Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous time system estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Real time time-dependent density functional theory using higher order finite-element methods

We present a computationally efficient approach to solve the time-dependent Kohn-Sham equations in real time using higher order finite-element spatial discretization, applicable to both pseudopotential and all-electron calculations. To this end, we develop an a priori mesh adaption technique, based on the semidiscrete (discrete in space but continuous in time) error estimate on the time-dependent Kohn-Sham orbitals, to construct an efficient finite-element discretization. Subsequently, we obtain the full-discrete error estimate to guide our choice of the time step. We employ spectral finite elements along with special reduced order quadrature to render the overlap matrix diagonal, thereby simplifying the inversion of the overlap matrix that features in the evaluation of the discrete time-evolution operator. We use the second-order Magnus operator as the time-evolution operator, wherein the action of the discrete Magnus operator, expressed as exponential of a matrix, on the Kohn-Sham orbitals is obtained efficiently through an adaptive Lanczos iteration. We observe close to optimal rates of convergence of the dipole moment with respect to spatial and temporal discretization, for both pseudopotential and all-electron calculations. We demonstrate a staggering 100-fold reduction in the computational time afforded by higher order finite elements over linear finite elements, for both pseudopotential and all-electron calculations. Further, for similar level of accuracy, we obtain significant computational savings by our approach as compared to state-of-the-art finite-difference methods. Here, we also demonstrate the competence of higher order finite elements for all-electron benchmark systems. Lastly, we observe good parallel scalability of the proposed method on many hundreds of processors.

36 MATERIALS SCIENCE↗

Product Defect Detection System: SYSM- 5620 Final Project

Retail sales is a growing market estimated to up to seven percent year over year. With this growing market there is also a trend in growing rate of retail returns, estimated just last year at $\$$850 billion. Retail stores must ensure that products available for purchase remain safe, undamaged, and acceptable to customers throughout their time in the store. This job exists regardless of the specific solution used because stores are always responsible for preventing damaged or defective products from reaching customers and when they fail to this is categorized under operation inefficiencies which accounts for an estimated $\$$12 billion in returns. When defective items remain on the sales floor, stores may experience increased returns, reduced customer satisfaction, loss of customer trust, and potential safety concerns depending on the product type. As a result, the core job to be done is to identify defective products quickly, remove them from the sales floor before they are purchased, and preserve useful information about the defect so that the store can improve its handling, stocking, and supplier coordination over time. The need for a more reliable process is especially important in high volume retail environments where employees manage large numbers of products across many aisles, shelves, and storage areas. In these settings, manual inspection alone can be inconsistent and difficult to sustain at the individual item level. At the same time, broader retail trends continue to emphasize operational efficiency, product visibility, and improved customer experience, creating an opportunity for more automated and data driven defect detection methods.

42 ENGINEERING↗

Multigrid Reduction in Time for Chaotic Dynamical Systems

As CPU clock speeds have stagnated and high performance computers continue to have ever higher core counts, increased parallelism is needed to take advantage of these new architectures. Traditional serial time-marching schemes can be a significant bottleneck, as many types of simulations require large numbers of time-steps which must be computed sequentially. Parallel-in-time schemes, such as the Multigrid Reduction in Time (MGRIT) method, remedy this by parallelizing across time-steps and have shown promising results for parabolic problems. However, chaotic problems have proved more difficult, since chaotic initial value problems (IVPs) are inherently ill-conditioned. MGRIT relies on a hierarchy of successively coarser time-grids to iteratively correct the solution on the finest time-grid, but due to the nature of chaotic systems, small inaccuracies on the coarser levels can be greatly magnified and lead to poor coarse-grid corrections. Here we introduce a modified MGRIT algorithm based on an existing quadratically converging nonlinear extension to the multigrid Full Approximation Scheme (FAS), as well as a novel time-coarsening scheme. Together, these approaches better capture long-term chaotic behavior on coarse-grids and greatly improve convergence of MGRIT for chaotic IVPs. Further, we introduce a novel low-memory variant of the algorithm for solving chaotic PDEs with MGRIT which not only solves the IVP, but also provides estimates for the unstable Lyapunov vectors of the system. Finally, we provide supporting numerical results for the Lorenz system and demonstrate parallel speedup for the chaotic Kuramoto–Sivashinsky PDE over a significantly longer time-domain than in previous works.

