Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Tritiated waste management opportunities based on the reduction of tritium activity and outgassing - 15607

Tritiated waste is called as such because tritium is the main radionuclide contained in this waste which is generally produced by nuclear research, fusion facilities and small producers, e.g. hospitals, research centers and industries. The management of this type of waste can be improved by using techniques that reduce the tritium activity and outgassing levels. Several options are possible depending on the waste form and the amount of tritium: temporary storage for tritium decay up to 50 years, thermal treatment such as incineration and melting, and high-integrity containers for conditioning, either considered alone or in combination with one of the other options. This paper compares a number of waste management parameters with respect to tritiated waste: the environmental impact of tritium releases, secondary waste management, volume reduction of the waste for final disposal, and the waste activity after treatment, not to mention the related safety issues, the performance of the techniques used in each option, and economic aspects. The results of this comparative work are given in this paper, with the advantages and drawbacks of each option discussed in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making Conceptual Design Choices For A Long-Term Waste Management Facility - Environmental Impact vs. Environmental Performance

In 1982 the Government of Canada established the Low-Level Radioactive Waste Management Office (LLRWMO) with a mandate that includes resolving historic low-level radioactive waste (LLRW) problems across the country. Historic wastes are defined as those wastes for which the original producer can no longer reasonably be held responsible and which the federal government has accepted responsibility. A variety of sites contaminated with LLRW materials have been identified across Canada. Many of these sites, associated with former radium and uranium refining and processing operations, are located in urbanized areas of Southern Ontario. However, other sites have also been discovered at more remote locations in Canada, including northern Alberta and the Northwest Territories. The diversity of waste forms, ranging from pitchblende ore and residual processing wastes, to mixed contaminated soils and construction debris, present ongoing challenges for the LLRWMO to overcome in meeting its mandate to resolve these historic waste problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 36: Hot Topics in US Commercial Low-Level Waste Management

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials shared their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Session no. 36 Co-Chairs, Patricia Holahan and Daniel Shrum, introduced the panelists and provided a summary of the purpose of the session. This Panel Session focused on several current and emerging issues impacting the commercial Low-Level Radioactive Waste (LLRW) management in the US from the perspective of active members of the Low-Level Waste Forum, Inc., States, Compact, as well as Federal and nuclear industries. The panelists provided different perspectives on number of key issues such as: LLW disposal facility status and updates (e.g.; in terms of disposal capacity, plans, and waste acceptance conditions). The panelists also addressed waste disposal rates and potential impacts of ongoing regulatory developments by the NRC and the concerned States. Other timely topics pertaining to the revision of 10CFR Part 61, the Greater-than-Class C (GTCC) and Transuranic (TRU) waste, and Very Low-Level Waste (VLLW) disposal issues were also addressed at this Session. Panelists with presentations: Hot Topics in US Commercial LLW Management (Joe Weismann); Texas LLRW Compact (David Carlson); Texas Low-Level Radioactive Waste Disposal Compact Commission (John Salsman); Barnwell LLRW Disposal Facility (Benjamin Smith, Bill Carver)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the Transuranic Waste Processing Center Low-Level Waste at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the Transuranic Waste Processing Center (TWPC) Low-Level waste stream is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the TWPC Low-Level Waste meets all DOE M 435.1-1 performance objectives. The TWPC Low-Level Waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Vadose Zone Sediment: Borehole 299-W23-19 [SX-115] in the S-SX Waste Management Area

This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.15 and 4.19. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The Tank Farm Vadose Zone Project is led by CH2M HILL Hanford Group, Inc. Their goals include defining risks from past and future single-shell tank farm activities, identifying and evaluating the efficacy of interim measures, and collecting geotechnical information and data. The purpose of these activities is to support future decisions made by the U.S. Department of Energy (DOE) regarding near-term operations, future waste retrieval, and final closure activities for the single-shell tank Waste Management Areas. To help in this effort, CH2M HILL Hanford Group, Inc. contracted with scientists at Pacific Northwest National Laboratory to analyze sediment samples collected from borehole 299-W23-19.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada Test Site 2009 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2009 results. During 2009, groundwater at each of the three pilot wells was sampled on March 10, 2009, and August 18, 2009, and water levels at each of the three pilot wells were measured on February 17, May 6, August 17, and November 10, 2009. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2009 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

