Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Orbiter transfer vehicle concept definition and system analysis study. Volume 4: Space station accommodations. Revision 1

A brief summary is given of the key objectives of Task 5 of the Space Station Accommodations Concept Definition. Space station accommodations were assessed and defined for each potential candidate Space-Based OTV concept and for the composite OTV fleet. To accomplish this, the functional and physical interactions between each OTV concept and the space station were defined. Then, conceptual accommodation designs were prepared and optimized for approach and configuration. Initial space station requirements were identified, including the ability to accommodate and support evolution to maturity, and then a time-phasing of accommodations was prepared showing that evolution. In the process of developing physical and functional interactions, operational requirements were defined, together with associated timelines. In that the crew complement is subject to limitations, the operational requirements derivation is biased toward automation wherever possible. For each candidate Ground-Based OTV concept, operating in conjunction with the space station, the above process was repeated.

Randall, Roger M.↗

Microgravity and Materials Processing Facility study (MMPF): Requirements and Analyses of Commercial Operations (RACO) preliminary data release

This requirements and analyses of commercial operations (RACO) study data release reflects the current status of research activities of the Microgravity and Materials Processing Facility under Modification No. 21 to NASA/MSFC Contract NAS8-36122. Section 1 includes 65 commercial space processing projects suitable for deployment aboard the Space Station. Section 2 contains reports of the R:BASE (TM) electronic data base being used in the study, synopses of the experiments, and a summary of data on the experimental facilities. Section 3 is a discussion of video and data compression techniques used as well as a mission timeline analysis.

Source record↗

Analysis of low gravity tolerance of model experiments for space station: Preliminary results for directional solidification

It has become clear from measurements of the acceleration environment in the Spacelab that the residual gravity levels on board a spacecraft in low Earth orbit can be significant and should be of concern to experimenters who wish to take advantage of the low gravity conditions on future Spacelab missions and on board the Space Station. The basic goals are to better understand the low gravity tolerance of three classes of materials science experiments: crystal growth from a melt, a vapor, and a solution. The results of the research will provide guidance toward the determination of the sensitivity of the low gravity environment, the design of the laboratory facilites, and the timelining of materials science experiments. To data, analyses of the effects of microgravity environment were, with a few exceptions, restricted to order of magnitude estimates. Preliminary results obtained from numerical models of the effects of residual steady and time dependent acceleration are reported on: heat, mass, and momentum transport during the growth of a dilute alloy by the Bridgman-Stockbarger technique, and the response of a simple fluid physics experiment involving buoyant convection in a square cavity.

Alexander, J. Iwan D.↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

A plan for time-phased incorporation of automation and robotics on the US space station

A plan for the incorporation of Automation and Robotics technology on the Space Station is presented. The time phased introduction of twenty two selected candidates is set forth in accordance with a technology development forecast. Twenty candidates were chosed primarily for their potential to relieve the crew of mundane or dangerous operations and maintenance burdens, thus freeing crew time for mission duties and enhancing safety. Two candidates were chosen based on a potential for increasing the productivity of laboratory experiments and thus directly enhancing the scientific value of the Space Station. A technology assessment for each candidate investigates present state of the art, development timelines including space qualification considerations, and potential for technology transfer to earth applications. Each candidate is evaluated using a crew workload model driven by crew size, number of pressurized U.S. modules and external payloads, which makes it possible to assess the impact of automation during a growth scenario. Costs for each increment of implementation are estimated and accumulated.

Purves, R. B.↗

Remote servicing of space systems

Space systems are difficult to maintain on orbit. The difficulty arises from the limited ability and availability of the astronaut work force in the hazardous space environment. Remote robotic manipulation can free the astronaut from the hazardous working environment while also increasing the work force. However, remote robotic servicing is not without its own set of problems and limitations, such as communication time delay and unstructured worksites. Tests and test equipment are described which are designed to increase the understanding of the remote servicing problems and to allow development of potential solutions. A half scale satellite mockup was developed for evaluating and improving upon the design of replaceable subsystems, such as batteries and electronic boxes. A servicer system, that includes a six degree of freedom PUMA 560 robot and interchangeable end effectors (tools), was developed to aid in driving out servicer design requirements. The results include the time delay impact on servicing timelines and requirements for the servicer system.

Collins, S. L.↗

Development and demonstration of an on-board mission planner for helicopters

Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.

Deutsch, Owen L.↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

Comparison of programmable legend keyboard and dedicated keyboard for control of the flight management computer

A study is described which compares two types of input devices used to operate a flight management computer: a programmable legend (multifunction) keyboard and a conventional (dedicated) keyboard. Pilot performance measures, subjective responses, and a timeline analysis were used in evaluating the two keyboard concepts. A discussion of the factors to be considered in the implementation of a multifunction keyboard is included.

