Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Study on the Strategy for Final Disposal and Reuse of Decontamination Wastes after the Fukushima Daiichi NPP Accident - 20426

After the Fukushima Daiichi NPP accident, a large area of East Japan was contaminated by radio-Cs. To discuss the final disposal of the contaminated wastes off-site and the required development of related technologies, it is important to understand the volume and radiation concentration of the wastes after various treatments. For a scientific investigation purpose, a research committee has been formed by the Society for the Remediation of Radioactive Contamination in the Environment, which is independent from the Ministry of Environment. This committee's work is focused on discussing various scenarios for the final disposal considering a mass balance evaluation of the entire process, economic evaluations, and stakeholder consultation for final consensus. The current discussions of this committee are herein reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Monte Carlo characterization of the cosmic ray muon flux in shallow subsurface geological repositories intended for disposal of radioactive materials

Recent challenges in monitoring subsurface geological repositories intended for disposal of radioactive materials such as spent nuclear fuel call for new, innovative concepts that are facility independent, cost-effective, passive, and reliable. Once nuclear material is in place at these facilities, reverifying the inventory may no longer be feasible if continuity of knowledge is lost or unavailable to the inspectors. Using cosmic ray muons may present several potential advantages over conventional photon/neutron signatures, and their use in safeguards applications have only received attention in the past decade. However, there have been limited efforts to explore the integration of cosmic ray muons into repository safeguards and study potential gains, risks, and costs. This paper presents a Monte Carlo-based methodology to characterize the cosmic ray muon flux, including muon angular and energy differential distributions at depths representative of subsurface geological repositories. Since there have been limited measurements at these sites and a measurement made in one site is not always transferable to another site, the objective is to develop an efficient simulation method and useful parametrizations to provide a convenient tool for enabling muon simulations at any geological repository site. It is expected these results will provide a better understanding of how muons can be integrated into an existing geological repository safeguards framework.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Active-Site Determination and Mechanistic Insights in a MOF-Supported Polymerization Catalyst

The structural elucidation of catalyst active sites in heterogeneous catalysts when supported by traditional metal oxides remains a challenge despite the advanced characterization techniques that have been developed. The catalyst-deposition-site nonuniformity in metal oxides inhibits clear structural characterization through bulk spectroscopic methods and rules out the use of single-crystal X-ray diffraction. However, for metal-organic framework (MOF)-supported catalysts, the crystallinity and uniform structures of the underlying support enhance our ability to identify the precatalyst and catalytically active sites and open the door to using single-crystal X-ray diffraction coupled with spectroscopy under reaction conditions. Additionally, the use of in situ X-ray absorption spectroscopy identifies the catalytically active site in diethylaluminum chloride (DEAC)-pretreated Cr-SIM-NU-1000 to be a Cr-ethyl when used for ethylene polymerization. Further kinetic experiments elucidate the effects of ethylene pressure, temperature, catalyst loading, and cocatalyst loading, furthering mechanistic knowledge and helping to deconvolute the structure-function relationship.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Schema Elements for Granta Annual Report

Granta: Materials Intelligence, also known as Granta:MI or Granta, is a commercial database software by Ansys, Inc. that is utilized by the Nuclear Security Enterprise (NSE) to organize and store materials data relevant to the complex. The software was first adopted by individual sites in the early 2000’s, but in FY20, enterprise-wide licensing was purchased for the NSE by the Product Realization Integrated Digital Enterprise (PRIDE) program. Currently, there are 375 floating licenses available for users at all sites. There are also two shared instances of Granta; a classified production instance on the Enterprise Secure Network (ESN) and an unclassified development instance. Additionally, some individual sites such as Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories (SNL), Kansas City National Security Campus (KCNSC), and Savannah River National Laboratory (SRNL) host their own local Granta instances on their own networks that, in general, only their employees can access.

