse workload needs to be well organized and managed in order set proper priorities and ensure efficient use of resources. At SNS, we have collaborated with Cosylab to develop Controls Request Tracker (CRT), which is adapted from the Cosylab Project Manager (CPM) software. The resulting system not only provides standard request tracking features, but is interfaced to the SNS Logbook and work control system. This paper will discuss CRT and how we use it to manage the work of our controls group.

project management controls↗

RenewableNY - An Industrial Energy Conservation Initiative

The New York Industrial Retention Network (NYIRN) manages the RenewableNY program to assist industrial companies in New York City to implement energy efficiency projects. RenewableNY provides companies with project management assistance and grants to identify opportunities for energy savings and implement energy efficiency projects. The program helps companies identify energy efficient projects, complete an energy audit, and connect with energy contractors who install renewable energy and energy efficient equipment. It also provides grants to help cover the costs of installation for new systems and equipment. RenewableNY demonstrates that a small grant program that also provides project management assistance can incentivize companies to implement energy efficiency projects that might otherwise be avoided. Estimated savings through RenewableNY include 324,500 kWh saved through efficiency installations, 158 kW of solar energy systems installed, and 945 thm of gas avoided.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thanksgiving Hocus Pocus

I was managing the construction project, and I thought my biggest challenge was simply finishing the work in time for start of the holiday shopping season. The store opened three weeks before Thanksgiving. Everything looked great. Business picked up steadily as the serious spending season approached. Then, two days before Thanksgiving, disaster struck. The fire protection system was designed to prevent smoke and fire from reaching the merchandise. If a fire alarm went off anywhere in the building, the system went into a massive pressurization mode. Dampers would open and the system would pump in hundreds of cubic feet of air from outside into the store, pressurizing every square foot, preventing fire or smoke from spreading into the store. That night an unknown event tripped the alarm-and it sounded for six hours. The air conditioning system was still operational as the outside air temperatures had been warm all month. That night, however, temperatures plummeted to 20 degrees. With an alarm sounding in a building complex that covers many millions of square feet, no one paid attention to the cold air flowing into the space. Pipes froze and burst. Hundreds of gallons of water came down through the drywall, soaking merchandise, the carpet and the hardwood racks. This state of the art system, which had been designed to protect, was now responsible for unthinkable damage. You could be the among greatest project managers in world, but if you have an attitude and you give the client heartburn, unnecessary heartburn, you're not going to do more work with him. If you have a disaster like this one, and you manage to make everybody feel good and believe that you are going to take care of them, then everybody looks back on it and says, "You know what, this is a good project team; we work well together, so let's do another one."

Zazzali, Christian↗

The Faster, Better, Cheaper Approach to Space Missions: An Engineering Management Assessment

This paper describes, in viewgraph form, the faster, better, cheaper approach to space missions. The topics include: 1) What drives "Faster, Better, Cheaper"? 2) Why Space Programs are Costly; 3) Background; 4) Aerospace Project Management (Old Culture); 5) Aerospace Project Management (New Culture); 6) Scope of Analysis Limited to Engineering Management Culture; 7) Qualitative Analysis; 8) Some Basic Principles of the New Culture; 9) Cause and Effect; 10) "New Ways of Doing Business" Survey Results; 11) Quantitative Analysis; 12) Recent Space System Cost Trends; 13) Spacecraft Dry Weight Trend; 14) Complexity Factor Trends; 15) Cost Normalization; 16) Cost Normalization Algorithm; 17) Unnormalized Cost vs. Normalized Cost; and 18) Concluding Observations.

Hamaker, Joe↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

Facilitation of the Estuary/Ocean Subgroup for Research, Monitoring and Evaluation - FY07 Annual Report.

This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.

13 HYDRO ENERGY↗

Facilitation of the Estuary/Ocean Subgroup for Research, Monitoring, and Evaluation, FY07 Annual Report

This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