97 MATHEMATICS AND COMPUTING↗

SU-E-J-170: Beyond Single-Cycle 4DCT: Maximum a Posteriori (MAP) Reconstruction-Based Binning-Free Multicycle 4DCT for Lung Radiotherapy

Purpose: Thoracic motion changes from cycle-to-cycle and day-to-day. Conventional 4DCT does not capture these cycle to cycle variations. We present initial results of a novel 4DCT reconstruction technique based on maximum a posteriori (MAP) reconstruction. The technique uses the same acquisition process (and therefore dose) as a conventional 4DCT in order to create a high spatiotemporal resolution cine CT that captures several breathing cycles. Methods: Raw 4DCT data were acquired from a lung cancer patient. The continuous 4DCT was reconstructed using MAP algorithm which uses the raw, time-stamped CT data to reconstruct images while simultaneously estimating deformation in the subject's anatomy. This framework incorporates physical effects such as hysteresis and is robust to detector noise and irregular breathing patterns. The 4D image is described in terms of a 3D reference image defined at one end of the hysteresis loop, and two deformation vector fields (DVFs) corresponding to inhale motion and exhale motion respectively. The MAP method uses all of the CT projection data and maximizes the log posterior in order to iteratively estimate a timevariant deformation vector field that describes the entire moving and deforming volume. Results: The MAP 4DCT yielded CT-quality images for multiple cycles corresponding to the entire duration of CT acquisition, unlike the conventional 4DCT, which only yielded a single cycle. Variations such as amplitude and frequency changes and baseline shifts were clearly captured by the MAP 4DC Conclusion: We have developed a novel, binning-free, parameterized 4DCT reconstruction technique that can capture cycle-to-cycle variations of respiratory motion. This technique provides an invaluable tool for respiratory motion management research. This work was supported by funding from the National Institutes of Health and VisionRT Ltd. Amit Sawant receives research funding from Varian Medical Systems, Vision RT and Elekta.

60 APPLIED LIFE SCIENCES↗

Parallel visualization and analysis with paraview on a Cray XT4

Scientific data sets produced by modern supercomputers like ORNL's Cray XT 4, Jaguar, can be extremely large, making visualization and analysis more difficult as moving large resultant data to dedicated analysis systems can be prohibitively expensive. We share our continuing work of integrating a parallel visualization system, ParaView, on ORNL's Jaguar system and our efforts to enable extreme scale interactive data visualization and analysis. We will discuss porting challenges and present performance numbers. Jaguar is a Cray XT4 with 7,832 compute nodes each with 4 cores and 8GB of memory, located in Oak Ridge, Tennessee. Jaguar is currently ranked No.8 in the Top 500. Jaguar, and other machines like it, enable increasingly larger data sets. Whether scientists are producing extremely massive data or small data they still have a requirement for analysis. Analysis is often difficult for larger data and it is further complicated when the user is distant to the data. Data sets that are too large to ship and/or analyze on a single desktop require a parallel analysis tool and a high performance computer to run on. Running ParaView interactively on Jaguar is a positive improvement for both local and remote users. We have shown that it is feasible for our user at LANL to visualize his simulation data created on jaguar. Local users may face fewer obstacles and get improved performance, due to their higher bandwidth to Jaguar. For future work, we would like to see higher priority queues that enable interactive visualization. A more interactive user-friendly qsub that estimates time to allocation would be very useful. Hopefully, our work will lead to more users attempting interactive visualization on Jaguar, resulting in quicker turnaround times for visualization and analysis. As users migrate to using supercomputing platforms for visualization, we expect future research possibilities in this area.

