Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Imaging Station Multi-Foil Target

The Axis II Downstream Transport (DST) of the Dual Axis Radiographic Hydrodynamic Testing (DARHT) Facility is the final subassembly of the particle accelerator whose primary objective is to focus the 4-pulse beam as it enters the Target Region. Before the beam reaches the Target Region, it passes through two imaging stations located in the DST. At Imaging Station E (ISE) and Imaging Station C (ISC), diagnostics are conducted and experimenters study beam physics using specialized targets. Different targets are used depending on the objective of the study. The desire to conduct specific experiments has driven a need for a multi-foil target. This new design has been engineered to allow for new capabilities, and diagnostics to be studied at ISC. To accommodate new parameters, three different configurations have been conceived. Although each of the three designs differ from each other, their function and purpose remain consistent. Each target is engineered to secure a variable amount of target foils at variable spacing while Imaging Station experiments are conducted. Beam diagnostics and data from the targets are analyzed through various sized viewports on the imaging stations. The objective of this technical note is to document the purpose and functionality of the targets. Design considerations, assembly instructions, and maintenance recommendations are also discussed. Additionally, each target and its respective advantages and disadvantages are covered in detail.

43 PARTICLE ACCELERATORS↗

Vibration testing of the JE-M-604-4-IUE rocket motor (Thiokol P/N E 28639-03)

The NASA International Ultraviolet Explorer (IUE) rocket motor (TE-M-604-4), a solid fuel, spherical rocket motor, was vibration tested in the Impact, Vibration, and Acceleration (IVA) Test Unit of the von Karman Gas Dynamics Facility (VKF). The objective of the test program was to subject the motor to qualification levels of sinusoidal and random vibration prior to the altitude firing of the motor in the Propulsion Development Test Cell (T-3), Engine Test Facility (ETF), AEDC. The vibration testing consisted of a low level sine survey from 5 to 2,000 Hz, followed by a qualification level sine sweep and qualification level random vibration. A second low level sine survey followed the qualification level testing. This sequence of testing was accomplished in each of three orthogonal axes. No motor problems were observed due to the imposition of these dynamic environments.

Alt, R. E.↗

Energy Production Demonstrator for Megawatt Proton Beams

A preliminary study of the Energy Production Demonstrator (EPD) concept - a solid heavy metal target irradiated by GeV-range intense proton beams and producing more energy than consuming - is carried out. Neutron production, fission, energy deposition, energy gain, testing volume and helium production are simulated with the MARS15 code for tungsten, thorium, and natural uranium targets in the proton energy range 0.5 to 120 GeV. This study shows that the proton energy range of 2 to 4 GeV is optimal for both a natU EPD and the tungsten-based testing station that would be the most suitable for proton accelerator facilities. Conservative estimates, not including breeding and fission of plutonium, based on the simulations suggest that the proton beam current of 1 mA will be sufficient to produce 1 GW of thermal output power with the natU EPD while supplying < 8% of that power to operate the accelerator. The thermal analysis shows that the concept considered has a problem due to a possible core meltdown; however, a number of approaches (a beam rastering, in first place) are suggested to mitigate the issue. The efficiency of the considered EPD as a Materials Test Station (MTS) is also evaluated in this study.

43 PARTICLE ACCELERATORS↗

Massachusetts Large Blade Test Facility Final Report

Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

17 WIND ENERGY↗

RF generation in the DARHT Axis-II beam dump

We have occasionally observed radio-frequency (RF) electromagnetic signals in the downstream transport (DST) of the second axis linear induction accelerator (LIA) at the dual-axis radiographic hydrodynamic testing (DARHT) facility. We have identified and eliminated some of the sources by eliminating the offending cavities. However, we still observe strong RF in the range 1 GHz t0 2 GHz occurring late in the ~2-μs pulse that can be excited or prevented by varying the downstream tune. The narrow frequency width (<0.5%) and near exponential growth at the dominant frequency is indicative of a beam-cavity interaction, and electro-magnetic simulations of cavity structure show a spectrum rich in resonances in the observed frequency range. However, the source of beam produced RF in the cavity resonance frequency range has not been identified, and it has been the subject of much speculation, ranging from beam-plasma or beam-ion instabilities to unstable cavity coupling.