36 MATERIALS SCIENCE↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

NEONiso R Package, versions greater than 0.5.2

Carbon fluxes in terrestrial ecosystems and their response to environmental change are a major source of uncertainty in the modern carbon cycle. The National Ecological Observatory Network (NEON) presents the opportunity to merge eddy covariance (EC)-derived fluxes with CO2 isotope ratio measurements to gain insights into carbon cycle processes. Collected continuously and consistently across >40 sites, NEON EC and isotope data facilitate novel integrative analyses. However, currently provisioned atmospheric isotope data are uncalibrated, greatly limiting ability to perform cross-site analyses. Here, we present two approaches to calibrating NEON CO2 isotope ratios, along with an R package to calibrate NEON data. We find that calibrating CO2 isotopologues independently yields a lower d13C bias (<0.05‰) and higher precision (<0.40‰) than directly correcting d13C with linear regression (bias: <0.11‰, precision: 0.42‰), but with slightly higher error and lower precision in calibrated CO2 mole fraction. The magnitude of the corrections to d13C and CO2 mole fractions vary substantially by site, underscoring the need for users to apply a consistent calibration framework to data in the NEON archive. Post-calibration data sets show that site mean annual d13C correlates negatively with precipitation, temperature, and aridity, but positively with elevation. Forested and agricultural ecosystems exhibit larger gradients in CO2 and d13C than other sites, particularly during the summer and at night. The overview and analysis tools developed here will facilitate cross-site analysis using NEON data, provide a model for other continental-scale observational networks, and enable new advances leveraging the isotope ratios of specific carbon fluxes.

Fiorella, Richard↗

Tracking and Positioning System for Floating Solar (CRADA Abstract)

The project goal is to develop a floating solar photovoltaics (FPV) tracking & position system that: (1) increases annual energy production of FPV projects by >10%, (2) lowers levelized cost of energy (LCOE) for FPV by >10%, and (3) leverages U.S. contract supply chain & manufacturing. The outcome of the project will be a certified tracking product that has undergone extensive field testing and is ready for commercial sales. The primary objectives for each budget period are: • BP1: Define product requirements, develop initial controls architecture and design other sub-components, complete small-scale pilot testing, install a larger-scale pilot, secure sites for commercial pilots, and develop the beta-version of a user portal. • BP2: complete control system and sub-component design, successful demonstration and testing at a commercial pilot, certification & bankability, finalize user portal, and complete various commercialization activities related to supply chain, customer acquisition, and sales. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. This effort represents PNNL’s first opportunity to support the floating solar photovoltaics (FPV) industry with capabilities, facilities, and personnel developed to contribute to the marine energy (e.g., wave and tidal energy) sector. This portfolio expansion leverages internal and DOE EERE investments and the growing visibility of PNNL-Sequim’s Marine and Coastal Research Laboratory (MCRL) and our marine research capabilities, in general. The development of effective and low-cost FPV platforms is a potential way to increase the nation’s set of tools for providing emission-free electricity without utilizing valuable terrestrial resources. Successful commercialization of such a project may lead to economic benefits through job creation, supply chain creation, and access to a cheaper source of electricity.

14 SOLAR ENERGY↗

Dual active site tandem catalysis of metal hydroxyl oxides and single atoms for boosting oxygen evolution reaction

We report the high voltage in oxygen evolution reaction (OER) often causes structural change in electrocatalysts and forms multiple active sites. Therefore, exploring the synergy of various active sites is extremely significant to develop catalysts for OER with multiple elementary steps. Herein, we adopt the physically adsorbed metal ions method to successfully synthesize a highly-efficient electrocatalyst containing the dual active sites of Fe-NiOOH and NiC4 single atoms (marked as Ni SAs/Fe-NiOOH). The Ni SAs/Fe-NiOOH displays outstanding OER performance with an overpotential of 269 mV to deliver current density of 10 mA/cm 2 that shows 55 mV superior to commercial IrO 2 /CB at the same condition. Experiments and density functional theory calculations indicate that the excellent OER activity of Ni SAs/Fe-NiOOH catalyst is attributed to the synergy of dual active sites of NiC 4 SAs and Fe-NiOOH. A tandem catalysis mechanism is also proposed to reveal the synergism of two active centers, which makes the potential-determining step more facile and accordingly decreases the OER overpotential. This work offers a new concept of tandem catalysis to develop the electrocatalysts with many elemental steps, like OER and oxygen reduction reaction catalysts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Developing a Lightning All-Clear Signal for the Savannah River Site

