AGR-3/4 Compact 10-2 Examination Plan
Examination plan for AGR-3/4 Compact 10-2. Work is to be performed at ORNL.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Examination plan for AGR-3/4 Compact 10-2. Work is to be performed at ORNL.
In response to needs identified by the International Atomic Energy Agency (IAEA) research is underway to develop In-Field Alpha Spectrometry (IFAS) as a method to allow IAEA safeguards inspectors to collect samples of uranium hexafluoride (UF6) at processing facilities to assess and verify uranium enrichment. For sample collection, the IFAS method uses Single-Use Destructive Assay (SUDA) samplers, which contain thin zeolite coatings that trap UF6 gas and convert it to the safer, more stable form uranyl fluoride (UO2F2). For alpha spectrometry, the IFAS instrument employs a large area silicon semiconductor transducer to detect and record alpha particle energy-deposition events. Over the past year optimization work has significantly increased the diameter of useful SUDA samples (from 12.7 mm to 48 mm), improved the manufacturability and reproducibility of SUDA samples, increased the area of the IFAS alpha spectrometer sensor from 1.2 cm to 3.1 cm, and improved source positioning within the IFAS. This paper will report on this optimization work, its impacts on IFAS performance, and future plans for IFAS miniaturization, improvements, and testing.
The Energy Technology Innovation Partnership Project (ETIPP) worked with the Makah Tribe on strategic energy planning, including scoping future energy needs of relocated facilities, understanding the potential for new energy generation options to support current and future energy demand, and supporting communication and capacity-building goals.
The ART-GCR Methods area includes an international collaboration work package that covers the tasks defined for the Computational Methods Validation and Benchmark (CMVB)and Civil Nuclear Energy Research and Development Working Group (CNWG) projects. This report summarizes the status of the FY21 tasks and planned FY22 DOE contributions. The CMVB Project Arrangement (PA) is not yet formally approved by all signatories, and no work has therefore been performed in FY21 at INL related to this activity. The CNWG activities inFY21 consisted of the simulation of the High Temperature Test Reactor (HTTR) Loss Of Forced Cooling (LOFC) experimental with the Idaho National Laboratory (INL) codes Griffin, BISON and RELAP-7 based on the Multiphysics Object-Oriented Simulation Environment (MOOSE).It was found that the multiphysics coupled suite is capable of simulating all the important phenomena occurring during the Depressurized Loss of Forced Cooling (DLOFC) experiments showing promising agreement with the measurements given the number of uncertainties and approximations introduced into the model.
The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of LEU fuels to support the high-performance reactors. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel. The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR. The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-licensed reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification
The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of the high-performance reactors to operate with LEU fuels. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel.The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR.The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-regulated reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 7 4 taken from the Advanced Gas Reactor (AGR) experiment, AGR 3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 8 4 taken from the Advanced Gas Reactor (AGR) experiment, AGR 3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 10 4 taken from the Advanced Gas Reactor (AGR) experiment, AGR 3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.
This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 1-4 taken from the Advanced Gas Reactor (AGR) experiment, AGR-3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 4-1-3 taken from the Advanced Gas Reactor (AGR) experiment, AGR 5/6/7. This work will be performed in accordance with the general objectives outlined in the AGR 5/6/7 PIE Plan and guidance in the ORNL PIE Statement of Work.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 5-6-2 taken from the Advanced Gas Reactor (AGR) experiment, AGR 5/6/7. This work will be performed in accordance with the general objectives outlined in the AGR 5/6/7 PIE Plan and guidance in the ORNL PIE Statement of Work.
The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.
The construction industry faces a growing need for automation to reduce costs, improve accuracy and productivity, and address labor shortages. One area that stands to benefit significantly from automation is panelized prefabricated building envelope retrofits, which can improve a building’s energy efficiency in heating and cooling interior spaces. In this paper, we propose using cable-driven parallel robots (CDPRs), which can effectively lift and handle large objects, to install these panels. However, implementing CDPRs presents significant challenges because of their nonlinear dynamics, complex trajectory planning, and precise control requirements. To tackle these challenges, this work focuses on a new application of established control and trajectory optimization theories in a CDPR simulation of a building envelope retrofit under real-world conditions. We first model the dynamics of CDPRs, highlighting the critical role of damping in system behavior. Building on this dynamic model, we formulate a trajectory optimization problem to generate feasible and efficient motion plans for the robot under operational and environmental constraints. Given the high precision required in the construction industry, accurately tracking the optimized trajectory is essential. However, challenges such as partial observability and external vibrations complicate this task. To address these issues, a Linear Quadratic Gaussian control framework is applied, enabling the robot to track the optimized trajectories with precision. Simulation results show that the proposed controller enables precise end effector positioning with errors under 4 mm, even in the presence of external wind disturbances. Through comprehensive simulations, our approach allows for an in-depth exploration of the system’s nonlinear dynamics, trajectory optimization, and control strategies under controlled yet highly realistic conditions. The results demonstrate the feasibility of CDPRs for automating panel installation and provide insights into their practical deployment.
This report contains a brief overview of the several studies that provide the basis for this work and details the reservoir characterization efforts that have been completed to date. Briefly, geological characterization data suggests that the deep-water reservoirs are the result of the interplay between turbidite depositional systems and salt tectonics. Project Partners have estimated the CO 2 storage capacity associated with saline reservoirs and that associated with CO 2 -Enhanced Oil Recovery (EOR) in the state waters of Louisiana. In addition, Project Partners have conducted a detailed analysis of CO 2 storage potential associated with CO 2 -EOR in the central planning area of the GOM. This work estimates that 3,140 million metric tonnes of CO 2 can be stored in optimal reservoirs of the shallow- and deep-water central GOM. A reduced order modeling and machine learning approach is introduced that will be used to evaluate CO 2 storage capacity and plume dynamics for down-selected, reservoir-specific, saline characterization. Last, a brief discussion establishes how the data presented in this report will support future work.
We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.
High-performance buildings are reliable, cost effective, and sustainable structures that minimize energy and water use, reduce solid waste and pollutant emissions, and limit the depletion of natural resources. High-performance buildings also provide a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) is the nation’s premier nuclear energy research laboratory, the physical infrastructure requires continual updating and repurposing to help accomplish that mission. INL’s infrastructure must incorporate high-performance sustainable design features to be fiscally responsible and reflect an image of innovation to the public and prospective employees. INL is a large consumer of energy with annual energy costs exceeding $16M. This High-Performance and Sustainable Building Strategy will help engineering and construction project teams design sustainable facilities, reduce life cycle operating costs, and support the INL net-zero plan while providing INL employees with a safe and healthy working environment. With these goals in mind, the recommendations described in this document are intended to form INL’s foundation for sustainable and high-performance building standards. This strategy incorporates the latest federal and Department of Energy (DOE) orders and directives, including DOE Order 436.1A, “Departmental Sustainability,” the DOE Sustainability Plan (SP), the INL Site Sustainability Plan (SSP), and Code of Federal Regulations (CFR). This document identifies the requirements of the “Guiding Principles for Sustainable Federal Buildings” (Guiding Principles) and briefly highlights the Leadership in Energy and Environmental Design (LEED) Gold certification. LEED Gold certification can be used to meet many of the requirements of the Guiding Principles.