Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

PV Stormwater Management Research and Testing (PV-SMaRT) (Final Technical Report)

The objective of the Photovoltaic Stormwater Management Research and Testing (PV-SMaRT) project was to develop and disseminate research-based, solar-specific resources for estimating stormwater runoff at ground-mounted PV facilities and detail stormwater management and water quality best practices. The intended use of stormwater management and water quality best practices and stormwater runoff estimation resources is to reduce balance of system soft costs associated with stormwater infrastructure requirements and improve water quality through research-tested best practices. Currently, stormwater regulations and guidelines vary by jurisdiction and can lead to regulatory uncertainty and increased compliance costs for managing stormwater runoff at solar sites. To address these concerns, the NREL team and its partners (University of Minnesota, Great Plains Institute, and Fresh Energy) established and engaged an advisory Water Quality Task Force (WQTF); conducted field research on stormwater infiltration and runoff at five ground-mounted PV sites; validated a 3-D hydrologic model to predict water runoff and generate stormwater runoff coefficients for a range of site conditions and PV designs; developed a stormwater management and water quality best practices document; and engaged with local jurisdictions and other stakeholders to disseminate best practices, stormwater runoff coefficients, and other tools. Key outputs of this project were a PV-SMaRT Runoff Calculator developed by University of Minnesota, a webinar detailing project outcomes and how to use the PV-SMaRT runoff calculator, and a document on Best Practices for regulators and developers regarding stormwater runoff at PV sites.

14 SOLAR ENERGY↗

Scaling for Nuclear Reactor System: Overview

A scaling analysis is essential for predicting the behavior of a reactor system under various operating conditions, as well as for ensuring safe and reliable experimentation and adequate dataset generation for supporting the system code model development and assessment in accordance with USNRC guidelines 1.203. Testing and modeling can be carried out at various scales, from small test units to full-scale reactors, to validate the predictions produced by the analysis. However, due to the cost and challenges associated with full-scale testing, the nuclear industry uses scaled test facilities—integral effect test (IET) and separate effect test (SET)—to identify potential design issues and optimize the design to ensure regulatory compliance for safer operation and anticipated accident management. In general, IET facilities are non-nuclear thermal hydraulics test facilities. In contrast, SET facilities can be non-nuclear testing (e.g., steam generator, containment, pump system SETs) and nuclear testing (mostly fuel-material irradiation testing). IETs are used to study the system-level thermal-hydraulic behavior of the reactor coolant system (RCS) under different anticipated operational occurrences (AOOs) and design basis accidents (DBAs) such as loss-of-coolant-accident (LOCA) and loss-of-power (i.e., station blackout) and loss-of-flow (i.e., failure of RCS pump). Several LOCA scenarios could happen in reactor DBAs, such as main steam line break (MSLB), SG tube rapture (SGTR), break in direct vessel injection (DVI), and other small breaks LOCA. Scaling analysis determines the appropriate size and operating conditions for the test facility. This involves analyzing the system's thermal-hydraulic behavior at different scales and identifying the key parameters that affect the thermal-hydraulic behavior of the reactor. These key parameters can be identified so that the scaled facility can replicate the expected conditions in a prototypical setting. The scaled facility can simulate the same flow rates, pressure gradients, heat transfer coefficients, and fluid properties as the prototype. Scaling analysis is used to ensure that the results from these tests can be scaled up to predict the behavior of a full-scale prototype with an acceptable range of scaling distortions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Deep Space Network equipment performance, reliability, and operations management information system

The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

discrepancy reporting DSN operations web-based too↗

Food and waste management biotechnology for the space shuttle

Space-crew facilities for preparation, eating, personal hygiene and waste management are contained in one small area of the Shuttle Orbiter Mid-Deck, all the functional systems being interconnected. The paper discusses three major systems: (1) the Galley, which includes the personal hygiene station and food packages; (2) the Waste Collector, which includes provisions for male and female users, urine, feces and emesis collection in both a normal and contigency mode of operation; and (3) Biowaste Monitoring, which includes mass measurement and sampling. The technology improvement continues by assuring that the Orbiter systems have sufficient design flexibility to permit later improvements in operation and in function.