43 PARTICLE ACCELERATORS↗

Resilient GaN-based Power Module with Improved Diagnostic for Future Accelerator

Los Alamos Neutron Science Center (LANSCE) and Dual-Axis Radiographic Hydrodynamic Test facility (DARHT) play a pivotal role in advancing scientific research and national security initiatives. As a premier facility for neutron science, LANSCE and DARHT provide invaluable insights into fundamental research, materials science, nuclear physics, high-energy physics, material science, and medical imaging. Existing (DC) power supply and pulse modulation technologies used in LANSCE and DARHT face limitations in terms of reliability, maintainability, and diagnostics which hinder the progress of these cutting-edge facilities. By proposing improvements to LANL accelerator facilities’ performance and addressing component failure, we aim to enhance scientific outcomes and minimize disruptions, allowing for more efficient and productive research activities while ensuring the continuity of valuable contributions to the user community. This proposal aims to revolutionize (DC) power supply and pulse power systems for future particle accelerators via the development of a resilient GaN-based power module with improved diagnostic and redundant submodules.

43 PARTICLE ACCELERATORS↗

First Six Dimensional Phase Space Measurement of an Accelerator Beam

This Letter presents the first complete six dimensional phase space measurement of a beam in an accelerator. The measurement was made on the Spallation Neutron Source Beam Test Facility. The data reveal previously unknown correlations in the six dimensional phase space distribution that are not visible in lower dimensionality measurements. Furthermore, the correlations are shown to be intensity dependent.

43 PARTICLE ACCELERATORS↗

Composites Manufacturing Education and Technology Facility Expedites Manufacturing Innovation

The Composites Manufacturing Education and Technology facility (CoMET) at the National Wind Technology Center at the National Renewable Energy Laboratory (NREL) paves the way for innovative wind turbine components and accelerated manufacturing. Available for use by industry partners and university researchers, the 10,000-square-foot facility expands NREL's composite manufacturing research capabilities by enabling researchers to design, prototype, and test composite wind turbine blades and other components -- and then manufacture them onsite. Designed to work in conjunction with NREL's design, analysis, and structural testing capabilities, the CoMET facility expedites manufacturing innovation.

17 WIND ENERGY↗

Developing Sample Management Tools for the Irradiation Test Area (ITA)

The ITA Data Manager (IDM) has been ported from CERN’s Proton Irradiation Facility (IRRAD), where it was used previously as the IRRAD Data Manager (IDM), in order to meet the data management and sample tracking needs of the Irradiation Test Area (ITA), a newly developed facility at Fermilab (launching Fall 2020) operating under the Fermilab Test Beam Facility.

43 PARTICLE ACCELERATORS↗

Accelerated Weathering of Waste Glass at 90°C with the Pressurized Unsaturated Flow (PUF) Apparatus: Implications for Predicting Glass Corrosion with a Reactive Transport Model

The interest in the long-term durability of waste glass stems from the need to predict radionuclide release rates from the corroding glass over geologic time-scales. Several long-term test methods have been developed to accelerate the glass-water reaction [drip test, vapor hydration test, product consistency test-B, and pressurized unsaturated flow (PUF)]. Currently, the PUF test is the only method that can mimic the unsaturated hydraulic properties expected in a subsurface disposal facility and simultaneously monitor the glass-water reaction. PUF tests are being conducted to accelerate the weathering of glass and validate the model parameters being used to predict long-term glass behavior. One dimensional reactive chemical transport simulations of glass dissolution and secondary phase formation during a 1.5-year long PUF experiment was conducted with the subsurface transport over reactive multi-phases (STORM) code. Results show that parameterization of the computer model by combining direct laboratory measurements and thermodynamic data provides an integrated approach to predicting glass behavior over geologic-time scales.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Negative ion beam characterisation in BATMAN by mini-STRIKE: Improved design and new measurements

The ITER project requires additional heating provided by two injectors of neutral beams resulting from the neutralisation of accelerated negative ions. To study and optimise negative ion production, the SPIDER test facility (particle energy 100keV; beam current 50A) is under construction in Padova, with the aim of testing beam characteristics and to verify the source proper operation. The SPIDER beam will be characterised by the instrumented calorimeter STRIKE, whose main components are one-directional carbon fibre carbon composite tiles. Some prototype tiles have been employed in 2012 as a small-scale version (mini-STRIKE) of the entire system to investigate the features of the beam from BATMAN at IPP-Garching. As the BATMAN beamlets are superposed at the measurement position, about 1m from the grounded grid, an actively cooled copper mask is located in front of the tiles; holes in the mask create an artificial beamlet structure. Recently the mini-STRIKE has been updated, taking into account the results obtained in the first campaign. In particular the spatial resolution of the system has been improved by increasing the number of the copper mask holes. Moreover a custom measurement system has been realized for the thermocouple signals and employed in BATMAN in view of its use in SPIDER. The present contribution gives a description of the new design of the system as well as of the thermocouple measurements system and its field test. A new series of measurements has been carried out in BATMAN. The BATMAN beam characterisation in different experimental conditions is presented.