Crane, Jean M.↗

PLAN-IT - Knowledge-based mission sequencing

PLAN-IT (Plan-Integrated Timelines), a knowledge-based approach to assist in mission sequencing, is discussed. PLAN-IT uses a large set of scheduling techniques known as strategies to develop and maintain a mission sequence. The approach implemented by PLAN-IT and the current applications of PLAN-IT for sequencing at NASA are reported.

Biefeld, Eric W.↗

Far-field mission planning for nap-of-the-earth flight

In the face of numerically superior hostile forces, deployment of individual vehicles to the right place, at the right time, and the ability to plan missions with less conservatism, will become significant force multipliers. Far-field mission planning is one of the enabling technologies that will facilitate force coordination through management of mission timeline, vehicle survivability and fuel constraints. On-board replanning is required to deal responsively with departures from nominal plan execution that result from imperfect knowledge of and temporal variability in the mission environment. The far-field planning problem is posed as a constrained optimization problem and algorithms and structural organization are proposed for the solution.

Deutsch, Owen L.↗

Space station Platform Management System (PMS) replanning using resource envelopes

One of the responsibilities of the Space Station Platform Management System (PMS) is to maintain constraint-free, short-term plans for platform and free-flyer activities. Both the replanning function and the associated constraint-checking function are viewed as potentially requiring expert system assistance. The PMS Resource Envelope Scheduling System (PRESS) expert system, which is currently under development, is described. The PRESS capabilities will include the following: plan, replan, and perform constraint checking using resource envelopes resembling those required for telescience; initialize itself using the results fo a previous run; infer the replanning needs associated with a change in resource availability; allow the user to determine the level of interaction (including an advisory capability) with the system during execution; and generate both a graphic timeline and a report as output. The PRESS is being developed on an IBM PC/AT using TeKnowledge, Inc.'s M.1 expert system shell. The PRESS activity definitions and constraints are based on those defined for the Cosmic Background Explorer (COBE) mission scheduled for launch in early 1989.

Bush, Joy Lee↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Study plan

The two major objectives are: to present the study approach, and to provide the standard for guiding the Liquid Rocket Booster (LRB) project. The task plans provide a comprehensive description of the work to be performed. Each plan is presented on a foldout sheet that shows the task description, approach, timeframe, inputs/outputs, manloading, and management lead responsibility. A logic network depicting tasks/subtasks, interrelationships, and time-phasing is described. The milestones and timelines are defined for all tasks and subtasks.

Source record↗

Crew procedures and workload of retrofit concepts for microwave landing system

Crew procedures and workload for Microwave Landing Systems (MLS) that could be retrofitted into existing transport aircraft were evaluated. Two MLS receiver concepts were developed. One is capable of capturing a runway centerline and the other is capable of capturing a segmented approach path. Crew procedures were identified and crew task analyses were performed using each concept. Crew workload comparisons were made between the MLS concepts and an ILS baseline using a task-timeline workload model. Workload indexes were obtained for each scenario. The results showed that workload was comparable to the ILS baseline for the MLS centerline capture concept, but significantly higher for the segmented path capture concept.

Summers, Leland G.↗

Telerobotic assembly of space station truss structures

Discussed here are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRMS); and (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, G.↗

Study of sampling systems for comets and Mars

Several aspects of the techniques that can be applied to acquisition and preservation of samples from Mars and a cometary nucleus were examined. Scientific approaches to sampling, grounded in proven engineering methods are the key to achieving the maximum science value from the sample return mission. If development of these approaches for collecting and preserving does not preceed mission definition, it is likely that only suboptimal techniques will be available because of the constraints of formal schedule timelines and the normal pressure to select only the most conservative and least sophisticated approaches when development has lagged the mission milestones. With a reasonable investment now, before the final mission definition, the sampling approach can become highly developed, ready for implementation, and mature enough to help set the requirements for the mission hardware and its performance.

Amundsen, R. J.↗

Hubble Space Telescope electrical power system model

This paper describes one of the most comprehensive models ever developed for a spacecraft electrical power system (EPS). The model was developed for the Hubble Space Telescope (HST) to evaluate vehicle power system performance and to assist in scheduling maintenance and refurbishment missions by providing data needed to forecast EPS power and energy margins for the mission phases being planned. The EPS model requires a specific mission phase description as the input driver and uses a high granularity database to produce a multi-orbit power system performance report. The EPS model accurately predicts the power system response to various mission timelines over the entire operational life of the spacecraft.

Baggett, Randy↗

A strategy for Space Station user integration

An approach for the development of a flexible end-to-end user integration process for the Space Station is proposed. Users are assigned to an integration class based on the integration complexity of their payloads. The user, user sponsor, and payload accomodations manager develop an integration timeline for the user. The development of techniques to manage multiple payloads and increments over the life of the Space Station, while minimizing interactions between the integration flows of individual users is considered. The integration classes are defined and the strategic, tactical, and execution planning phases of the process are described.

Levitt, Paul A.↗