00↗

Past and future ocean warming

Changes in ocean heat content (OHC) provide a measure of ocean warming, with impacts on the Earth system. This Review synthesizes estimates of past and future OHC changes using observations and models. The top 2,000 m of the global ocean has significantly warmed since the 1950s, gaining 351 ± 59.8 ZJ (1 ZJ = 10 21 J) from 1958 to 2019. The rate of warming increased from <5 to ~10 ZJ yr –1 from the 1960s to the 2010s. Observed area-averaged warming is largest in the Atlantic Ocean and southern oceans at 1.42 ± 0.09 and 1.40 ± 0.09 × 109 J m –2 , respectively, for the upper 2,000 m over 1958–2019. These observed patterns of heat gains are dominated by heat redistribution. Observationally constrained projections suggest that historic ocean warming is irreversible this century, with net warming dependent on the emission scenario. By 2100, projected warming in the top 2,000 m is 2–6 times that observed so far, ranging from 1,030 [839–1,228] ZJ for a low-emission scenario to 1,874 [1,637–2,109] ZJ for a high-emission scenario. The Pacific is projected to be the largest heat reservoir owing to its size, but area-averaged warming remains strongest in the Atlantic and southern oceans. Ocean warming has extensive impacts that pose risks to marine ecosystems and society. Here, the projected changes necessitate a continuation and improvement of observations and models, along with better uncertainty estimation.

54 ENVIRONMENTAL SCIENCES↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Continuous snow depth and temperature measurements from dense network of above-ground distributed temperature profiling systems from 2021-09-23 to 2024-08-23, Seward Peninsula, Alaska

The dataset contains temperature measurements from distributed temperature profiling (DTP) systems (Dafflon et al., 2022; Wielandt et al., 2022; Wang et al., 2024a; Fiolleau et al., 2024) deployed vertically above the ground surface at a large number of locations from 2021 to 2024. The research is designed to improve understanding of the local heterogeneity in snow depth and snow thermal insulation dynamics, as well as their interactions in a discontinuous permafrost region (Wang et al., 2025). The DTP systems were deployed at 96 locations in a watershed along the Nome-Teller road at mile marker 27 (T27) and at 54 locations on a hillslope along the Kougarok road at mile marker 64 (K64) in the Seward Peninsula, Alaska. The probe location information is stored in Probe_locations_T27.csv and Probe_locations_K64.csv. Temperature measurements were recorded at 15-minute intervals using high-precision digital sensors (accuracy: ±0.1°C, resolution: 0.0078°C). The temperature probes, either 1.4 m or 1.6 m long, contain sensors spaced every 5 cm or 10 cm along their length. The temperature data are stored in compressed files following the format: DTP_snow_air_temperature_(site)_(start)_(end).zip, where site is either T27 or K64, and start and end represent the time series period. Within each ZIP file, individual CSV files are named by probe ID and contain temperature records at different heights above the ground surface.This dataset also includes derived snow depth time series over three snow seasons, estimated from temperature measurements. Snow depth was estimated by identifying the consecutive sensor pair that exhibited the largest drop in high-frequency temperature fluctuations (detailed in the methods). These data are stored in: Snow_depths_flags_(site)_(start)_(end).csv, which includes snow depth time series and corresponding quality flags (defined in the methods) from different probes. Additionally, the dataset includes derived metrics and supporting measurements at selected locations over two snow seasons, contributing to the manuscript of Wang et al., 2025. These locations were chosen based on the availability of high-quality snow depth time series during both seasons. The additional data include: (1) Air temperature proxies measured from the top sensors on the pole when they were not buried by snow, stored in Air_temperature_proxies_(site)_(start)_(end).csv (2) Ground interface temperature, recorded at 3 cm above the ground, stored in Ground_interface_temperature_(site)_(start)_(end).csv (3) Site characteristics, including vegetation height, elevation, and the topographic position index (TPI) within a 50 m radius, stored in Selected_probe_locations_gps_vegheight_tpi_elevation_(site).csv. These metrics were derived from 1 m resolution summer LiDAR-based digital elevation models and digital surface models from Singhania et al., 2023, DOI:10.5440/1832016. Metadata files include data descriptions (_dd.csv) for tabular data. All included files are listed and described in xxxx_flmd.csv.This dataset is an updated version of a previous archive (Wang et al., 2024b, DOI: 10.15485/2475020), incorporating multiple seasons and improved snow depth estimation. Please note that due to large amount of information present in this dataset, many specificities associated with the acquisition of snow temperature, air temperature proxy and estimation of snow depth, and the future archiving of additional datasets on the soil temperature, thaw depth and soil characteristics at these locations, the author would welcome being contacted by people planning to use this dataset.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska.Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Integration of Nuclear Material Accounting Data and Process Monitoring Data for Improvement on Detection Probability in Safeguarding Electrochemical Processing Facilities (Final Technical Report)

