Search NASA⌕ Search

SEARCH · Search NASA

Results for “VIBRATION TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Chapter 9 - Pre-Flight Tests

Pre-flight testing is critical to the success of any flight test program. Pre-flight tests are performed to measure and evaluate the characteristics of an aircraft in a non-flying environment and to verify that these characteristics are as desired. Since aircraft systems are becoming more and more complex, conducting proper pre-flight testing to help identify system characteristics and deficiencies prior to flight is more important now than ever before. Much flight test time has been lost fixing problems that should have been found and corrected prior to flight. Accidents have occurred because pre-flight tests and verification procedures were not conducted thoroughly enough to identify the aircraft's characteristics properly or to find system discrepancies. Proper pre-flight testing helps ensure that the aircraft is ready to fly and contributes toward an efficient, productive, and safe flight test program. The reader should be aware that this Section is dedicated to the testing that should take place prior to the first flight. There are other "pre-flight" tests that take place prior to each individual flight. These latter tests are not discussed in this Section. The following paragraphs of this Section describe significant tests that are usually accomplished prior to flying a new or highly modified aircraft. Test objectives, descriptions, products, and requirements are provided in the following subsections: 9.1 Wind tunnel tests 9.2 Simulation tests 9.3 Propulsion tests 9.4 Weight and balance tests 9.5 Ground vibration tests 9.6 Structural loads tests 9.7 Gain margin tests 9.8 Verification and calibration tests 9.9 Taxi tests The specific examples given and the test facilities mentioned in this Section will illustrate the approach taken and the techniques used by the US Air Force; however, they are typical of those used by other test organizations.

Paul W Kirsten↗

TESTING OF A 20-METER SOLAR SAIL SYSTEM

This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program1-3. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance4. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods were evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

Gaspar, J. L.↗

TESTING OF A 20-METER SOLAR SAIL SYSTEM

This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods are evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

Gaspar, Jim L.↗

Compact and Lightweight Sabatier Reactor for Carbon Dioxide Reduction

The utilization of CO2 to produce life support consumables, such as O2 and H2O, via the Sabatier reaction is an important aspect of NASA s cabin Atmosphere Revitalization System and In-Situ Resource Utilization architectures for both low-earth orbit and long-term manned space missions. In the current International Space Station (ISS) and other low orbit missions, metabolically-generated CO2 is removed from the cabin air and vented into space, resulting in a net loss of O2. This requires a continuous resupply of O2 via water electrolysis, and thus highlights the need for large water storage capacity. For long-duration space missions, the amount of life support consumables is limited and resupply options are practically nonexistent, thus atmosphere resource management and recycle becomes crucial to significantly reduce necessary O2 and H2O storage. Additionally, the potential use of the Martian CO2-rich atmosphere and Lunar regolith to generate life support consumables and propellant fuels is of interest to NASA. Precision Combustion, Inc. (PCI) has developed a compact, lightweight Microlith(Registered TradeMark)-based Sabatier (CO2 methanation) reactor which demonstrates the capability of achieving high CO2 conversion and near 100% CH4 selectivity at space velocities of 30,000-60,000 hr-1. The combination of the Microlith(Registered TradeMark) substrates and durable, novel catalyst coating permitted efficient Sabatier reactor operation that favors high reactant conversion, high selectivity, and long-term durability. This paper presents the reactor development and performance results at various operating conditions. Additionally, results from 100-hr durability tests and mechanical vibration tests are discussed.

Junaedi, Christian↗

James Webb Space Telescope Optical Telescope Element/Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirror center of curvature optical tests, electrical and operational tests, acoustics and vibration testing at the Goddard Space Flight Center before being shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparation for the cryogenic optical testing, the JWST project has built a Pathfinder telescope and has completed two Optical Ground System Equipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize optical test results to date and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee↗

James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated ScienceInstrument Module (ISIM)are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirrorcenter of curvatureoptical tests, electrical and operational tests, acoustics and vibration testing at the Goddard SpaceFlight Center beforebeing shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparationfor the cryogenicoptical testing, the JWST project has built a Pathfinder telescope and has completed two OpticalGround SystemEquipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize opticaltest results todate and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors for use in Radioisotope Power Systems (RPS). Significant progress was made towards such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects which have similarities and relevance to current contract designs. Four of which are flexure-bearing based, and another six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current record for maintenance-free heat-engine run-time. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 28,000 hours.

Oriti, Salvatore M.↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA GRC

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors in support of Radioisotope Power System (RPS) development. Significant progress was made towards such a system that utilized Stirling conversion machines during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This new effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Two of the contracts have been awarded the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating 10 convertors from previous development projects. Four of which are flexure-bearing based, and the other six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current maintenance-free heat-engine run-time record. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 26,000 hours.

Oriti, Salvatore↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center is supporting the development of high-efficiency power convertors for use in radioisotope power systems (RPS). Significant progress was made toward such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was canceled in 2013 by the U.S. Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton design. The technology development contracts each consist of up to three phases: design, fabrication, and test. As of May 2018, all contracts have completed the design phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification (IV and V) at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, Glenn is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects, which have similarities and relevance to current contract designs. Four of these are flexure-bearing based and another six are gas bearing based. One of the flexure-bearing convertors has accumulated over 110,000 h of operation and holds the current record for maintenance-free heat-engine run time. Another flexure-bearing convertor was recently manually shut down after 105,620 h of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of run time on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent a launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Among the gas-bearing convertors, the longest running unit has accumulated over 70,000 h of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously for which the longest run time has reached 28,000 h.

