Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Safety Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

Distributed processing on the Space Shuttle - A case study

A Power Extension Package (PEP) has been designed to provide additional electrical power and energy during Shuttle sortie missions. The considered investigation was conducted to determine the most suitable allocation of PEP monitoring and control functions between the Orbiter's existing (centralized) Systems Management General Purpose Computer and an embedded PEP processor. PEP monitoring and control functions are examined, and a configuration definition is considered, taking into account the 'functional migration' process, function allocation criteria, and candidate functional configurations. A trade study is conducted, giving attention to an assessment of four candidate configurations. Assessment factors are related to cost, development risk, aspects of reliability and safety, PEP design complexity, PEP/STS integration complexity, flight operations, and launch/landing site operations. A thorough (subjective) assessment of the PEP system life cycle indicates substantial benefits from a distributed processing approach.

Schoonmaker, P. B.↗

Collaborative Approaches in Developing Environmental and Safety Management Systems for Commercial Space Transportation

The Federal Aviation Administration (FAA), Office of Commercial Space Transportation (AST) licenses and permits U.S. commercial space launch and reentry activities, and licenses the operation of non-federal launch and reentry sites. ASTs mission is to ensure the protection of the public, property, and the national security and foreign policy interests of the United States during commercial space transportation activities and to encourage, facilitate, and promote U.S. commercial space transportation. AST faces unique challenges of ensuring the protection of public health and safety while facilitating and promoting U.S. commercial space transportation. AST has developed an Environmental Management System (EMS) and a Safety Management System (SMS) to help meet its mission. Although the EMS and SMS were developed independently, the systems share similar elements. Both systems follow a Plan-Do-Act-Check model in identifying potential environmental aspects or public safety hazards, assessing significance in terms of severity and likelihood of occurrence, developing approaches to reduce risk, and verifying that the risk is reduced. This paper will describe the similarities between ASTs EMS and SMS elements and how AST is building a collaborative approach in environmental and safety management to reduce impacts to the environment and risks to the public.

Federal Aviation Administration (FAA)↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shuttle Upgrade Using 5-Segment Booster (FSB)

In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.

Sauvageau, Donald R.↗

Initial Application of TSUNAMI for Validation of Advanced Fuel Systems

A number of advanced reactor concepts and accident-tolerant fuels (ATFs) are under development or in the initial stages of deployment and testing in the nuclear power industry. Many of these concepts incorporate chemical or material forms that have not traditionally been used in the nuclear industry and may present challenges for nuclear criticality safety validation. Sensitivity/uncertainty methods are ideally suited for assessing the applicability of existing critical experiments to these potentially challenging applications. This paper presents two case studies recently completed at Oak Ridge National Laboratory (ORNL) which investigated the use of the TSUNAMI tools within the SCALE code system to perform such assessments.Many advanced reactor concepts include uranium enrichments above 5 wt% 235U but below the 20 wt% limit of low-enriched uranium (LEU). This material, referred to as high assay LEU (HA-LEU), poses difficulties across the entire infrastructure of nuclear power, including enrichment, transportation, fabrication, and storage. A potentially representative transportation package was selected to perform a criticality safety validation assessment for UF6 containing HA-LEU. Sensitivity data were generated using the TSUNAMI-3D sequence, and an assessment of the applicability of a range of critical experiments was performed using the TSUNAMI-IP tool. The critical experiments were drawn from the set of available sensitivity data files distributed with the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The results indicate that a sufficient number of available experiments may be available to perform validations for these systems.Many different cladding materials and fuel dopants are included in ATFs to mitigate the consequences of a loss of coolant accident. Some of these systems have already been fabricated and introduced as lead test assemblies in commercial reactors, while others are still being developed. Several concepts were considered for pressurized-water reactors (PWRs) and boiling-water reactors (BWRs) in comparison to the current Zircaloy and UO2 fuel system. In most of these cases, the ATF materials did not significantly impact the number of applicable experiments for validation. Some fuel and cladding materials were identified, however, which may reduce the number of available experiments and which will increase the nuclear data–induced uncertainty in neutron multiplication.