The KAERI advanced spent fuel conditioning process (ACP) process is a critical component of the US- South Korean nuclear cooperation and the following “123 Agreement.” Its development has received considerable attention in both countries. The ACP is an electrochemical processing (pyroprocessing) that recycles over 96% of the used nuclear fuel (UNF). It is also intrinsically proliferation-resistant in theory. In normal operation, the U/TRU product is very hot radiologically. In addition, the Cm provides a high level of spontaneous neutrons, making the product unsuitable for weapon use. However, as pointed in some study, “the need for safeguards to protect against the diversion and misuse of separated plutonium applies essentially equally to all grades of plutonium.” As pointed by many studies, the well-established traditional Nuclear Material Accounting (NMA) approach cannot be directly applied to electrochemical processing because of the lack of an input accountability tank, the non-continuous material flow, and the unsatisfactory level of confidence in sampling methods. Therefore, nuclear safeguards remain a grand challenge in the developing of commercial electrochemical separations facilities, especially around the heart of such facilities, the electrorefiner (ER) systems. In contrast to NMA data, process monitoring (PM) data is normally an indirect measurement of the SNM and is acquired much more frequently. In a broad sense, PM includes monitoring by various types of equipment, e.g. radiation detectors, cameras, voltage, current sensors. Because it is already being collected by the operator, the additional cost to safeguards is low. It has long been believed that PM data can supplement NMA data and help improve safeguards, although the benefits are hard to quantify. The U.S. DOE’s Material Protection, Accounting, and Control Technology (MPACT) campaign has made substantial investments into innovative PM sensor technology and predictive model development for real- or near real-time measurement and prediction of molten salt density and level, salt composition and actinide concentration especially Pu, the cell voltage, and the cell current to supplement traditional NMA. For aqueous-based reprocessing facilities, it is reported that PM, integrated with traditional NMA, have a high detection probability for specific diversions. For electrochemical reprocessing, preliminary studies have shown that PM data can support traditional NMA in various ways by providing a basis to estimate some of the in-processing nuclear material inventories. Despite early success, further studies on fusion of PM data and NMA data are still needed, which is the goal of this proposed work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Energy Efficient Clothes Dryer with IR Heating and Electrostatic Precipitator