54 ENVIRONMENTAL SCIENCES↗

Municipal solid waste management in Lahore City District, Pakistan

This study deals with generation, composition, collection, transportation, and disposal, as well as the present cost of the waste management on the basis of 60% collection of the total waste and the cost of proposed improved system of management on the basis of 100% waste collection using the IWM-2 LCI model. A GIS map of Data Ganj Bakhsh Town (DGBT) of Lahore City District showing communal storage facilities is also provided. DGBT has a population of 1,624,169 living in 232,024 dwellings. The total waste generated per year is 500,000 tons, or 0.84/kg/cap/day. Presently 60% of the MSW is collected and disposed in open dumps, while 40% is not collected and lies along roadsides, streets railway lines, depressions, vacant plots, drains, storm drains and open sewers. In DGBT, 129 containers of 5-m{sup 3} capacity, 120 containers of 10-m{sup 3} capacity and 380 skips of 2.5-m{sup 3} capacity are placed for waste collection. The overall collection and disposal cost of the MSW of DGBT is $3,177,900/yr, which is $10.29/ton. Modeling was conducted using the IWM-2 model for improved collection and disposal on the basis of 100% service, compared to the current 60% service. The modelled cost is $8.3/per ton, which is 20% less than the present cost, but the overall cost of 100% collection and disposal increases to $4,155,737/yr.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste is our Product. Developing, Implementing and Optimising Waste Management at Dounreay - 19039

The UK's Fast Breeder Reactor Research programme was centred at Dounreay, in the very north of Scotland, from 1955. Since 1994, the site has been focused on decommissioning, and represents one of the most complex, technically challenging and hazardous nuclear clean-up projects in Europe. Since 2012, Dounreay Site Restoration Ltd (DSRL) has been contracted by the NDA as the Site License Company to deliver the defined scope of work, under a Target Cost contract, to decommission the site to achieve the Interim End State by 2030-2033, whilst managing the transition of its people. All parties, including DSRL's Parent Body Organisation Cavendish Dounreay Partnership Ltd (a consortium of Cavendish Nuclear, AECOM, and Jacobs), recognise that there are significant technical and regulatory challenges to achieve this, as well as safely managing the transition for our workforce on what is effectively a 'closure' contract. The product of decommissioning is waste; over the course of the programme, a full range of higher activity and lower level radioactive wastes will be generated, and must be safely managed. This paper will address: - The Policy issues relating to radioactive waste management at Dounreay, including particular issues relating to implementation of Scottish policy, including how Waste Management is Optimised. - An overview of the decommissioning programme and the delivery of an Interim End State; - The type, range and nature of radioactive wastes requiring safe management at Dounreay; - Higher Activity Wastes (HAW): - Setting higher activity waste strategy; defining products and interim storage requirements; - Technical, regulatory and stakeholder issues for HAW strategy; - Lower Activity Wastes: - Setting Low Level Waste (LLW) strategy; defining a disposal product and development and status for Dounreay's LLW Disposal Vaults; - Implementing LLW strategy; - Technical, regulatory and stakeholder issues for LLW strategy; - Optimising Waste Management -Optimising waste from generation (from decommissioning workfaces) through to disposal -why, and how; - The Waste Informed Decommissioning model as a methodology and approach; - Impact and importance of Waste Management on a target cost contract; - Establishment of a Waste Optimisation Programme to drive ownership, delivery and culture change; - Management responsibilities and informing organisational design; - Sharing and learning from Best Practice; - The Challenge - how to ensure workforce and teams are engaged in delivering optimisation requirements; - Conclusions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

No Time Wasted. 25 years COVRA: Radioactive Waste Management in the Netherlands

Time will render radioactive waste harmless. How can we manage the time radioactive substances remain harmful? Just 'wait and see' or 'marking time' is not an option. We need to isolate the waste from our living environment and control it as long as necessary. December 2007 was a time to commemorate, as the national waste management organisation of the Netherlands, COVRA, celebrated its 12. anniversary. During this period of 25 years a stable policy has been formulated and implemented. For the situation in the Netherlands, it was obvious that a period of long term storage was needed. Both the small volume of waste and the limited financial possibilities are determining factors. Time is needed to let the volume of waste grow and to let the money, needed for disposal, grow in a capital growth fund. A historical overview of the activities of COVRA is presented and lessons learned over a period of 25 years are given. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback of the Dutch Historical Waste Management Program - 17085

This paper provides a feedback on the Dutch historical waste management program. Over the past decades, the High Flux Reactor located in Petten in the province of North Holland has tested numerous types of materials and fuels irradiation, for both medical and nuclear energy applications. A number of waste containers was accumulated on site, where the storage facility was initially built. Following Dutch political decisions in the 1980's, the contents of the waste storage facility in Petten must be transferred to another location. The consequences of this decision included the transportation of waste containers from Petten to the new location, which is located in the South-West of the Netherlands. This project was initiated and is now running. It includes a complex structure and can be described as follows: each historical-waste container will be opened, its contents segregated in three categories depending on the dose rate emission, characterized and repacked in new containers suitable for transportation and storage at the new site. The approach chosen is based on the final dose rate emitted by the repacked containers, which are sub-divided into 3 categories.. The lowest dose-emitting containers are transported directly to the new storage facility. The 2 other categories are first transported to a third party to be super compacted and subsequently transported to the new storage facility. So far, the segregation method is based on Co-60 gamma emission and nuclide vectors associated to the different materials. A pre-sorting has been established to fit as much as possible IAEA recommendations. Historical waste has then to be classified in families sharing common history. Thus, a set of canisters containing the pieces of the old reactor vessel, which was replaced in 1984 was the first challenge, followed by a set of canisters containing residues of instruments only and pieces coming from the top of the control rods of the reactor which were not directly irradiated in the reactor. So far, the two first sets of canisters are being treated and characterized as well as possible. Reporting and official documents have been filled up to comply to Dutch transport regulations and to define waste acceptance criteria for the storage facility. The first transports of containers with Low Level Waste occurred in October 2015, and another transport took place at the end of 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Area V: Waste Management and Subsurface Science (FY21-23 Final Report)