Lightning safety is a major concern at the Savannah River Site (SRS). Notifications are provided when 3-strikes occur onsite within a 15-minute period. It is generally left up to individual contractors at SRS to determine when it is safe for workers to return to outside work, generally following a 3-hour period of no lightning, after the last lightning strike occurs. This work tries to improve safe return to work decisions by developing a reliable all-clear signal using an electric field mill. The best signal used thresholds from multiple electric field values to provide an average delay for return to work of 2 hours and 13 minutes. This average was heavily influenced by lingering storms in the area or missing data from power or network outages. One event out of 98 signaled the all-clear prior to another event occurring less than 60 minutes later. Regardless, 62% of the all clear signals had delay times less than the mean and 72% had delay times less than the current 3-hour delay after the last strike. This provides better worker safety for returning to work than 30 minutes after the last lightning strike (e.g. OSHA Lightning Safety) and improves the delay time from the current 3-hour delay.

Noble, Stephen [Savannah River National Laboratory↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renormalized site density functional theory for models of ion hydration

Development of accurate statistical mechanics models of molecular liquid systems is a problem of great practical and fundamental importance. Site-density functional theory (SDFT) is one of the promising directions in this area, but its success hinges upon the ability to efficiently reconcile co-existence of two distinct intra- and inter-molecular interaction regimes in a molecular liquid. Renormalized formulation of site-density functional theory (RSDFT), that we have recently developed, resolves this problem by introducing an additional potential field variable that decouples two interaction scales and maps the molecular liquid problem onto the effective simple liquid mixture. This work provides a critical assessment of RSDFT for the hydrated ion system - a problem, which historically has always been one of the most difficult cases for SDFT applications. Using two-site model of water, we perform a comprehensive analysis of hydrated alkali metal and halogen ions, including both structural and free energy based characteristics. The results indicate that RSDFT provides a significant improvement over conventional 3D-RISM implementations, and may prove useful in coarse grained simulations based on two-site solvent models.

Chuev, Gennady N.↗

Methanol tolerance of atomically dispersed single metal site catalysts: mechanistic understanding and high-performance direct methanol fuel cells

Proton-exchange membrane fuel cells (PEMFCs) and direct methanol fuel cells (DMFCs) are promising power sources from portable electronic devices to vehicles. The high-cost issue of these low-temperature fuel cells can be primarily addressed by using platinum-group metal (PGM)-free oxygen reduction reaction (ORR) catalysts, in particular atomically dispersed metal–nitrogen–carbon (M–N–C, M = Fe, Co, Mn). Furthermore, a significant advantage of M–N–C catalysts is their superior methanol tolerance over Pt, which can mitigate the methanol cross-over effect and offer great potential of using a higher concentration of methanol in DMFCs. In this work, we investigated the ORR catalytic properties of M–N–C catalysts in methanol-containing acidic electrolytes via experiments and density functional theory (DFT) calculations. FeN 4 sites demonstrated the highest methanol tolerance ability when compared to metal-free pyridinic N, CoN 4 , and MnN 4 active sites. The methanol adsorption on MN 4 sites is even strengthened when electrode potentials are applied during the ORR. The negative influence of methanol adsorption becomes significant for methanol concentrations higher than 2.0 M. However, the methanol adsorption does not affect the 4e - ORR pathway or chemically destroy the FeN 4 sites. The understanding of the methanol-induced ORR activity loss guides the design of promising M–N–C cathode catalyst in DMFCs. Accordingly, we developed a dual-metal site Fe/Co–N–C catalyst through a combined chemical-doping and adsorption strategy. Instead of generating a possible synergistic effect, the introduced Co atoms in the first doping step act as “scissors” for Zn removal in metal–organic frameworks (MOFs), which is crucial for modifying the porosity of the catalyst and providing more defects for stabilizing the active FeN 4 sites generated in the second adsorption step. The Fe/Co–N–C catalyst significantly improved the ORR catalytic activity and delivered remarkably enhanced peak power densities (i.e., 502 and 135 mW cm -2 ) under H 2 –air and methanol–air conditions, respectively, representing the best performance for both types of fuel cells. Notably, the fundamental understanding of methanol tolerance, along with the encouraging DMFC performance, will open an avenue for the potential application of atomically dispersed M–N–C catalysts in other direct alcohol or ammonia fuel cells.