The project goal was to develop a revolutionary energy saving technology for residential clothes drying. The team developed an IR (infrared) heating system and NESP (Nebulizer and Electro-Static Precipitator) for integration into a ventless clothes dryer. The proposed technology addresses two of the major inefficiencies in current electric vented dryers by providing effective energy transfer for the removal of the water and recapture of the vapor latent heat. The IR heaters operating in the mid wave (2.5-10um) are very efficient as they target the 3-micron peak absorption of the water molecule. This allows direct energy absorption, unlike conventional element heaters where heat is transferred by convection. The low power NESP removes water vapor from the exhausted stream and recaptures the latent heat in the ESP (Electro-Static Precipitator) exchanger section. This allows the warm dry air to be recirculated back into the drum for additional efficiency savings. The remaining majority of the dryer hardware stays the same. Summing the efficiency gain from the two subcomponents we anticipated the EF (Efficiency Factor) to exceed the goal of 4.04. EF is obtained by dividing the weight (lbs) of water removed by the energy (kWhr) used, where the test load size is 8.45 lbs of bone dry clothing wetted to 57.5% or 4.8lbs of water, and dried to a remaining moisture content of 2.5-5%. Additional benefits include not having to recondition (heat or cool) the large amounts of make-up air to replace the air exhausted by a vented dryer. It was anticipated that the NESP/heat exchanger would be the most challenging and highest risk element in the program. Therefore, the team focused their efforts during Phase 1 of the program on the design, construction, testing, and optimization of the NESP/heat exchanger. At the end Phase 1, the team compared the performance of the NESP/heat exchanger with the system level requirements and made a Go/No-Go decision on proceeding with the second portion of the program. Phase 2 of the program was structured to develop the IR heating system and then integrate it and the NESP/heat exchanger into a residential clothes dryer prototype for final testing. The proposed technology utilizes heat recovery which is known to have the biggest impact on dryer efficiency. The two current mainstream recovery approaches are air to air exchangers and heat pump condenser systems. Air to air exchanges can be very efficient but require large surface areas which are prone to fouling from uncaptured lint. Dryers based on heat pump condenser recovery systems have shown efficiency improvements of 20–60% and are commercially available. The issue with a heat pump condenser approach is the added cost, as typical prices are twice that of standard vented dryers and they are only available in small to medium capacities. The energy factor (EF) for these systems is 5.50 to 6.88 pounds/kWh compared to conventional dryers at 2.75 to 3.67 pounds/kWh. The efficiency improvements for the proposed technology come from the use of IR heating and the NESP. As the concept is in its infancy, and these improvements were difficult to predict without experimental data, assumptions were made based on available literature. IR radiant drying times, when compared to convection, are typically 30% less. This is a result of the fact that radiant energy heats directly and is absorbed at and below the surface, unlike convection heating, that must conduct the heat through the boundary film of air at the clothes surface and rely on wicking of the moisture to the surface. The second area of improvement comes from the NESP. The NESP operation is as follows: 1. Highly charged, micron sized, droplets of water are injected into the dryer exhaust by the Nebulizer. 2. These charged droplets attract water molecules and continue to grow in size, until losing their charge. During this process, latent heat is rejected back into the air stream. 3. The large droplets enter the ESP, where they are recharged and drawn to the ESP wall, to be extracted at the bottom of the ESP. The warm dry air is then recirculated back into the dryer. The proposed technology, at the time of the proposal submission was estimated to have an EF of 4.79. At program completion we have designed, built, tested, integrated and optimized the proposed technologies into a prototype “high efficiency” residential clothes dryer. Testing of the integrated prototype dryer provided insight into the technical effectiveness and economic feasibility of the proposed technologies. The program has the potential of greatly impacting energy savings. The predicted EF of the proposed technology is 4.79, yielding an energy savings of 42% when compared to conventional electric vented dryers. Given there are approximately 84 million dryers in the US consuming ~64 billion kWh per year, a net savings of 27 billion kWh per year or 0.092 quads could be realized. Since the dryer is not vented, make up air from the room is not needed, adding an additional savings of ~1kWh per load, or 23.8 billion kWh per year. In addition, it is envisioned that the proposed ESP, when successful, would potentially find applications in industrial and residential dehumidification.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Constructing the Pareto front for multi-objective Markov chains handling a strong Pareto policy approach

In this paper, we present a multi-objective solution of the Pareto front for a certain class of discrete-time ergodic controllable Markov chains. For solving the problem, we transform the original multi-objective problem into an equivalent nonlinear programming problem implementing the Lagrange principle. We then propose to adopt the Tikhonov’s regularization method to ensure the convergence of the cost functions to a unique point into the Pareto front. We show that Pareto policies are characterized as optimal policies. One of the fundamental problems related to the construction of the Pareto front is the existence and characterization of both, Pareto and strong Pareto policies. By introducing the Tikhonov’s regularizator, we ensure the existence of strong Pareto policies. This paper proposes a real solution to this problem. We formulate the original problem considering several constraints: (a) we employ the c-variable method for the introduction of linear constraints over the nonlinear problem and (b) restrict the cost functions, allowing points in the Pareto front to have a small distance from one another. The constraints imposed by the c-variable method make the problem computationally tractable and the restriction imposed by the small distance change ensures the continuation of the Pareto front. The resulting equation in this nonlinear system is an optimization problem for which the necessary and efficient condition of a minimum is solved using the projected gradient method. Moreover, we also prove the convergence conditions and compute the estimate rate of convergence of variables corresponding to the Lagrange principle and the Tikhonov’s regularization, respectively. We provide all the details needed to implement the proposed method in an efficient way. The usefulness of the method is successfully demonstrated by a numerical example.