43 PARTICLE ACCELERATORS↗

DETAIL Component Scaling and Methodology Comparison

The purpose of this study was to develop a process to convert input signals from one facility into another by reflecting geometric and environmental settings. The Dynamic Energy Transport and Integration Laboratory (DETAIL) is a research facility in development. Its aim is to emulate the daily interactions among power production industry systems and receive real-time data from those systems as inputs. To convert signals and ensure that the temporal sequences and magnitudes reflect laboratory settings, the ability to scale and project data is essential. To demonstrate this ability, Dynamical System Scaling (DSS) and Hierarchical Two-Tiered Scaling (H2TS) (methodologies that enable systems to scale and project or extrapolate data sets to desired environments while conserving the observed behavior based on first principles) were applied to DETAIL’s thermocline thermal storage system in the Thermal Energy Distribution System (TEDS) facility and solid-oxide electrolysis cell in the High Temperature Hydrogen Electrolysis (HTHE) facility. Both thermocline and electrolysis cell systems were successfully scaled, and test cases were conducted to generate a doubly accelerated energy charge and discharge in reference to past experimental data from the facilities. The research results represented a case for the thermocline system that required signals to be accelerated without altering the stored energy. To enhance the quality of the accelerated data, error propagation analyses were conducted on DSS post-processing terms to determine the consequences of raw-data-associated errors.

08 HYDROGEN↗

3-60B Type-B shipping cask enhanced operational features to facilitate leakage rate testing - 15585

EnergySolutions is fabricating a new 3-60B Type B Shipping Cask that will be ready for use in spring 2015, designed for shipping Type B quantities of activated and/or non-fuel-bearing reactor or accelerator components. EnergySolutions, in consult with Leak Testing Specialists, Inc., has implemented an improved design of the 3-60B cask closures to better facilitate periodic and maintenance leakage rate testing and to allow end users to more easily perform pre-shipment leakage rate testing to confirm proper assembly of the cask closures. A typical Type B cask closure lid design incorporates a double O-ring configuration, where the inner O-ring provides containment and the outer O-ring is used for leakage rate testing of the containment O-ring seal. Leakage rate testing of a double O-ring configuration is typically accomplished by filling the cask cavity with helium, pulling a vacuum on the annular space between the two O-rings and monitoring for helium leakage through the containment O-ring. One issue is the potential for helium saturation of the O-ring elastomeric material, which can result in leakage rate test failures. The cask cavity volume is typically large, and takes a significant amount of time to fill with helium. As a result, the saturation time for certain elastomeric compounds may be exceeded, leading to potential false-negative leakage rate testing results. To avoid this, that the cask cavity typically is loaded with sealed container(s) to reduce the free volume and the fill time. The improved 3-60B cask closure lid incorporates a triple O-ring seal configuration that facilitates maintenance leak rate testing of the closure lid containment O-ring seal and eliminates the issues discussed above. The triple O-ring configuration uses the middle O-ring as the containment seal, with the inner and outer test O-rings creating relatively small annular volumes for testing purposes. These small annular volumes are quick to fill, minimizing the issue of Helium saturation of the O-ring material. This seal configuration also makes it possible to detect and replace a damaged O-ring seal during loading operations, or dress a damaged sealing surface, and perform the required maintenance leakage rate testing of the replacement O-ring at the plant site without the need to unload the cask and send it to a maintenance facility. Also, a second test port has been added to each O-ring annulus to allow leakage rate testing to be accomplished using a formal system calibration that complies with the requirements and recommendations of ASME Section V, Article 10 [4], ANSI N14.5-97 [2], and ANSI N14.5-2014 [3]. This provides a simple, reliable, and accurate means to perform leakage rate testing with a test confidence level that cannot be achieved without the second test port. The improved closure and test port design simplifies and shortens the time required to perform leakage testing, resulting in reduced operating costs, greater schedule security, and dose savings for the cask users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Mapping and Benchmarking of Magnetic Field Codes on the LHD Ion Accelerator