Murray, R. W.↗

Aeronautical Facilities Catalogue. Volume 1: Wind Tunnels

Domestic and foreign wind tunnel facilities are enumerated and their technical parameters are described. Data pertinent to managers and engineers are presented. Facilities judged comparable in testing capability are noted and grouped together. Several comprehensive cross-indexes and charts are included.

Penaranda, F. E.↗

Monitoring and Testing the Parts Cleaning Stations, Abrasive Blasting Cabinets, and Paint Booths

I have the opportunity to work in the Environmental Management Office (EMO) this summer. One of the EMO's tasks is to make sure the Environmental Management System is implemented to the entire Glenn Research Center (GRC). The Environmental Management System (EMS) is a policy or plan that is oriented toward minimizing an organization's impact to the environment. Our EMS includes the reduction of solid waste regeneration and the reduction of hazardous material use, waste, and pollution. With the Waste Management Team's (WMT) help, the EMS can be implemented throughout the NASA Glenn Research Center. The WMT is responsible for the disposal and managing of waste throughout the GRC. They are also responsible for the management of all chemical waste in the facility. My responsibility is to support the waste management team by performing an inventory on parts cleaning stations, abrasive cabinets, and paint booths through out the entire facility. These booths/stations are used throughout the center and they need to be monitored and tested for hazardous waste and material. My job is to visit each of these booths/stations, take samples of the waste, and analyze the samples.

Jordan, Tracee M.↗

Hillsborough County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Hillsborough County used the Clear Sky Decision Support Toolkit to analyze solar + storage as an additional resiliency feature at its Brandon Support Operation Complex (BSOC). During normal operations, the BSOC houses water utility administration services and workspaces for water and wastewater engineers, facilities maintenance, and environmental management staff. During emergency management activation, the BSOC serves as an emergency hub for Emergency Support Function 3 (ESF-3), which includes public utilities, public works, and engineering staff support members. The BSOC is designated as a critical facility by the County.

14 SOLAR ENERGY↗

Valuation of pollination services from habitat management: a case study of utility scale solar energy facilities in the United States

Creating and maintaining pollinator habitats following the ecological infrastructure concept in degraded or unutilized land, such as solar energy facilities, is a practical way to synergistically advance the food, energy, and ecology nexus. Given the large land-use requirements for solar farming—the fastest growing renewable energy technology–considerable attention has been focused on strategies to maximize multiple ecosystem services. In this study, we coupled the principles of agronomy and ecology with economics and integrated national-scale data on crops, pollinators, and solar facilities to identify locations for creating pollinator habitats and estimating the economic value of pollination from the habitats. We examined opportunities for pollination services from pollinator-friendly utility-scale solar facilities adjacent to 42 million hectares of pollination-dependent crops in the conterminous United States at high resolution of 1 ha. We used the net income method to estimate the potential economic value of creating habitat in the land adjacent to solar facilities in the eight states with the greatest number of solar installations. Creating pollinator habitats at the 217 utility-scale solar facilities in these states could support adjacent 80,000 hectares of high pollinator dependent crops, which could potentially generate a pollination value of $\$$120 to $\$$264 million USD. The location-specific information and high-resolution maps generated for the United States demonstrate integration of grey and green infrastructure to support the food, energy, and environment nexus.

14 SOLAR ENERGY↗

Knowledge-based image data management - An expert front-end for the BROWSE facility

An intelligent user interface being added to the NASA-sponsored BROWSE testbed facility is described. BROWSE is a prototype system designed to explore issues involved in locating image data in distributed archives and displaying low-resolution versions of that imagery at a local terminal. For prototyping, the initial application is the remote sensing of forest and range land.