97 MATHEMATICS AND COMPUTING↗

Development of an In-Situ Leaching Technology for Extracting Residual Uranium from Remediated Soil - 20099

Site-specific chemical solutions for extracting uranium were developed and evaluated for treating previously remediated soil at a former thorium mill tailings site, known as the Former Rare Earths Facility (REF), in West Chicago, Illinois. Prior remediation efforts had resulted in residual sand and gravel aggregate that met the soil cleanup standards. The target soil contains residual levels of uranium, which continues to leach into the site groundwater at levels exceeding groundwater protection standards (GWPS). A series of bench-scale tests were conducted to evaluate the efficacy and viability of in-situ leaching (ISL) technology to treat the target soil for the purposes of attaining uranium GWPS at the REF. Specific objectives of the bench-scale tests entailed identification and selection of optimal leaching, quantification of the extent and rate of uranium released as a function of chemical composition, chemical concentrations, chemical residence times, and obtaining critical data to estimate treatment costs. A combination of sodium bicarbonate and sodium carbonate reagent was the most effective leaching solution. In general, leaching solutions containing a higher concentration of sodium carbonate demonstrated superior uranium leaching capabilities. Removal of 50% of the uranium mass from the soil matrix was adequate for achieving compliance with the site-specific GWPS. After six to seven pore volume flushes (PVFs), the uranium leaching effectiveness of all leaching solutions was similar. The amount of initial uranium removed with each subsequent PVF was minimal, suggesting limited solubility of the remaining mass of uranium. The effects of leaching duration were significant and persisted through at least the first five consecutive PVFs. Leaching of uranium also resulted in leaching of several non-uranium constituents, many of which exceeded applicable National Pollutant Discharge Elimination System (NPDES) standards. Given historical operations and waste disposal practices at the site, leaching of non-uranium constituents was expected. Hydrochloric acid was used to stabilize treated soil. Savings of approximately $148 million in direct and indirect remediation costs are expected with an ISL alternative compared to the excavation and landfill disposal remediation option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium from Seawater Cost Analysis: Recent Updates

While it is not meant to be a direct competitor with conventionally mined uranium, seawater uranium has significant potential to sway policy makers and the public toward the long term viability of nuclear power. Given the large mass of uranium contained within the ocean and its continual replenishment by freshwater run-off and the ocean floor, seawater uranium can be considered for all practical purposes a renewable resource. In addition to this assurance of supply security placing nuclear power on equal footing with other renewable energy generation technologies, seawater uranium removes a key uncertainty by establishing a cost ceiling on uranium based fuels. Given the evolving nature of this technology, this paper aims to provide an update of the economic model to reflect recent progress. This analysis will reference a passive collection system currently under development by Oak Ridge and Pacific Northwest National Labs. This system consists of a polymer modified to contain amidoxime functional groups, a ligand with high uranium affinity. The adsorbing material is then braided into long segments so it may be moored to the bottom of the ocean where it passively collects uranium for a period on the order of weeks to months. Upon completion of its soaking campaign adsorbent is winched to the surface by work boats so the uranium may be eluted off the braids. After a chemical rinse the braids may then be redeployed for another soaking campaign and uranium elution. The adsorbent can be redeployed as many times as is economically feasible, which is a function of the degradation the material suffers upon each reuse. Noteworthy experimental progress has tightened the gap separating estimates of the optimistic and pessimistic case uranium production cost relative to the most recent analysis. It has been demonstrated before that significant uncertainty in adsorbent performance, and thus recovery cost, arises primarily from variability in adsorbent degradation upon reuse and the effects of marine biofouling on uptake. While the underlying recovery mechanism remains, significant changes have been made regarding the method of adsorbent synthesis, propagating to improvements in adsorbent durability. Additionally, further experimentation regarding the area of marine biofouling has tightened the range of expected adsorbent performance when placed in true marine conditions.

