Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

TriTruss Strut-to-Joint Bond Test: Analysis and Setup

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an in-space assembled telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads and instruments, all of which require them to have robust structural integrity. Structural proof tests are needed to ensure the integrity of the bonded interface between the joint and structural struts that make up a TriTruss module. For the first phase of the analysis and test setup effort, described in this paper, a series of analyses were performed to determine the optimal setup for applying a single set of loads to a module to verify the integrity of the bonds. This paper describes all the test setup configurations and loads considered and summarizes the final set of loading states that were selected for proof testing each module.

TriTruss↗

Testing of Bonds in a TriTruss Module

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an in-space assembled telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have robust structural integrity. Structural proof tests are needed to ensure the integrity of the bonded interface between the joint and struts that make up a TriTruss module. The test setup configurations and loads to be applied to the TriTruss module will be described in this paper. Also, the results obtained from tests will be summarized, including a comparison with analytical results.

TriTruss, Finite Element Analysis, Testing, Design↗

Elastic Modulus Testing for TriTruss Struts

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss and primary mirror backbone support structure of an in-space assembled telescope(iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have robust structural integrity. An accurate elastic modulus value is crucial to the finite element analysis(FEA) of the structure. Initial testing indicated that the equivalent elastic modulus provided by the manufacturer and used in the analyses did not accurately predict the behavior of the structure. In this paper, the in-house testing method developed at LaRC to accurately measure the equivalent elastic modulus of the composite struts for use in the analyses is described. A tensile and compressive equivalent elastic modulus was computed from the data obtained in this test. The testing resulted in a tensile equivalent elastic modulus of 24.6 Msi (standard deviation of 0.888 Msi) or 169 GPa (standard deviation of 6.20 GPa) and a compressive equivalent elastic modulus of 22.8 Msi (standard deviation of 0.780 Msi) or 157 GPa(standard deviation of 5.38 GPa) for the single wall thickness struts. For double wall thickness struts, the testing resulted in a tensile equivalent elastic modulus of32.1 Msi (standard deviation of 1.003 Msi) or 221 GPa (standard deviation of 6.91GPa) and a compressive equivalent elastic modulus of 31.9 Msi (standard deviation of 1.123) or 220 GPa (standard deviation of 7.74 GPa).1

TriTruss↗

Structural Characterization of a TriTruss Module

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large support structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an In-Space Assembled Telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have a high stiffness. Structural characterization from testing and analysis is needed to ensure the integrity of the struts that make up a TriTruss module is maintained when subjected to loads representative of the application. The test setup and loads applied to the TriTruss module as well as the analytical methods used to predict the response of the structure under conditions representative of those implemented during testing will be discussed. Also, the results obtained from testing and analysis will be summarized. The goal for the characterization study was to achieve a correlation within 10% between the test data and the analysis. Overall, the correlation varied for the struts with a few struts still having a larger error margin after further studies were conducted to improve the correlation through additional analysis.

Characterization↗

The assembly of large structures in space

Techniques developed for orbital assembly of the support structure for a 1000 meter diameter microwave power transmission system antenna are described. The operation is performed in two phases using the shuttle remote manipulator system in low earth orbit, and a mobile assembler in geosynchronous orbit.

Smith, G. W.↗

Assembly and integration of the Space Station Freedom ECLSS

The assembly and integration of the SSF elements and systems throughout the build-up sequence are addressed focusing on ECLSS hardware interfaces and stage performance. The ECLSS encompasses six subsystems which provide temperature and humidity control, atmospheric control and supply, atmospheric revitalization, water recovery and management, waste management, and the fire detection and protection.

Gould, M. J.↗

Shuttle demonstration of large space structure fabrication and assembly

This paper describes a program aimed at the early on-orbit demonstration of a large-space-structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform earth-observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the remote manipulator system and two astroworkers in an EVA mode. Results of the platform preliminary design are presented in terms of a design layout with related structural, thermal, mass-properties, and control-dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.

Fleisig, R.↗

Space Telescope optical telescope assembly

The optical quality and stability requirements of the Space Telescope optical design rely on state-of-the-art developments in optics, structures, and sensors. This paper describes key elements of the design implementation of the Space Telescope's performance requirements.