For the validation of the numerical models used for the design of the Neutral Beam Test Facility for ITER in Padua [1], an experimental benchmark against a full-size device has been sought. The LHD BL2 injector [2] has been chosen as a first benchmark, because the BL2 Negative Ion Source and Beam Accelerator are geometrically similar to SPIDER, even though BL2 does not include current bars and ferromagnetic materials. A comprehensive 3D magnetic field model of the LHD BL2 device has been developed based on the same assumptions used for SPIDER. In parallel, a detailed experimental magnetic map of the BL2 device has been obtained using a suitably designed 3D adjustable structure for the fine positioning of the magnetic sensors inside 27 of the 770 beamlet apertures. The calculated values have been compared to the experimental data. The work has confirmed the quality of the numerical model, and has also provided useful information on the magnetic non-uniformities due to the edge effects and to the tolerance on permanent magnet remanence.

43 PARTICLE ACCELERATORS↗

Modeling activities on the negative-ion-based Neutral Beam Injectors of the Large Helical Device

At the National Institute for Fusion Science (NIFS) large-scaled negative ion sources have been widely used for the Neutral Beam Injectors (NBIs) mounted on the Large Helical Device (LHD), which is the world-largest superconducting helical system. These injectors have achieved outstanding performances in terms of beam energy, negative-ion current and optics, and represent a reference for the development of heating and current drive NBIs for ITER.In the framework of the support activities for the ITER NBIs, the PRIMA test facility, which includes a RF-drive ion source with 100 keV accelerator (SPIDER) and a complete 1 MeV Neutral Beam system (MITICA) is under construction at Consorzio RFX in Padova.An experimental validation of the codes has been undertaken in order to prove the accuracy of the simulations and the soundness of the SPIDER and MITICA design. To this purpose, the whole set of codes have been applied to the LHD NBIs in a joint activity between Consorzio RFX and NIFS, with the goal of comparing and benchmarking the codes with the experimental data. A description of these modeling activities and a discussion of the main results obtained are reported in this paper.

43 PARTICLE ACCELERATORS↗

Evolution paths for advanced automation

As Space Station Freedom (SSF) evolves, increased automation and autonomy will be required to meet Space Station Freedom Program (SSFP) objectives. As a precursor to the use of advanced automation within the SSFP, especially if it is to be used on SSF (e.g., to automate the operation of the flight systems), the underlying technologies will need to be elevated to a high level of readiness to ensure safe and effective operations. Ground facilities supporting the development of these flight systems -- from research and development laboratories through formal hardware and software development environments -- will be responsible for achieving these levels of technology readiness. These facilities will need to evolve support the general evolution of the SSFP. This evolution will include support for increasing the use of advanced automation. The SSF Advanced Development Program has funded a study to define evolution paths for advanced automaton within the SSFP's ground-based facilities which will enable, promote, and accelerate the appropriate use of advanced automation on-board SSF. The current capability of the test beds and facilities, such as the Software Support Environment, with regard to advanced automation, has been assessed and their desired evolutionary capabilities have been defined. Plans and guidelines for achieving this necessary capability have been constructed. The approach taken has combined indepth interviews of test beds personnel at all SSF Work Package centers with awareness of relevant state-of-the-art technology and technology insertion methodologies. Key recommendations from the study include advocating a NASA-wide task force for advanced automation, and the creation of software prototype transition environments to facilitate the incorporation of advanced automation in the SSFP.

Healey, Kathleen J.↗

The status of the SNS external antenna ion source and spare RFQ test facility

The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of two accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Field Emission and Consequences as Observed and Simulated for CEBAF Upgrade Cryomodules

High gamma and neutron radiation levels were monitored at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) after installation of new cavity cryomodules and initial test runs in the frame of the ongoing 12 GeV upgrade program. The dose rates scaled exponentially with cavity accelerating fields, but were independent of the presence of an electron beam in the accelerator. Hence, field emission (FE) is the source of origin. This has led to concerns regarding the high field operation (100 MV per cryomodule) in the future 12 GeV era. Utilizing supercomputing, novel FE studies have been performed with electrons tracked through a complete cryomodule. It provides a principal understanding of experimental observations as well as ways to mitigate FE as best as practicable by identification of problematic cavities.

Marhauser, Frank↗