The objective of the Waste Management and Subsurface Science Topic Area V project is to evaluate the feasibility and safety of an intermediate-depth borehole for disposal of Israel Atomic Energy Commission (IAEC) nuclear waste. The IAEC nuclear waste is currently stored in above ground and/or in near-surface facilities that provide short-term radiological worker safety but do not provide long-term, full security and safeguards protection for the nuclear material. Disposal of the IAEC nuclear waste several hundred meters below the surface in a sealed borehole would provide long-term security and safeguards due to its depth underground, as well as long-term radiological safety, due to its isolation in a stable geological formation. This project supports the nuclear security and safeguards initiatives of the Science and Technology Working Group of the NNSA/IAEC Memorandum of Understanding (MOU) and addresses the Topic Area V objective and associated goals. The goals for Topic Area V are: (1) Assess the suitability of the vadose zone in the Yamin Plain of the northern Negev Desert, Israel as a host location for intermediate-depth borehole disposal of radioactive waste, (2) Define and refine the necessary characterization needs to better understand the regional climate, structure, and stratigraphy, geomechanics, geochemistry, hydrogeology, and seismicity of the stratigraphic sequence from the surface to the water table in the vicinity of the proposed host location for the disposal borehole(s), and (3) Develop a preliminary plan and schedule, including necessary resources and costs, for a borehole disposal concept and robust and transparent pre-closure and post-closure safety assessments. The safety assessments will require iteration with process level models at both site and regional scales. Upon completion, the information collected by this effort will allow the IAEC to make decisions regarding the viability and applicability of an intermediate depth (<500m) borehole for disposal in the vadose zone of the Yamin Plain. This FY21-23 final report is provided in lieu of a workshop report that was originally planned for delivery in January, 2024. Due to the conflict in Israel and associated delays, the workshop has been delayed to April 2024. The workshop will be held at LLNL but offsite and will switch to hybrid if travel restrictions remain in place. The associated workshop report will be provided as part of a new FY24-26 LCP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3rd Quarter Transportation Report FY2017 Waste Shipments To and From the Nevada National Security Site (NNSS), Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 3rd quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW), which includes classified LLW and MLLW, classified non-radioactive (CNR) and classified non-radioactive hazardous (CNRH) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2017. Tabular summaries are provided, which include the following: Sources of and carriers for LLW, MLLW and CNR/CNRH shipments to and from the NNSS; Number and external volume of LLW, MLLW and CNR/CNRH shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW, MLLW and CNR/CNRH shipments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Material Circular Efficacy of Waste-Management Scenarios Using PV ICE (PV in the Circular Economy) Tool

To meet the nation’s clean energy needs, it is projected that at least 1 TW of solar photovoltaics (PV) will be installed by 2050. To make this transition to solar energy sustainable, planning for a circular economy that maximizes reuse, repair, and recycle is crucial. The objective of this poster is to evaluate the circular efficacy of waste-management interventions, while considering social factors, using PV ICE, a modeling tool that quantifies future mass flows of PV based on dynamic, real-world data.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resin Liner Recovery and Over-Packing at Ontario Power Generation's Western Waste Management Facility

Spent resins generated from Ontario Power Generation (OPG)'s and Bruce Power's Candu reactor operations are stored at OPG's Western Waste Management Facility in Kincardine, Ontario, Canada. The older resins are contained in 3 m{sup 3} epoxy-coated cylindrical carbon steel containers known as resin liners. The liners are stored in a stacked configuration within cylindrical in-ground containers. Previous studies indicated evidence of unacceptable liner wall corrosion and the potential for eventual leakage of resin from the liners. Based on this, OPG elected to re-package the majority of the resin liners into stainless steel over-packs. A contract for this work was awarded to a project team consisting of Duratek of Canada, Kinectrics, Inc. and E.S. Fox. This paper provides an overall summary of project activities focusing on the effectiveness of the equipment utilized and the soundness of the developed programs, plans and procedures. Specific information is provided on key aspects of the project and the overall achievement of project goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the Idaho National Laboratory Regulated Asbestos Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the Idaho National Laboratory (INL) Regulated Asbestos waste stream is suitable for disposal by shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site (NNSS). The INL Regulated Asbestos waste stream consists of asbestos and asbestos-contaminated debris. The INL Regulated Asbestos waste stream requires an SA to resolve whether it is acceptable to dispose of tritium ( 3 H) at activity concentrations exceeding the NNSS Waste Acceptance Criteria Action Level.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