Marshall, William (B.J.)↗

Simulating Microwave and Radar Signals in Severe Weather Conditions

The development of radiative transfer simulators for radar and microwave signals, spanning a range of frequencies from 10 to 800 GHz, is paramount for enhancing weather forecasting accuracy, particularly for severe weather events. These tools facilitate the assimilation of microwave and radar observations into numerical weather prediction models, thereby improving accuracy of weather forecasts. Additionally, they directly simulate radar signals crucial for autonomous vehicle operation, with frequencies commonly used in radar systems such as 24, 74, 77, and 79 GHz. However, these frequencies are susceptible to weather phenomena like severe rain and snow, which can significantly impact vehicle safety and performance. These simulation tools, including radiative transfer simulators, serve a dual purpose. Firstly, they enhance forecasts for severe weather events, contributing to autonomous vehicle safety by providing early warnings and risk assessments. Secondly, they enable the direct simulation of radar signals in autonomous vehicle driving systems, allowing researchers and engineers to evaluate radar system performance under various weather conditions. In addition to the radar signal simulator, this abstract discusses the incorporation of advanced scattering properties developed using the discrete dipole approximation (DDA). The DDA technique enhances scattering calculations for frozen hydrometeors at microwave frequencies, thereby improving the accuracy of radar signal simulations and enabling more accurate assessments of radar system performance in adverse weather conditions. In summary, this abstract explores the development and utilization of comprehensive simulation tools, emphasizing their significance in simulating microwave and radar signals and improving weather forecasts. Special attention is given to the simulation of radar signals at critical frequencies for autonomous vehicle sensing and navigation, addressing challenges posed by severe weather phenomena and their effects on signal propagation and detection

Isaac Moradi↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Estimating effects of accidental propellant explosions

Workbook assesses magnitudes and effects of blasts and fragments from ground system explosions. It provides designer and safety engineer with rapid methods for predicting damage and hazards from explosions of liquid-propellant and compressed-gas vessels used in ground storage, transport, and handling.

Ordin, P. M.↗

Survey Plan For Characterization of the Subsurface Underlying the National Aeronautics and Space Administration's Marshall Space Flight Center in Huntsville, Alabama

Topic considered include: survey objectives; technologies for non-Invasive imaging of subsurface; cost; data requirements and sources; climatic condition; hydrology and geology; chemicals; magnetometry; electrical(resistivity, potential); optical-style imaging; reflection/refraction seismics; gravitometry; photo-acoustic activation;well drilling and borehole analysis; comparative assessment matrix; ground sensors; choice of the neutron sources; logistic of operations; system requirements; health and safety plans.

Source record↗

Assessment of the NASA Space Shuttle Program's Problem Reporting and Corrective Action System

This paper documents the general findings and recommendations of the Design for Safety Programs Study of the Space Shuttle Programs (SSP) Problem Reporting and Corrective Action (PRACA) System. The goals of this Study were: to evaluate and quantify the technical aspects of the SSP's PRACA systems, and to recommend enhancements addressing specific deficiencies in preparation for future system upgrades. The Study determined that the extant SSP PRACA systems accomplished a project level support capability through the use of a large pool of domain experts and a variety of distributed formal and informal database systems. This operational model is vulnerable to staff turnover and loss of the vast corporate knowledge that is not currently being captured by the PRACA system. A need for a Program-level PRACA system providing improved insight, unification, knowledge capture, and collaborative tools was defined in this study.

Korsmeryer, D. J.↗

Review of Exploration Systems Development (ESD) Integrated Hazard Development Process: Appendices - Volume 1

The Chief Engineer of the Exploration Systems Development (ESD) Office requested that the NASA Engineering and Safety Center (NESC) perform an independent assessment of the ESD's integrated hazard development process. The focus of the assessment was to review the integrated hazard analysis (IHA) process and identify any gaps/improvements in the process (e.g., missed causes, cause tree completeness, missed hazards). This document contains the outcome of the NESC assessment.

Smiles, Michael D.↗

Review of Exploration Systems Development (ESD) Integrated Hazard Development Process: Volume 2 - Appendices

The Chief Engineer of the Exploration Systems Development (ESD) Office requested that the NASA Engineering and Safety Center (NESC) perform an independent assessment of the ESD's integrated hazard development process. The focus of the assessment was to review the integrated hazard analysis (IHA) process and identify any gaps/improvements in the process (e.g. missed causes, cause tree completeness, missed hazards). This document contains the outcome of the NESC assessment.

Smiles, Michael D.↗

A Review of Unmanned Aerial Vehicle Technology in Power Line Inspection

The electric power industry is one of the heaviest adopters of Unmanned Aerial Vehicles (UAV) technology, utilizing their versatility to enhance power line maintenance programs. For reliable power grids, routine maintenance operations and rapid repair operations are required across substantial geographical distances. Both maintenance and repair decisions are driven by assessment operations, such as inspections of mechanical structures with visible-band sensors, inspections for the presence of high voltage coronas and hot spots with multispectral sensors, and surveying of equipment and adjacent features (particularly vegetation) with photogrammetric and Light Detection and Ranging (LiDAR) sensors. Assessment was historically accomplished with manned helicopter flights or foot patrols. Recently, this critical economic segment harnessed advances in Unmanned Aerial Systems (UAS)technology to accomplish assessment tasks with faster results, lower cost, and higher levels of safety than historical methods. Adoption of UAVs in high-voltage electric power transmission activities is well underway. Adoption of UAVs for low voltage distribution activities is still emerging, with the important exception of post-storm damage assessment following major hurricanes (Harvey and Maria in 2017 and Michael in 2018). This report reviews the broad UAS adoption in high-voltage electric power transmission operations and early attempts at adoption in distribution operations. The ability to fly beyond visual line of sight (BVLOS) may increase the advantages of UAV inspection over former options, and in the United States, regulators have approved two pilot projects to demonstrate BVLOS methods and their benefits in operating and maintaining the power grid.