Mccarthy, D. J.↗

Assessment of mixed fleet potential for space station launch and assembly

Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns about the ability of available launch capacity to meet both payload-to-orbit and crew rotation requirements for the Space Station. In addition, it is believed that some phases of Station build-up could be expedited using unmanned launch systems with significantly greater lift capacity than the STS. Examined is the potential use of expendable launch vehicles (ELVs), yet-to-be-developed unmanned shuttle-derived vehicles (SDVs), and international launch vehicles for meeting overall launch requirements to meet Space Station program objectives as defined by the 1986 Critical Evaluation Task Force (CETF). The study concludes that use of non-STS transportation can help meet several important program objectives as well as reduce the total number of STS flights. It also finds, however, that reduction of Space Station-dedicated STS flights below 8 per year forces a reduction in Station crew size assuming the CETF 90 day crew stay time baseline and seriously impairs scientific utilization of the Station.

Deryder, L. J.↗

Damage Control Plan for International Space Station Recharge Tank Assembly Composite Overwrapped Pressure Vessel

As NASA has retired the Space Shuttle Program, a new method of transporting compressed gaseous nitrogen and oxygen needed to be created for delivery of these crucial life support resources to the International Space Station (ISS). One of the methods selected by NASA includes the use of highly pressurized, unprotected Recharge Tank Assemblies (RTAs) utilizing Composite Overwrapped Pressure Vessels (COPVs). A COPV consists of a thin liner wrapped with a fiber composite and resin or epoxy. It is typically lighter weight than an all metal pressure vessel of similar volume and therefore provides a higher-efficiency means for gas storage. However COPVs are known to be susceptible to damage resulting from handling, tool drop impacts, or impacts from other objects. As a result, a comprehensive Damage Control Plan has been established to mitigate damage to the RTA COPV throughout its life cycle. The DCP is intended to evaluate and mitigate defined threats during manufacturing, shipping and handling, test, assembly level integration, shipment while pressurized, launch vehicle integration and mission operations by defining credible threats and methods for preventing potential damage while still maintaining the primary goal of resupplying ISS gas resources. A comprehensive threat assessment is performed to identify all threats posed to the COPV during the different phases of its lifecycle. The threat assessment is then used as the basis for creating a series of general inspection, surveillance and reporting requirements which apply across all phases of the COPV's life, targeted requirements only applicable to specific work phases and a series of training courses for both ground personnel and crew aboard the ISS. A particularly important area of emphasis deals with creating DCP requirements for a highly pressurized, large and unprotected RTA COPV for use during Inter Vehicular Activities (IVA) operations in the micro gravity environment while supplying pressurized gas to the ISS for crew life support.

Cook, Anthony J.↗

Lightweight IMM PV Flexible Blanket Assembly

Deployable Space Systems (DSS) has developed an inverted metamorphic multijunction (IMM) photovoltaic (PV) integrated modular blanket assembly (IMBA) that can be rolled or z-folded. This IMM PV IMBA technology enables a revolutionary flexible PV blanket assembly that provides high specific power, exceptional stowed packaging efficiency, and high-voltage operation capability. DSS's technology also accommodates standard third-generation triple junction (ZTJ) PV device technologies to provide significantly improved performance over the current state of the art. This SBIR project demonstrated prototype, flight-like IMM PV IMBA panel assemblies specifically developed, designed, and optimized for NASA's high-voltage solar array missions.

Spence, Brian↗

Use of DSC and DMA Techniques to Help Investigate a Material Anomaly for PTFE Used in Processing a Piston Cup for the Urine Processor Assembly (UPA) on International Space Station (ISS)

Human urine and flush water are eventually converted into drinking water with the Urine Processor Assembly (UPA) aboard the International Space Station (ISS). This conversion is made possible through the Distillation Assembly (DA) of the UPA. One component of the DA is a molded circular piston cup made of virgin polytetrafluoroethylene (PTFE). The piston cup is assembled to a titanium component using eight fasteners and washers. Molded PTFE produced for spare piston cups in the first quarter of 2010 was different in appearance and texture, and softer than material molded for previous cups. For the suspect newer PTFE material, cup fasteners were tightened to only one-half the required torque value, yet the washers embedded almost halfway into the material. The molded PTFE used in the DA piston cup should be Type II, based on AMS 3667D and ASTM D4894 specifications. The properties of molded PTFE are considerably different between Type I and II materials. Engineers working with the DA thought that if Type I PTFE was molded by mistake instead of Type II material, that could have resulted in the anomalous material properties. Typically, the vendor molds flat sheet PTFE from the same material lot used to mold the piston cups, and tensile testing as part of quality control should verify that the PTFE is Type II material. However, for this discrepant lot of material, such tensile data was not available. Differential scanning calorimetry (DSC) and dynamic mechanical analysis (DMA) were two of the testing techniques used at the NASA/Marshall Space Flight Center (MSFC) to investigate the anomaly for the PTFE material. Other techniques used on PTFE specimens were: Shore D hardness testing, tensile testing on dog bone specimens and a qualitative estimation of porosity by optical and scanning electron microscopy.