07 ISOTOPE AND RADIATION SOURCES↗

DART-PFLOTRAN: An ensemble-based data assimilation system for estimating subsurface flow and transport model parameters

Ensemble-based Data Assimilation (EDA), based on the Monte Carlo approach, has been effectively applied to estimate model parameters through inverse modeling in subsurface flow and transport problems. However, implementation of EDA approach involves a complicated workflow that include setting up and executing ensemble forward model simulations, processing observations and model simulation results for parameter updates, and repeat for sequential or iterative EDA. To facilitate the management of such workflow and lower the barriers for adopting EDA-based parameter estimation in subsurface science, we develop a generic software frame-work linking the Data Assimilation Research Testbed (DART) with a massively parallel subsurface FLOw and TRANsport code PFLOTRAN. The new DART-PFLOTRAN leverages both the core data assimilation engines in DART and the computational power afforded by PFLOTRAN. In addition to the standard smoother and filtering options, DART-PFLOTRAN enables an iterative EDA workflow based on the Ensemble Smoother for Multiple Data Assimilation method (ES-MDA) to improve estimation accuracy for nonlinear forward problems. Here, we verify the implementation of ES-MDA in DART-PFLOTRAN using two synthetic cases designed to estimate static permeability and dynamic exchange fluxes across the riverbed, respectively, from continuous temperature measurements made across a depth profile. One-dimensional hydro-thermal simulations are performed in both cases to relate temperature responses with the parameters of interest. In the case of estimating dynamic parameters, we demonstrate the flexibility of DART-PFLOTRAN in automating sequential ES-MDA workflow, which will significantly reduce the time researchers spend on managing complex workflows in similar applications. Both studies yield accurate estimations of the parameters compared to their synthetic truth, while ES-MDA leads to more accurate estimation when a high level of nonlinearity exist between observed responses and unknown parameters. With a code base in Python and Fortran, DART-PFLOTRAN paves the way for applications in large-scale subsurface inverse modeling by automating the complex workflow of sequential ES-MDA that can be executed on various computing platforms.

97 MATHEMATICS AND COMPUTING↗

Magnetostatic focal spot correction for x-ray tubes operating in strong magnetic fields using iterative optimization

Purpose: Combining x-ray fluoroscopy and MR imaging systems for guidance of interventional procedures has become more commonplace. By designing an x-ray tube that is immune to the magnetic fields outside of the MR bore, the two systems can be placed in close proximity to each other. A major obstacle to robust x-ray tube design is correcting for the effects of the magnetic fields on the x-ray tube focal spot. A potential solution is to design active shielding that locally cancels the magnetic fields near the focal spot. Methods: An iterative optimization algorithm is implemented to design resistive active shielding coils that will be placed outside the x-ray tube insert. The optimization procedure attempts to minimize the power consumption of the shielding coils while satisfying magnetic field homogeneity constraints. The algorithm is composed of a linear programming step and a nonlinear programming step that are interleaved with each other. The coil results are verified using a finite element space charge simulation of the electron beam inside the x-ray tube. To alleviate heating concerns an optimized coil solution is derived that includes a neodymium permanent magnet. Any demagnetization of the permanent magnet is calculated prior to solving for the optimized coils. The temperature dynamics of the coil solutions are calculated using a lumped parameter model, which is used to estimate operation times of the coils before temperature failure. Results: For a magnetic field strength of 88 mT, the algorithm solves for coils that consume 588 A/cm{sup 2}. This specific coil geometry can operate for 15 min continuously before reaching temperature failure. By including a neodymium magnet in the design the current density drops to 337 A/cm{sup 2}, which increases the operation time to 59 min. Space charge simulations verify that the coil designs are effective, but for oblique x-ray tube geometries there is still distortion of the focal spot shape along with deflections of approximately 3 mm in the radial and circumferential directions on the anode. Conclusions: Active shielding is an attractive solution for correcting the effects of magnetic fields on the x-ray focal spot. If extremely long fluoroscopic exposure times are required, longer operation times can be achieved by including a permanent magnet with the active shielding design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Decommissioning of the Austrian 10 MW Research Reactor, Results and Lessons learned Paper