25 ENERGY STORAGE↗

GDSA Framework Development and Process Model Integration FY2022

The Spent Fuel and Waste Science and Technology (SFWST) Campaign of the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Office of Spent Fuel & Waste Disposition (SFWD) is conducting research and development (R&D) on geologic disposal of spent nuclear fuel (SNF) and high-level nuclear waste (HLW). A high priority for SFWST disposal R&D is disposal system modeling (Sassani et al. 2021). The SFWST Geologic Disposal Safety Assessment (GDSA) work package is charged with developing a disposal system modeling and analysis capability for evaluating generic disposal system performance for nuclear waste in geologic media. This report describes fiscal year (FY) 2022 advances of the Geologic Disposal Safety Assessment (GDSA) performance assessment (PA) development groups of the SFWST Campaign. The common mission of these groups is to develop a geologic disposal system modeling capability for nuclear waste that can be used to assess probabilistically the performance of generic disposal options and generic sites. The modeling capability under development is called GDSA Framework (pa.sandia.gov). GDSA Framework is a coordinated set of codes and databases designed for probabilistically simulating the release and transport of disposed radionuclides from a repository to the biosphere for post-closure performance assessment. Primary components of GDSA Framework include PFLOTRAN to simulate the major features, events, and processes (FEPs) over time, Dakota to propagate uncertainty and analyze sensitivities, meshing codes to define the domain, and various other software for rendering properties, processing data, and visualizing results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NDA Systems Deployed at the Savannah River Site

SRNL’s Nuclear Measurements group develops and implements equipment, methods, and techniques to rapidly provide answers to challenging measurement questions in the areas of: • Environmental Monitoring • Legacy Waste Cleanup • Defense Material •Surplus Defense Material • Customers want: • Good, Fast, Cheap –pick three • Simple

Whiteside, Tad↗

Accelerating Hanford Site Cleanup through Operations Research Modeling - 20238

The Hanford Site cleanup effort will require the integration of dozens of unique facilities and processes, many of which will be first-of-a-kind in implementation and design. Each facility will be governed by its own set of operating logic, configured with a unique array of unit operations, and subject to a set of constraints that will affect its behavior. The collection of facilities have multiple points of interface, making the operations of any one facility potentially significant to the operations of other up- or downstream processes. It is therefore highly desirable to accurately predict these operations, as it allows for Site officials to identify and preempt bottlenecks and vulnerabilities before they unexpectedly inhibit the cleanup mission. With the quantity and complexity of the processes that will be on Site, building a pen-and-paper or even a spreadsheet-assisted model of the cleanup mission quickly becomes overwhelming in scope and inaccurate in execution. The Engineering organization for the Site's Tank Operations Contract (TOC) has therefore implemented the use of operations research (OR) modeling to simulate and predict future operations of Site facilities. These models are created using a discrete event simulation tool that allows for the development of detailed, versatile, and robust models. Not only can these models account for complex logical behaviors, but they can also simulate process details down to the level of vessel sizing, labor utilization, equipment reliability, and resource availability. To date, the TOC has developed OR models for several facilities on Site, including for single-shell tank (SST) farms, double-shell tank (DST) farms, the Effluent Treatment Facility (ETF), and the waste transfer system. These models have focused on identifying bottlenecks and operational constraints, and have been used to quantify the effects of implementing process changes. This latter point is particularly valuable, as it allows for several alternatives to be studied in a virtual setting before committing resources to making a change in the field. The decision to develop OR models has gained tremendous support from the Site's stakeholders and the U.S. Department of Energy (DOE) management, and has prompted the use of the tool to support additional internal and external initiatives. Recently, an initiative was proposed to use the models to help identify and provide quantitative backing for risks and opportunities for the TOC. This application of OR could not only help inform how the TOC manages its risks (e.g. quantities and types of spare parts), but could also help drive process improvements whose benefits might otherwise be hard to quantify. The models have also been used to drive the TOC's cloud computing, artificial intelligence (AI), and machine learning (ML) initiatives. These initiatives will not only improve the ability of the TOC to more rapidly respond to the needs of its customers, but it will also aid in the ability of the TOC to analyze and improve the processes it studies. Partnership with two external software development and consulting companies (Lanner and Ynformed) has furthered not only the application of AI and ML within the TOC, but has also spurred the development of new/improved software tools and platforms used by the companies. These partnerships have proven to be mutually beneficial and productive, and have set a precedent for the types of gains that can be made by exploring such options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