Stoms, David M.↗

E- Area Low-Level Waste Facility Multitiered Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E- Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit (DU) options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA)issued back in 2008, along with several subsequent supporting Special Analyses (SA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The NASA Heliophysics Active Final Archive at the Space Physics Data Facility

The 2009 NASA Heliophysics Science Data Management Policy re-defined and extended the responsibilities of the Space Physics Data Facility (SPDF) project. Building on SPDF's established capabilities, the new policy assigned the role of active "Final Archive" for non-solar NASA Heliophysics data to SPDF. The policy also recognized and formalized the responsibilities of SPDF as a source for critical infrastructure services such as VSPO to the overall Heliophysics Data Environment (HpDE) and as a Center of Excellence for existing SPDF science-enabling services and software including CDAWeb, SSCWeb/4D Orbit Viewer, OMNIweb and CDF. We will focus this talk to the principles, strategies and planned SPDF architecture to effectively and efficiently perform these roles, with special emphasis on how SPDF will ensure the long-term preservation and ongoing online community access to all the data entrusted to SPDF. We will layout our archival philosophy and what we are advocating in our work with NASA missions both current and future, with potential providers of NASA and NASA-relevant archival data, and to make the data and metadata held by SPDF accessible to other systems and services within the overall HpOE. We will also briefly review our current services, their metrics and our current plans and priorities for their evolution.

McGuire, Robert E.↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

SSC OCIO, IT SUMMIT 2011

The Stennis Space Center (SSC) Records Retention Facility is a centralized location for all SSC records, Records Management staff, and the SSC History Office. The building is a storm resistant facility and provides a secure environment for records housing. The Records Retention Facility was constructed in accordance with The National Archives and Records Administration (NARA) requirements for records storage, making it the first NARA compliant facility in the agency. Stennis Space Center's Records Retention Facility became operational in May 2010. The SSC Records Retention Facility ensures that the required federal records are preserved, managed and accessible to all interested personnel. The facility provides 20,000 cubic feet of records storage capacity for the purpose of managing the centers consolidated records within a central, protected environment. Records housed in the facility are in the form of paper, optical, film and magnetic media. Located within the SSC Records Retention Facility, the Records Management Office provides comprehensive records management services in the form of: a) Storage and life-cycle management of inactive records of all media types; b) Digitizing/scanning of records and documents; c) Non-textual/digital electronic records media storage, migration and transfer; d) Records Remediation.

Cottrell, Dinna L.↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARM Aerial Instrument Workshop Report

The mission of the U.S. Department of Energy’s (DOE) Biological and Environmental Research (BER) program is to “support transformative science and scientific user facilities to achieve a predictive understanding of complex biological, earth, and environmental systems for energy and infrastructure security, independence, and prosperity.” (https://science.osti.gov/ber) Aligned with the BER central mission, the Earth and Environmental Systems Sciences Division (EESSD) plays a vital role in supporting the fundamental research to understand and predict Earth’s climate and environmental systems, and is also in a unique position to inform the development of sustainable solutions to the nation’s energy and environmental challenges. Specifically, EESSD manages two scientific user facilities: the Atmospheric Radiation Measurement (ARM) user facility and the Environmental Molecular Sciences Laboratory (EMSL). These facilities provide the broader scientific community with scientific expertise, technical capabilities, and unique data sets to facilitate science in areas of importance to DOE. As a multi-platform scientific user facility, ARM aims to fulfill the needs predominantly within the EESSD Atmospheric System Research (ASR) and the Earth and Environmental System Modeling (EESM) mission areas, and provide the critical measurements required to improve understanding of aerosol and cloud life cycles and their interactions, and their coupling with the Earth’s surface. Over the years, ARM has carried out piloted and unmanned aircraft campaigns under different organizational and operational paradigms (Schmid et al. 2014, 2016). Building on its success, the ARM Aerial Facility (AAF) continues to complement the ground-based observations with airborne in situ cloud, aerosol, and trace gas observations as well as measurements of atmospheric state and atmospheric radiation. During the past three years, ARM has managed field campaigns using unmanned aerial systems (UAS) and tethered balloon systems (TBS) at Oliktok Point in Alaska to improve understanding of atmospheric processes in the Arctic. In 2019, following a careful evaluation of scientific community needs, ARM acquired a Bombardier Challenger 850 regional jet to replace the vintage Grumman Gulfstream-159 turboprop aircraft previously used by AAF. With this new “laboratory in the sky”, AAF is evaluating its current and future aerial observation capabilities to continue satisfying the needs of the research community.

54 ENVIRONMENTAL SCIENCES↗