After the decision to shut down the 10 MW ASTRA-MTR Research Reactor was reached in May 1998, the possible options and required phases for decommissioning and removal of the radioactive components were evaluated in a decommissioning study. To support the decisions at each phase, an estimate of the activity inventory in the various parts of the reactor and the waste volume to be expected was performed. Of the possible options an immediate dismantling to phase 1 of IAEA Technical Guide Lines after the immediately following, continued dismantling to phase 2 of these guide lines was identified as the most reasonable and under the auspices optimum choice. The actual decommissioning work on the ASTRA-Reactor began in January 2000 after its final shutdown on July 31, 1999. Preliminary evaluations of the activity inventory gave an estimated amount of 320 kg of intermediate level waste, of about 60 metric tons of contaminated and another 100 metric tons of activated low level radioactive waste. The activities were roughly estimated to be at 200 TBq in the intermediate level and 6 GBq in the low level. The structure of the decommissioning process was decided against cost-, time- and risk-optimization following the basic layout of the main tasks, e.g. the removing of the fuel, the recovering and the treatment of the intermediate level activities in the vicinity of the core, the handling and conditioning of the neutron exposed graphite and the Beryllium-elements. As an example, the dismantling of approx. 1400 metric tons of the biological shield is described in more detail from the determination of the dismantling technique to the clearing procedures and the deposition. The process of dismantling of the biological shield is presented in fast motion. The dismantling of the pump-room installations of the primary loop, the processing of the contaminated or activated metals, the dismantling of the ventilation system and the radiological clearance of the reactor building was done under optimized conditions and is explained in the following. Spent fuel was generally delivered to the US Department of Energy - DOE in several shipments over the operational time of the ASTRA reactor. With the last shipment in May 2001 all the remaining spent fuel elements out of the ASTRA reactor consignment were transferred to DOE. To reduce waste from concrete shielding, German regulations Dt.StrSchV, annex IV, table 1, two clearance values referring to 'clearance restricted for permanent deposit' and to a clearance for unrestricted re-use were used. In order to reduce the amount of an estimated 60 tons of slightly contaminated metals, it was determined that introducing re-melting procedures were the most economical way. To obtain radiological clearance of the reactor building, compliance with the release limits according to Austrian Radiation Protection Ordinance had to be proved to the regulatory body. There, in general, the limits for unrestricted release were defined as a maximum dose rate of 10 {mu}Sv effective for an individual person per year. The results of the regular yearly medical examinations of the staff indicated no influence of the work related to decommissioning. The readings of the personal dosimeters over the entire project amounted to a total of 85.6 mSv, averaging to 1.07 mSv per year and person. After finishing the decommissioning process, the material balance showed 89.6 % for unrestricted reuse, 6.6 % for conventional mass-dumping and 3.8 % of ILW and LLW. The project was covered by an extensive documentation. All operations within NES followed ISO 9000 quality insurance standards. Experiences and knowledge were presented to and shared with the community, e.g. AFR and IAEA throughout the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A framework to measure the properties of intergalactic metal systems with two-point flux statistics

ABSTRACT The abundance, temperature, and clustering of metals in the intergalactic medium are important parameters for understanding their cosmic evolution and quantifying their impact on cosmological analysis with the Ly α forest. The properties of these systems are typically measured from individual quasar spectra redward of the quasar’s Ly α emission line, yet that approach may provide biased results due to selection effects. We present an alternative approach to measure these properties in an unbiased manner with the two-point statistics commonly employed to quantify large-scale structure. Our model treats the observed flux of a large sample of quasar spectra as a continuous field and describes the one-dimensional, two-point statistics of this field with three parameters per ion: the abundance (column density distribution), temperature (Doppler parameter), and clustering (cloud–cloud correlation function). We demonstrate this approach on multiple ions (e.g. ${\rm C\, \small {\rm IV}}$ , ${\rm Si\, \small {\rm IV}}$ , and ${\rm Mg\, \small {\rm II}}$ ) with early data from the Dark Energy Spectroscopic Instrument (DESI) and high-resolution spectra from the literature. Our initial results show some evidence that the ${\rm C\, \small {\rm IV}}$ abundance is higher than previous measurements and evidence for abundance evolution over time. The first full year of DESI observations will have over an order of magnitude more quasar spectra than this study. In a future paper, we will use those data to measure the growth of clustering and its impact on the Ly α forest, as well as test other DESI analysis infrastructure such as the pipeline noise estimates and the resolution matrix.

79 ASTRONOMY AND ASTROPHYSICS↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