UAV↗

Geologic Disposal Safety Assessment (GDSA) Biosphere Model Development

The Spent Fuel and Waste Science and Technology Campaign of the U.S. Department of Energy Office of Nuclear Energy, Office of Spent Fuel and Waste Disposition is conducting research and development on geologic disposal of spent nuclear fuel and high-level nuclear waste. This work includes the Geologic Disposal Safety Assessment (GDSA) program which is charged with development of generic deep geologic repository concepts and system performance assessment models. One part of the GDSA framework is the development of a biosphere model capable of assessing doses to potential receptors exposed to radionuclides released from geologic disposal sites. As part of the GDSA framework, a biosphere model compatible with the PFLOTRAN massively parallel subsurface flow and reactive transport code is under development. The PFLOTRAN model provides the radionuclide source term for the biosphere model. The GDSA Biosphere model then assesses the potential movement of radionuclides through the surface biosphere and the subsequent exposure to a human receptor living in the biosphere. The biosphere model includes pathways originating from the groundwater as well as pathways originating from surface water bodies that have a water exchange with a contaminated groundwater body. The pathways for human exposure include consumption of drinking water, irrigated crops, meat animals, aquatic vegetation, and animals, etc.; external exposure from irrigated ground surfaces, surface water bodies, recreational activities, etc.; and inadvertent exposures such as ingestion of contaminated soils or shower water, etc. The GDSA Biosphere model was designed to be flexible and generic in order to accommodate a variety of different sites and climate states. This presentation will present the on the purpose, design, and development progress of the GDSA Biosphere Model.

GDSA, biosphere, repository↗

Evaluation in context: ATC automation in the field

The process for incorporating advanced technologies into complex aviation systems is as important as the final product itself. This paper described a process that is currently being applied to the development and assessment of an advanced ATC automation system, CTAS. The key element of the process is field exposure early in the system development cycle. The process deviates from current established practices of system development -- where field testing is an implementation endpoint -- and has been deemed necessary by the FAA for streamlining development and bringing system functions to a level of stability and usefulness. Methods and approaches for field assessment are borrowed from human factors engineering, cognitive engineering, and usability engineering and are tailored for the constraints of an operational ATC environment. To date, the focus has been on the qualitative assessment of the match between TMA capabilities and the context for their use. Capturing the users' experience with the automation tool and understanding tool use in the context of the operational environment is important, not only for developing a tool that is an effective problem-solving instrument but also for defining meaningful operational requirements. Such requirements form the basis for certifying the safety and efficiency of the system. CTAS is the first U.S. advanced ATC automation system of its scope and complexity to undergo this field development and assessment process. With the rapid advances in aviation technologies and our limited understanding of their impact on system performance, it is time we opened our eyes to new possibilities for developing, validating, and ultimately certifying complex aviation systems.

Harwood, Kelly↗

Structural Requirements for the Space Propulsion Engine Systems

In January 2004, the National Aeronautics and Space Administration (NASA) was given a vision for Space Exploration by President Bush, setting our sight on a bold new path to go back to the Moon, then to Mars and beyond. As NASA gets ready to meet the vision set by President Bush, failures are not an option. Reliability of the propulsion engine systems will play an important role in establishing an overall safe and reliable operation of these new space systems. A new standard, NASA-STD-5012, Strength and Life Assessment for Space Propulsion System Engines, has been developed to provide structural requirements for assessment of the propulsion systems engine. This standard is a complement to the current NASA-wide standard NASA-STD-5001, Structural Design and Test Factors of Safety for Spaceflight Hardware, which excluded the requirement for the engine systems (rotatory structures) along with pressure vessels. As developed, this document builds on the heritage of the multiple industrial standards related to strength and life assessment of the structures. For assuring a safe and reliable operation of a product and/or mission, establishing a set of structural assessment requirements is a key ingredient. Hence, a concentrated effort was made to improve the requirements where there are known lessons learned during the design, test, and operation phases of the Space Shuttle Main Engine (SSME) and other engine development programs. Requirements delineated in this standard are also applicable for the reusable and/or human missions. It shall be noted that "reliability of a system cannot be tested and inspected but can only be achieved if it is first designed into a system." Hence, these strength and life assessment requirements for the space propulsion system engines shall be used along with other good engineering practices, requirements, and policies.

Aggarwal, Pravin K.↗