Wingard, Doug↗

Challenges in the development of the shuttle extravehicular mobility unit

The development of the Shuttle extravehicular mobility unit (EMU) has required significant technology advances in the design of the astronaut life support system and space-suit assembly. The life support system and space-suit assemblies are integrated into a single system and optimized for the primary function of supporting astronaut extravehicular operations. Rather than accommodating a limited, male-only astronaut population, the EMU must satisfy size requirements for both males and females with a minimum of sized parts. In addition, the Shuttle EMU has been designed to implement Space Shuttle Program philosophy of long operating life and mission reuse capability to minimize program lifetime cost. The advancement in life support system and space-suit technology achieved by the development of the Shuttle extravehicular mobility unit (EMU) is illustrated by comparison with the requirements for and the design features of the Apollo EMU.

Mcmann, H. J.↗

Planning Assembly Of Large Truss Structures In Outer Space

Report dicusses developmental algorithm used in systematic planning of sequences of operations in which large truss structures assembled in outer space. Assembly sequence represented by directed graph called "assembly graph", in which each arc represents joining of two parts or subassemblies. Algorithm generates assembly graph, working backward from state of complete assembly to initial state, in which all parts disassembled. Working backward more efficient than working forward because it avoids intermediate dead ends.

De Mello, Luiz S. Homem↗

Prototype secondary mirror assembly design for the space infrared telescope facility

The authors describe the design of a liquid helium temperature prototype secondary mirror assembly (PSMA) under developement for the NASA Space Infrared Telescope Facility (SIRTF) program. The SIRTF secondary mirror assembly must operate below 4 K and provide highly precise two-axis dynamic tilting (chopping) in addition to the conventional functions needed by the SIRTF observatory. The PSMA design uses a fused quartz mirror kinematically attached at its center to an aluminum cruciform. The mirror/cruciform assembly is driven in tilt about its combined center of mass using a unique flexure pivot and a four-actuator control system with feedback provided by pairs of differential position sensors. The voice coil actuators are mounted on a second flexture-pivoted mass, enhancing servo system stability and isolating the telescope from vibration-induced disturbances. The mirror/cruciform and the reaction mass are attached to opposite sides of an aluminum mounting plate whose dimensional characteristics are nominally identical to those of the aluminum flexure pivot material. The mounting plate is connected to the outer housing by a six-degree-of-freedom focus and centering mechanism using pivoted actuation levers driven by lead screw/harmonic drive/stepper motor assemblies.

Stier, M.↗

Assembly of user systems at Space Station

The technical and programmatic benefits of on-orbit assembly are outlined. Operational and automation considerations relating to on-orbit assembly are reviewed. Space Station capabilities for orbital assembly are discussed.

Cline, Helmut P.↗

International Space Station (ISS) Advanced Recycle Filter Tank Assembly (ARFTA)

The International Space Station (ISS) Recycle Filter Tank Assembly (RFTA) provides the following three primary functions for the Urine Processor Assembly (UPA): volume for concentrating/filtering pretreated urine, filtration of product distillate, and filtration of the Pressure Control and Pump Assembly (PCPA) effluent. The RFTAs, under nominal operations, are to be replaced every 30 days. This poses a significant logistical resupply problem, as well as cost in upmass and new tanks purchase. In addition, it requires significant amount of crew time. To address and resolve these challenges, NASA required Boeing to develop a design which eliminated the logistics and upmass issues and minimize recurring costs. Boeing developed the Advanced Recycle Filter Tank Assembly (ARFTA) that allowed the tanks to be emptied on-orbit into disposable tanks that eliminated the need for bringing the fully loaded tanks to earth for refurbishment and relaunch, thereby eliminating several hundred pounds of upmass and its associated costs. The ARFTA will replace the RFTA by providing the same functionality, but with reduced resupply requirements

Nasrullah, Mohammed K.↗

International Space Station Carbon Dioxide Removal Assembly Testing

Performance testing of the International Space Station Carbon Dioxide Removal Assembly flight hardware in the United States Laboratory during 1999 is described. The CDRA exceeded carbon dioxide performance specifications and operated flawlessly. Data from this test is presented.

Knox, James C.↗