Oriti, Salvatore M.↗

Digital control of high-intensity acoustic testing

To eliminate previous system instabilities and control high-intensity acoustic tests, a digital control vibration test system is modified by a software change. Three systems for the control of acoustic testing are compared: a hybrid digital/analog system, a digital vibration system, and the same digital vibration system modified by a software change to allow acoustic testing. It is shown that the hybrid system and the modified vibration system exhibit almost equal performance, although the hybrid system performs testing twice as fast. The development of a specialized acoustic test control system is justified since it costs far less than the general-purpose vibration control system. However, the latter is much easier to set up for a test, which is important in preventing overtesting of valuable spacecraft components.

Slusser, R. A.↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method developed to verify commercial printed-circuit boards for a Shuttle orbital flight is discussed. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Temperature definition and vibration tests are performed next. Final assembly testing is performed to simulate the Shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 h of trouble-free operation. Verification is successful when all components and final assemblies have passed each test. This method was very successful in verifying that commercial printed-circuit boards will survive in the Shuttle environment.

Foster, William M., II↗

Fiberoptic characteristics for extreme operating environments

Fiberoptics could offer several major benefits for cryogenic liquid-fueled rocket engines, including lightning immunity, weight reduction, and the possibility of implementing a number of new measurements for engine condition monitoring. The technical feasibility of using fiberoptics in the severe environments posed by cryogenic liquid-fueled rocket engines was determined. The issues of importance and subsequent requirements for this use of fiberoptics were compiled. These included temperature ranges, moisture embrittlement succeptability, and the ability to withstand extreme shock and vibration levels. Different types of optical fibers were evaluated and several types of optical fibers' ability to withstand use in cryogenic liquid-fueled rocket engines was demonstrated through environmental testing of samples. This testing included: cold-bend testing, moisture embrittlement testing, temperature cycling, temperature extremes testing, vibration testing, and shock testing. Three of five fiber samples withstood the tests to a level proving feasibility, and two of these remained intact in all six of the tests. A fiberoptic bundle was also tested, and completed testing without breakage. Preliminary cabling and harnessing for fiber protection was also demonstrated. According to cable manufacturers, the successful -300 F cold bend, vibration, and shock tests are the first instance of any major fiberoptic cable testing below roughly -55 F. This program has demonstrated the basic technical feasibility of implementing optical fibers on cryogenic liquid-fueled rocket engines, and a development plan is included highlighting requirements and issues for such an implementation.

Delcher, R. C.↗

Magnetic shielding and vacuum test for passive hydrogen masers

Vibration tests on high permeability magnetic shields used in the SAO-NRL Advanced Development Model (ADM) hydrogen maser were made. Magnetic shielding factors were measured before and after vibration. Preliminary results indicate considerable (25%) degradation. Test results on the NRL designed vacuum pumping station for the ADM hydrogen maser are also discussed. This system employs sintered zirconium carbon getter pumps to pump hydrogen plus small ion pumps to pump the inert gases. In situ activation tests and pumping characteristics indicate that the system can meet design specifications.

Gubser, D. U.↗

Shuttle being tested at Marshall Center

Ground vibration tests of the space shuttle vehicle performed to evaluate the structural dynamics and their effect on the control system of the shuttle are described. Test results are used to verify the system design and mathematical models that predict how the shuttle's control system will react to the much more severe vibrations expected during launch and flight into orbit. The test configurations, the test facility, and the dynamic test suspension system are among the topics discussed.

Source record↗

Coupled Facility/Payload Vibration Modeling Improvements

A major phase of aerospace hardware verification is vibration testing. The standard approach for such testing is to use a shaker to induce loads into the payload. In preparation for vibration testing at NASA/GSFC there is an analysis to assess the responses of the payload. A new method of modeling the test is presented that takes into account dynamic interactions between the facility and the payload. This dynamic interaction has affected testing in the past, but been ignored or adjusted for during testing. By modeling the combination of the facility and test article (payload) it is possible to improve the prediction of hardware responses. Many aerospace test facilities work in similar way to those at NASA Goddard Space Flight Center. Lessons learned here should be applicable to other test facilities with similar setups.

Finite Element Analysis↗

Coupled Facility-Payload Vibration Modeling Improvements

A major phase of aerospace hardware verification is vibration testing. The standard approach for such testing is to use a shaker to induce loads into the payload. In preparation for vibration testing at National Aeronautics and Space Administration/Goddard Space Flight Center an analysis is performed to assess the responses of the payload. A new method of modeling the test is presented that takes into account dynamic interactions between the facility and the payload. This dynamic interaction has affected testing in the past, but been ignored or adjusted for during testing. By modeling the combined dynamics of the facility and test article (payload) it is possible to improve the prediction of hardware responses. Many aerospace test facilities work in similar way to those at NASA/Goddard Space Flight Center. Lessons learned here should be applicable to other test facilities with similar setups.

Finite Element Analysis↗